Extracted from MTO on 06-Jul-2025 01:41,
last changed 05-Jul-2025.
# | Ver | Text | Start | End |
1 | 1 | All surface holes drilled for the purpose of exploration are to be capped, filled or otherwise made safe after completion. | 12-Aug-1998 | |
2 | 2 | All costeans and other disturbances to the surface of the land made as a result of exploration, including drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Industry and Resources (DoIR). Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, DoIR. | 12-Aug-2005 | |
2 | 1 | All costeans and other disturbances to the surface of the land made as a result of exploration, including drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the District Mining Engineer. Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the District Mining Engineer. | 12-Aug-1998 | 11-Aug-2005 |
3 | 1 | All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration programme. | 12-Aug-1998 | |
4 | 2 | Unless the written approval of the Environmental Officer, DoIR is first obtained, the use of scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations. | 12-Aug-2005 | |
4 | 1 | Unless the written approval of the District Mining Engineer is first obtained, the use of scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations. | 12-Aug-1998 | 11-Aug-2005 |
5 | 1 | The licensee notifying the holder of any underlying pastoral or grazing lease by telephone or in person, or by registered post if contact cannot be made, prior to undertaking airborne geophysical surveys or any ground disturbing activities utilising equipment such as scrapers, graders, bulldozers, backhoes, drilling rigs; water carting equipment or other mechanised equipment. | 12-Aug-1998 | |
6 | 1 | The licensee or transferee, as the case may be, shall within thirty (30) days of receiving written notification of:-- the grant of the licence; or
- registration of a transfer introducing a new licensee.
advise, by registered post, the holder of any underlying pastoral or grazing lease details of the grant or transfer. | 12-Aug-1998 | |
7 | 1 | No interference with Geodetic Survey Stations Trealla and mining within 15 metres thereof being confined to below a depth of 15 metres from the natural surface. | 12-Aug-1998 | |
| 1 | In respect to the area outline in turquoise on Tengraph, hereinafter referred to as the designated area, and the areas bordered red designated FNA's 1250, 1368 and 1369, the following apply: | 12-Aug-1998 | |
8 | 1 | Prior to any environmental disturbance, as defined by the State Mining Engineer, the licensee preparing a detailed program for each phase of proposed exploration for approval of the State Mining Engineer. This program to include:- maps and/or aerial photographs showing the proposed locations of all roads, tracks, camps, costeans and other and disturbances;
- the purpose, specifications and life of such roads, tracks, disturbances, etc;
- descriptions of all vegetation types (in general terms), land forms, and unusual features likely to be disturbed by such proposed disturbances;
- proposals which may disturb any declared rare or geographically restricted flora and fauna;
- techniques, prescriptions and timetable for the rehabilitation of all proposed disturbances.
- undertaking for corrective measures for failed rehabilitation;
- details of water requirements from within the designated area;
- proposals for instruction and supervision of personnel and contractors in respect to environmental conditions.
| 12-Aug-1998 | |
9 | 1 | At agreed intervals, not greater than 12 monthly, the licensee providing a brief report to the State Mining Engineer outlining the progress of the operation and rehabilitation program and the proposed operations and rehabilitation program for the next 12 months. | 12-Aug-1998 | |
10 | 1 | Prior to accessing the licence area, the licensee shall consult with the Regional Environmental Officer, Department of Minerals and Energy, and ensure that where required all vehicles and equipment entering the designated area are washed down to remove soil and plant propagules and adhering to such conditions specified for the prevention of the spread of soil-borne diseases. | 12-Aug-1998 | |
11 | 1 | Access to and from and the movement of vehicles within the licence area being restricted to ground or seasonal conditions and routes approved under the program or otherwise agreed by the Regional Environmental Officer, Department of Minerals and Energy. | 12-Aug-1998 | |
12 | 1 | Prior to the cessation of exploration/prospecting activity in the designated area, the licensee notifying the District Mining Engineer and arranging an inspection as required. | 12-Aug-1998 | |
| 1 | Consent to mine on Temporary Reserves 2614H and 5980H granted. | 12-Aug-1998 | |
Cond # | Ver | Text | Start | End |
1 | 1 | All surface holes drilled for the purpose of exploration are to be capped, filled or otherwise made safe after completion. | 12-Aug-1998 | |
2 | 2 | All costeans and other disturbances to the surface of the land made as a result of exploration, including drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Industry and Resources (DoIR). Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, DoIR. | 12-Aug-2005 | |
2 | 1 | All costeans and other disturbances to the surface of the land made as a result of exploration, including drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the District Mining Engineer. Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the District Mining Engineer. | 12-Aug-1998 | 11-Aug-2005 |
3 | 1 | All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration programme. | 12-Aug-1998 | |
4 | 2 | Unless the written approval of the Environmental Officer, DoIR is first obtained, the use of scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations. | 12-Aug-2005 | |
4 | 1 | Unless the written approval of the District Mining Engineer is first obtained, the use of scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations. | 12-Aug-1998 | 11-Aug-2005 |
5 | 1 | The licensee notifying the holder of any underlying pastoral or grazing lease by telephone or in person, or by registered post if contact cannot be made, prior to undertaking airborne geophysical surveys or any ground disturbing activities utilising equipment such as scrapers, graders, bulldozers, backhoes, drilling rigs; water carting equipment or other mechanised equipment. | 12-Aug-1998 | |
6 | 1 | The licensee or transferee, as the case may be, shall within thirty (30) days of receiving written notification of:-- the grant of the licence; or
- registration of a transfer introducing a new licensee.
advise, by registered post, the holder of any underlying pastoral or grazing lease details of the grant or transfer. | 12-Aug-1998 | |
7 | 1 | No interference with Geodetic Survey Stations Trealla and mining within 15 metres thereof being confined to below a depth of 15 metres from the natural surface. | 12-Aug-1998 | |
| 1 | In respect to the area outline in turquoise on Tengraph, hereinafter referred to as the designated area, and the areas bordered red designated FNA's 1250, 1368 and 1369, the following apply: | 12-Aug-1998 | |
8 | 1 | Prior to any environmental disturbance, as defined by the State Mining Engineer, the licensee preparing a detailed program for each phase of proposed exploration for approval of the State Mining Engineer. This program to include:- maps and/or aerial photographs showing the proposed locations of all roads, tracks, camps, costeans and other and disturbances;
- the purpose, specifications and life of such roads, tracks, disturbances, etc;
- descriptions of all vegetation types (in general terms), land forms, and unusual features likely to be disturbed by such proposed disturbances;
- proposals which may disturb any declared rare or geographically restricted flora and fauna;
- techniques, prescriptions and timetable for the rehabilitation of all proposed disturbances.
- undertaking for corrective measures for failed rehabilitation;
- details of water requirements from within the designated area;
- proposals for instruction and supervision of personnel and contractors in respect to environmental conditions.
| 12-Aug-1998 | |
9 | 1 | At agreed intervals, not greater than 12 monthly, the licensee providing a brief report to the State Mining Engineer outlining the progress of the operation and rehabilitation program and the proposed operations and rehabilitation program for the next 12 months. | 12-Aug-1998 | |
10 | 1 | Prior to accessing the licence area, the licensee shall consult with the Regional Environmental Officer, Department of Minerals and Energy, and ensure that where required all vehicles and equipment entering the designated area are washed down to remove soil and plant propagules and adhering to such conditions specified for the prevention of the spread of soil-borne diseases. | 12-Aug-1998 | |
11 | 1 | Access to and from and the movement of vehicles within the licence area being restricted to ground or seasonal conditions and routes approved under the program or otherwise agreed by the Regional Environmental Officer, Department of Minerals and Energy. | 12-Aug-1998 | |
12 | 1 | Prior to the cessation of exploration/prospecting activity in the designated area, the licensee notifying the District Mining Engineer and arranging an inspection as required. | 12-Aug-1998 | |
| 1 | Consent to mine on Temporary Reserves 2614H and 5980H granted. | 12-Aug-1998 | |
Type | Number | Details |
Conversion | 160598 | New Tenement:M 08/214Application Date:04 Jun 1999Section:S67Discontinued 23:59:59 04 November 2009 due to commencement of term of E08/1780 pursuant to Section 120AA and licence expired in respect to M 08/214 |
Conversion | 161141 | New Tenement:M 08/217Application Date:04 Jun 1999Section:S67Discontinued 23:59:59 04 November 2009 due to commencement of term of E08/1780 pursuant to Section 120AA and licence expired in respect to M 08/217 |
Conversion | 161142 | New Tenement:M 08/218Application Date:04 Jun 1999Section:S67Discontinued 00:00 04 November 2009 due to commencement of term of E08/1781 pursuant to Section 120AA and licence expired in respect to M 08/218 |
Conversion | 161143 | Section:S67Application Date:04 Jun 1999New Tenement:M 08/219Discontinued 23:59:59 04 November 2009 due to commencement of term of E08/1781 pursuant to Section 120AA and licence expired in respect to M 08/219 |
Conversion | 161144 | Section:S67Application Date:04 Jun 1999New Tenement:M 08/220Discontinued 23:59:59 04 November 2009 due to commencement of term of E08/1781 pursuant to Section 120AA and licence expired in respect to M 08/220 |
Conversion | 186895 | Lodged 10:50:00 AM on 04 Jun 1999 M08/216 applied for pursuant to Section 67.RECORDED 10:50 AM 04 Jun 1999 |
Conversion | 186896 | Lodged 10:50:00 AM on 04 Jun 1999 M08/215 applied for pursuant to Section 67.RECORDED 10:50 AM 04 Jun 1999 |
Conversion | 187954 | Section:S67Application Date:10:50 04 Jun 1999New Tenement:M 08/213Discontinued 23:59:59 04 November 2009 due to commencement of term of E08/1780 pursuant to Section 120AA and licence expired in respect to M 08/213 |
Plaint | CA5/990 | Lodged 3:30 PM on 26 Nov 1999 (for forfeiture) by GENT PTY LTDRECORDED 3:30 PM 26 Nov 1999WITHDRAWN by Leave of the Warden 14 Apr 2000 |
Exemption from Drop-off | 22H/012 | Lodged on 08 Aug 2001 applying for relief from the provisions of Section 65(1)(a)GRANTED 09 Aug 2001 |
Exemption from Drop-off | 15H/023 | Lodged on 01 Aug 2002 applying for relief from the provisions of Section 65(1)(b)GRANTED by the Minister for State Development 13 Aug 2002 |
Expiry - Partial | 185023 | This licence continues in force on and after 12.00 Midnight 11 Aug 2003 in respect to those portions of land comprised within applications for Mining Leases 08/213, 08/214, 08/215, 08/216, 08/217, 08/218, 08/219 & 08/220.EFFECTIVE:Midnight 11 August 2003 |
Extension of Time | 186234 | Lodged 3:09 PM on 03 Oct 2003 to extend time of lodgement of Form 5 for 2003 to 14 Nov 2003Approved on 03 Oct 2003 |
Extension of Time | 250873 | Lodged 5:14 PM on 07 Nov 2006 to lodge a statutory declaration in support of Applications 91/067 and 92/067 for exemption from expenditure condition until 21 November 2006Approved on 08 Nov 2006 |
Extension of Time | 301320 | Lodged 4:14 PM on 07 Oct 2008 to lodge a statutory declaration in support of application for exemption from expenditure condition until 14 October 2008Approved on 09 Oct 2008 |
Forfeiture | 317037 | Initiated:23/03/2009 for non-compliance with reporting requirementsRECORDED:10:39:52 23 March 2009Notice Issued:Regulation 50 Notice sent 23/03/2009 for non-compliance with reporting requirements pursuant to Sec 115A.Compliance Date:23/04/2009FINALISED:Order by Minister on 07 August 2009 that Penalty Imposed |
Fine | 327544 | Fine in respect to:Forfeiture Process 317037Fine reason:Non-compliance with mineral exploration reporting provisionsPenalty amount:$180.00Notification date:12/08/2009Due date:11/09/2009Pursuant to:Section 96A(5)RECORDED:12 August 2009PAYMENT RECEIVED:10 September 2009Receipt Number:69692Amount:$180.00Remaining balance:$0.00FINALISED:10 September 2009 |
Expiry - Partial | 333929 | On grant of E08/1780 and E08/1781 pursuant to Section 120AA, this licence continues in force on and after 12.00 Midnight 04 Nov 2009 in respect to those portions of land comprised within applications for Mining Leases 08/215 and 08/216.EFFECTIVE:23:59:59 04 November 2009 |
Forfeiture | 334881 | Initiated:18/11/2009 for non-compliance with expenditure conditionsRECORDED:11:01:07 18 November 2009Notice Issued:Regulation 50 Notice sent 18/11/2009 for non-compliance with expenditure conditions pursuant to Reg 21 & 22.Compliance Date:18/12/2009FINALISED:Order by Minister on 06 January 2010 that Penalty Imposed |
Fine | 338425 | Fine in respect to:Forfeiture Process 334881Fine reason:Non-compliance with expenditure obligationsPenalty amount:$270.00Notification date:12/01/2010Due date:11/02/2010Pursuant to:Section 96A(5)RECORDED:12 January 2010PAYMENT RECEIVED:22 January 2010Receipt Number:74781Amount:$270.00Remaining balance:$0.00FINALISED:22 January 2010 |
Extension of Time | 358575 | Lodged:15:15 01 November 2010Type:Stat DecRECORDED:15:15 01 November 2010Extension of time until 22 November 2010 to lodge statutory declaration in support of Appln 356719 for exemption from expenditure condition for the year ending 11 August 2010APPROVED:13:48:32 02 November 2010 |
Forfeiture | 369607 | Initiated:14/04/2011 for non-compliance with expenditure conditionsRECORDED:08:30 14 April 2011Notice Issued:Regulation 50 Notice sent 14/04/2011 for non-compliance with expenditure conditions pursuant to Reg 21 & 22.Compliance Date:14/05/2011FINALISED:Order by Minister on 22 July 2011 that E 08/1051 be Penalty Imposed |
Fine | 377690 | Fine in respect to:Forfeiture Process 369607Fine reason:Non-compliance with expenditure obligationsPenalty amount:$1,466.00Notification date:28/07/2011Due date:29/08/2011Pursuant to:Section 96A(5)RECORDED:28 July 2011PAYMENT RECEIVED:08 August 2011Receipt Number:98131Amount:$1,466.00Remaining balance:$0.00FINALISED:08 August 2011 |
Application to Amend | 486600 | Lodged:14:40 11 May 2016Amending:Address (Including DTC Details)From:LEARMONTH LIMESTONE PTY LTD, C/- WESTERN TENEMENT SERVICES, PO BOX 428, GREENWOOD LPO, WA, 6924To:LEARMONTH LIMESTONE PTY LTD, C/- WESTERN TENEMENT SERVICES, PO BOX 3285, EAST PERTH, WA, 6892RECORDED:14:40 11 May 2016 |
Extension of Time | 496330 | Lodged:15:12:32 01 November 2016Type:Stat DecRECORDED:15:12:32 01 November 2016APPROVED:11:13:57 02 November 2016Time to lodge extended to 15/11/2016 |
Extension of Time | 517841 | Lodged:16:26:19 06 November 2017Type:Stat DecRECORDED:16:26:19 06 November 2017APPROVED:09:16 08 November 2017Time to lodge extended to 14/11/2017 |
Extension of Time | 565330 | Lodged:11:59:08 23 October 2019Type:Form 5RECORDED:11:59:08 23 October 2019APPROVED:09:04:46 24 October 2019Time to lodge extended to 23/10/2019 |
Extension of Time | 565340 | Lodged:12:45 23 October 2019Type:Exemption from ExpenditureRECORDED:12:45 23 October 2019APPROVED:16:15 24 October 2019 |
Application to Amend | 683720 | Lodged:15:22:57 15 August 2023Amending:Address (Including DTC Details)From:Principal Place of Business : LEARMONTH LIMESTONE PTY LTD, SAME AS CORRESPONDENCE and DTC :LEARMONTH LIMESTONE PTY LTD, C/- WESTERN TENEMENT SERVICES, PO BOX 3285, EAST PERTH, WA, 6892To:Principal Place of Business : LEARMONTH LIMESTONE PTY LTD, C/- MCMAHON MINING TITLE SERVICES PTY LTD, PO BOX 6301, EAST PERTH, WA, 6892, xxxx@mmts.net.au, xxxxxxxxxxx997 and DTC :LEARMONTH LIMESTONE PTY LTD, MCMAHON MINING TITLE SERVICES PTY LTD, C/- MCMAHON MINING TITLE SERVICES PTY LTD, PO BOX 6301, EAST PERTH, WA, 6892, xxxx@mmts.net.au, xxxxxxxxxxx997RECORDED:15:22:57 15 August 2023 |