Extracted from MTO on 13-Jul-2025 00:42,
last changed 05-Jul-2025.
# | Ver | Text | Start | End |
1 | 1 | Exploration and prospecting disturbances, excluding supporting infrastructure, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Energy, Mines, Industry Regulation and Safety. Backfilling and rehabilitation being required no later than 12 months after completion of the activity unless otherwise approved in writing by the Environmental Officer, Department of Energy, Mines, Industry Regulation and Safety. | 05-May-2025 | |
2 | 1 | All waste, rubbish, equipment, and buildings must be progressively removed from the tenement or disposed of in an appropriate manner to the satisfaction of the Environmental Officer, Department of Energy, Mines, Industry Regulation and Safety. | 05-May-2025 | |
3 | 1 | The Licensee making verbal or written contact with the holder of any underlying pastoral or grazing lease within a reasonable time prior to undertaking airborne geophysical surveys or any ground disturbing activities utilising equipment such as scrapers, graders, bulldozers, backhoes, drilling rigs; water carting equipment or other mechanised equipment. | 05-May-2025 | |
4 | 1 | The Licensee or transferee, as the case may be, shall within thirty (30) days of receiving written notification of:-- the grant of the Licence; or
- registration of a transfer introducing a new Licensee;
advise, by registered post, the holder of any underlying pastoral or grazing lease details of the grant or transfer. | 05-May-2025 | |
5 | 1 | No interference with Geodetic Survey Station Broomes 26, 26T, Derby 144 and 157 and mining within 15 metres thereof being confined to below a depth of 15 metres from the natural surface. | 05-May-2025 | |
6 | 2 | No exploration activities on an area designated as File Notation Area (FNA 13968 - Port of Derby) in the TENGRAPH electronic plan of the Department of Energy, Mines, Industry Regulation and Safety, without the written consent of the Minister responsible for the Mining Act 1978. | 05-May-2025 | |
6 | 1 | No exploration activities on an area designated as File Notation Area (FNA 13968 - Port of Derby) in the TENGRAPH electronic plan of the Department of Energy, Mines, Industry Regulation and Safety, without the written consent of the Minister responsible for the Mining Act 1978. | 05-May-2025 | 05-May-2025 |
7 | 1 | Mining on a strip of land 20 metres wide with any pipeline as the centreline being confined to below a depth of 31 metres from the natural surface and no mining material being deposited upon such strip and the rights of ingress to and egress from the facility being at all times preserved to the owners thereof. | 05-May-2025 | |
8 | 1 | In respect of the area covered by the licence the licensee, if so requested in writing by the native title applicants in Federal Court application No. WAD5982016, Boorroola Moorrool Moorrool (the "native title party"), such request being sent by pre-paid post to reach the licensee's or agent's address not more than ninety days after the grant of this licence, shall within thirty days of the request execute in favour of the native title party any Regional Standard Heritage Agreement ("RSHA") nominated by the native title party, the RSHA being any of the agreements described as the Yamatji Marlpa Aboriginal Corporation (Geraldton and Pilbara) Agreement, the Goldfields Land and Sea Council Agreement, and the South West Land and Sea Council Agreement on the website of the Department administering the Mining Act 1978 (WA) under the heading "Regional Standard Heritage Agreement".
| 05-May-2025 | |
| 1 | Consent to explore on the Foreshore, Seabed and Navigable Waters (but not the Port of Derby contained within FNA 13968) granted subject to the following further conditions: | 05-May-2025 | |
9 | 1 | Unless the written approval of the Executive Director, Resource and Environmental Compliance, Department of Energy, Mines, Industry Regulation and Safety (DEMIRS) is first obtained exploration operations within the licence area being restricted to the following activities:
- reconnaissance by aircraft, helicopter, hovercraft, boat and amphibious vehicle;
- bathymetric sounding and side scan sonar profiling, airborne radiometric and magnetic surveys, sea floor mapping, imagery and photography;
- seismic survey (non-explosive) subject to whale, turtle watch and fishery protection procedures prescribed by the Department of Biodiversity Conservation and Attractions (DBCA) and Department of Primary Industries and Regional Development.
| 05-May-2025 | |
10 | 1 | Prior to any activity involving environmental disturbance to the seabed and general marine environment including:
- vibro and shallow coring
- drilling
- sampling (grab, siphoning, etc.)
- dredging
the licensee providing a detailed exploration program for written approval of the Executive Director, Resource and Environmental Compliance, DEMIRS in consultation with the Department of Biodiversity Conservation and Attractions (DBCA) and the Department of Primary Industries and Regional Development. This program to describe the environmental impacts and management program and is to include the following:
- maps and/or aerial photography showing the proposed locations of all ground surface and seabed activities;
- the purpose, specifications and extent of each activity;
- details on proposals which are likely to affect sensitive marine habitats/resources;
- details of techniques, prescriptions and timetables for management of all proposed disturbances;
- proposals for instruction and supervision of personnel and contractors in respect to environmental conditions.
| 05-May-2025 | |
11 | 1 | The licensee not establishing any camping facilities, access tracks, boat moorings, fuel depots or similar establishments on any coastal mangrove areas or beach/foreshore environments without the prior written approval of the Executive Director, Resource and Environmental Compliance, DEMIRS in consultation with the Regional Manager, DBCA. | 05-May-2025 | |
12 | 1 | No landing on any offshore islands without a quarantine program receiving the prior written approval of the Regional Manager, DBCA. | 05-May-2025 | |
13 | 1 | No dumping of rubbish, discharge of fuel, oil or other pollutants into the marine environment. | 05-May-2025 | |
14 | 1 | Damage to coral reefs, seagrass meadows and mangroves being avoided. | 05-May-2025 | |
15 | 1 | Turtle and bird nesting areas not being disturbed. | 05-May-2025 | |
16 | 1 | Only low toxicity drilling muds or additives being used in offshore drilling operations. | 05-May-2025 | |
17 | 1 | No explosives being used in exploration without the prior written approval of the Executive Director, Resource and Environmental Compliance, Department of Energy, Mines, Industry Regulation and Safety (DEMIRS). | 05-May-2025 | |
18 | 1 | Accidental spillages of fuel, oil or other pollutants of an amount greater than 80 litres being reported to the DBCA within 12 hours of any such spillage occurring. | 05-May-2025 | |
19 | 1 | At agreed intervals, not greater than 12 monthly, the licensee providing a brief report to the Executive Director, Resource and Environmental Compliance, DEMIRS outlining the progress of the current and proposed exploration and environmental management program. | 05-May-2025 | |
20 | 1 | Prior to the cessation of exploration activity the licensee notifying the Executive Director, Resource and Environmental Compliance, DEMIRS and the Regional Manager, DBCA and arranging an inspection as required. | 05-May-2025 | |
21 | 1 | If in the opinion of the Executive Director, Resource and Environmental Compliance, DEMIRS the exploration operations are causing any damage to or undue interference with living marine resources or their environment on any part or parts of the licence area, the licensee ceasing exploration on such part or parts within 24 hours of notification from the Executive Director, Resource and Environmental Compliance, DEMIRS. | 05-May-2025 | |
22 | 1 | The licensee carrying out exploration activities in such a manner as not to damage any pipeline, wellhead, capped well or other equipment associated with seabed exploration and mining. | 05-May-2025 | |
Cond # | Ver | Text | Start | End |
1 | 1 | Exploration and prospecting disturbances, excluding supporting infrastructure, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Energy, Mines, Industry Regulation and Safety. Backfilling and rehabilitation being required no later than 12 months after completion of the activity unless otherwise approved in writing by the Environmental Officer, Department of Energy, Mines, Industry Regulation and Safety. | 05-May-2025 | |
2 | 1 | All waste, rubbish, equipment, and buildings must be progressively removed from the tenement or disposed of in an appropriate manner to the satisfaction of the Environmental Officer, Department of Energy, Mines, Industry Regulation and Safety. | 05-May-2025 | |
3 | 1 | The Licensee making verbal or written contact with the holder of any underlying pastoral or grazing lease within a reasonable time prior to undertaking airborne geophysical surveys or any ground disturbing activities utilising equipment such as scrapers, graders, bulldozers, backhoes, drilling rigs; water carting equipment or other mechanised equipment. | 05-May-2025 | |
4 | 1 | The Licensee or transferee, as the case may be, shall within thirty (30) days of receiving written notification of:-- the grant of the Licence; or
- registration of a transfer introducing a new Licensee;
advise, by registered post, the holder of any underlying pastoral or grazing lease details of the grant or transfer. | 05-May-2025 | |
5 | 1 | No interference with Geodetic Survey Station Broomes 26, 26T, Derby 144 and 157 and mining within 15 metres thereof being confined to below a depth of 15 metres from the natural surface. | 05-May-2025 | |
6 | 2 | No exploration activities on an area designated as File Notation Area (FNA 13968 - Port of Derby) in the TENGRAPH electronic plan of the Department of Energy, Mines, Industry Regulation and Safety, without the written consent of the Minister responsible for the Mining Act 1978. | 05-May-2025 | |
6 | 1 | No exploration activities on an area designated as File Notation Area (FNA 13968 - Port of Derby) in the TENGRAPH electronic plan of the Department of Energy, Mines, Industry Regulation and Safety, without the written consent of the Minister responsible for the Mining Act 1978. | 05-May-2025 | 05-May-2025 |
7 | 1 | Mining on a strip of land 20 metres wide with any pipeline as the centreline being confined to below a depth of 31 metres from the natural surface and no mining material being deposited upon such strip and the rights of ingress to and egress from the facility being at all times preserved to the owners thereof. | 05-May-2025 | |
8 | 1 | In respect of the area covered by the licence the licensee, if so requested in writing by the native title applicants in Federal Court application No. WAD5982016, Boorroola Moorrool Moorrool (the "native title party"), such request being sent by pre-paid post to reach the licensee's or agent's address not more than ninety days after the grant of this licence, shall within thirty days of the request execute in favour of the native title party any Regional Standard Heritage Agreement ("RSHA") nominated by the native title party, the RSHA being any of the agreements described as the Yamatji Marlpa Aboriginal Corporation (Geraldton and Pilbara) Agreement, the Goldfields Land and Sea Council Agreement, and the South West Land and Sea Council Agreement on the website of the Department administering the Mining Act 1978 (WA) under the heading "Regional Standard Heritage Agreement".
| 05-May-2025 | |
| 1 | Consent to explore on the Foreshore, Seabed and Navigable Waters (but not the Port of Derby contained within FNA 13968) granted subject to the following further conditions: | 05-May-2025 | |
9 | 1 | Unless the written approval of the Executive Director, Resource and Environmental Compliance, Department of Energy, Mines, Industry Regulation and Safety (DEMIRS) is first obtained exploration operations within the licence area being restricted to the following activities:
- reconnaissance by aircraft, helicopter, hovercraft, boat and amphibious vehicle;
- bathymetric sounding and side scan sonar profiling, airborne radiometric and magnetic surveys, sea floor mapping, imagery and photography;
- seismic survey (non-explosive) subject to whale, turtle watch and fishery protection procedures prescribed by the Department of Biodiversity Conservation and Attractions (DBCA) and Department of Primary Industries and Regional Development.
| 05-May-2025 | |
10 | 1 | Prior to any activity involving environmental disturbance to the seabed and general marine environment including:
- vibro and shallow coring
- drilling
- sampling (grab, siphoning, etc.)
- dredging
the licensee providing a detailed exploration program for written approval of the Executive Director, Resource and Environmental Compliance, DEMIRS in consultation with the Department of Biodiversity Conservation and Attractions (DBCA) and the Department of Primary Industries and Regional Development. This program to describe the environmental impacts and management program and is to include the following:
- maps and/or aerial photography showing the proposed locations of all ground surface and seabed activities;
- the purpose, specifications and extent of each activity;
- details on proposals which are likely to affect sensitive marine habitats/resources;
- details of techniques, prescriptions and timetables for management of all proposed disturbances;
- proposals for instruction and supervision of personnel and contractors in respect to environmental conditions.
| 05-May-2025 | |
11 | 1 | The licensee not establishing any camping facilities, access tracks, boat moorings, fuel depots or similar establishments on any coastal mangrove areas or beach/foreshore environments without the prior written approval of the Executive Director, Resource and Environmental Compliance, DEMIRS in consultation with the Regional Manager, DBCA. | 05-May-2025 | |
12 | 1 | No landing on any offshore islands without a quarantine program receiving the prior written approval of the Regional Manager, DBCA. | 05-May-2025 | |
13 | 1 | No dumping of rubbish, discharge of fuel, oil or other pollutants into the marine environment. | 05-May-2025 | |
14 | 1 | Damage to coral reefs, seagrass meadows and mangroves being avoided. | 05-May-2025 | |
15 | 1 | Turtle and bird nesting areas not being disturbed. | 05-May-2025 | |
16 | 1 | Only low toxicity drilling muds or additives being used in offshore drilling operations. | 05-May-2025 | |
17 | 1 | No explosives being used in exploration without the prior written approval of the Executive Director, Resource and Environmental Compliance, Department of Energy, Mines, Industry Regulation and Safety (DEMIRS). | 05-May-2025 | |
18 | 1 | Accidental spillages of fuel, oil or other pollutants of an amount greater than 80 litres being reported to the DBCA within 12 hours of any such spillage occurring. | 05-May-2025 | |
19 | 1 | At agreed intervals, not greater than 12 monthly, the licensee providing a brief report to the Executive Director, Resource and Environmental Compliance, DEMIRS outlining the progress of the current and proposed exploration and environmental management program. | 05-May-2025 | |
20 | 1 | Prior to the cessation of exploration activity the licensee notifying the Executive Director, Resource and Environmental Compliance, DEMIRS and the Regional Manager, DBCA and arranging an inspection as required. | 05-May-2025 | |
21 | 1 | If in the opinion of the Executive Director, Resource and Environmental Compliance, DEMIRS the exploration operations are causing any damage to or undue interference with living marine resources or their environment on any part or parts of the licence area, the licensee ceasing exploration on such part or parts within 24 hours of notification from the Executive Director, Resource and Environmental Compliance, DEMIRS. | 05-May-2025 | |
22 | 1 | The licensee carrying out exploration activities in such a manner as not to damage any pipeline, wellhead, capped well or other equipment associated with seabed exploration and mining. | 05-May-2025 | |
Type | Number | Details |
Application to Amend | 682240 | Lodged:10:00 27 July 2023Amending:Address (Including DTC Details)From:Principal Place of Business : RAND MINING LIMITED, C/- TENEMENT ADMINISTRATION SERVICES PTY LTD, LEVEL 2, 326 HAY STREET, EAST PERTH, WA, 6004, xxxxxx@landadmin.com.au, xxxxx777 and DTC :RAND MINING LIMITED, AMANDA SMITH, C/- TENEMENT ADMINISTRATION SERVICES PTY LTD, LEVEL 2, 326 HAY STREET, EAST PERTH, WA, 6004, xxxxxx@landadmin.com.au, xxxxx777To:Principal Place of Business : RAND MINING LIMITED, C/- AUSTRALIAN MINING AND EXPLORATION TITLE SERVICES PTY LTD, PO BOX 40, DUNCRAIG, WA, 6023, xx@amets.com.au, xxxxxxxxx853 and DTC :RAND MINING LIMITED, AUSTRALIAN MINING AND EXPLORATION TITLE SERVICES PTY LTD, C/- AUSTRALIAN MINING AND EXPLORATION TITLE SERVICES PTY LTD, PO BOX 40, DUNCRAIG, WA, 6023, xx@amets.com.au, xxxxxxxxx853RECORDED:10:00 27 July 2023 |