Extracted from MTO on 12-Jul-2025 00:19,
last changed 26-Jun-2025.
# | Ver | Text | Start | End |
1 | 1 | All disturbances to the surface of the land made as a result of exploration, including costeans, drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Mines, Industry Regulation and Safety. Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, Department of Mines, Industry Regulation and Safety. | 03-Oct-2019 | |
2 | 1 | All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program. | 03-Oct-2019 | |
3 | 1 | Unless the written approval of the Environmental Officer, Department of Mines, Industry Regulation and Safety is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations. | 03-Oct-2019 | |
4 | 1 | The Licensee notifying the holder of any underlying pastoral or grazing lease by telephone or in person, or by registered post if contact cannot be made, prior to undertaking airborne geophysical surveys or any ground disturbing activities utilising equipment such as scrapers, graders, bulldozers, backhoes, drilling rigs; water carting equipment or other mechanised equipment. | 03-Oct-2019 | |
5 | 1 | The Licensee or transferee, as the case may be, shall within thirty (30) days of receiving written notification of:-- the grant of the Licence; or
- registration of a transfer introducing a new Licensee;
advise, by registered post, the holder of any underlying pastoral or grazing lease details of the grant or transfer. | 03-Oct-2019 | |
6 | 1 | No mining within 25 metres of either side of the petroleum pipeline licence area of PL 109 and to a depth of 50 metres being the Consultation Area as shown in TENGRAPH, without the mining tenement holder and the petroleum pipeline licensee consulting with each other and reaching agreement on access and mining activities to be undertaken within the Consultation Area. | 03-Oct-2019 | |
7 | 1 | No surface excavation approaching closer to the boundary of the Consultation Area than a distance equal to three times the depth of the excavation without the mining tenement holder and the petroleum pipeline licensee reaching agreement as to a lesser distance. | 03-Oct-2019 | |
8 | 1 | No explosives being used or stored within 150 metres of the petroleum licence area without the mining tenement holder and the petroleum pipeline licensee reaching agreement as to a lesser distance. | 03-Oct-2019 | |
9 | 1 | The rights of ingress to and egress from the petroleum pipeline licence area being at all times preserved for the employees, contractors and agents of the owners and operators of the pipeline. | 03-Oct-2019 | |
10 | 1 | Such further conditions as may from time to time be imposed by the Minister responsible for the Mining Act 1978 for the purposes of protecting the pipeline and any existing condition imposed for this purpose may be cancelled or varied. | 03-Oct-2019 | |
11 | 1 | No interference with Geodetic Survey Station NMF 682 and mining within 15 metres thereof being confined to below a depth of 15 metres from the natural surface. | 03-Oct-2019 | |
Cond # | Ver | Text | Start | End |
1 | 1 | All disturbances to the surface of the land made as a result of exploration, including costeans, drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Mines, Industry Regulation and Safety. Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, Department of Mines, Industry Regulation and Safety. | 03-Oct-2019 | |
2 | 1 | All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program. | 03-Oct-2019 | |
3 | 1 | Unless the written approval of the Environmental Officer, Department of Mines, Industry Regulation and Safety is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations. | 03-Oct-2019 | |
4 | 1 | The Licensee notifying the holder of any underlying pastoral or grazing lease by telephone or in person, or by registered post if contact cannot be made, prior to undertaking airborne geophysical surveys or any ground disturbing activities utilising equipment such as scrapers, graders, bulldozers, backhoes, drilling rigs; water carting equipment or other mechanised equipment. | 03-Oct-2019 | |
5 | 1 | The Licensee or transferee, as the case may be, shall within thirty (30) days of receiving written notification of:-- the grant of the Licence; or
- registration of a transfer introducing a new Licensee;
advise, by registered post, the holder of any underlying pastoral or grazing lease details of the grant or transfer. | 03-Oct-2019 | |
6 | 1 | No mining within 25 metres of either side of the petroleum pipeline licence area of PL 109 and to a depth of 50 metres being the Consultation Area as shown in TENGRAPH, without the mining tenement holder and the petroleum pipeline licensee consulting with each other and reaching agreement on access and mining activities to be undertaken within the Consultation Area. | 03-Oct-2019 | |
7 | 1 | No surface excavation approaching closer to the boundary of the Consultation Area than a distance equal to three times the depth of the excavation without the mining tenement holder and the petroleum pipeline licensee reaching agreement as to a lesser distance. | 03-Oct-2019 | |
8 | 1 | No explosives being used or stored within 150 metres of the petroleum licence area without the mining tenement holder and the petroleum pipeline licensee reaching agreement as to a lesser distance. | 03-Oct-2019 | |
9 | 1 | The rights of ingress to and egress from the petroleum pipeline licence area being at all times preserved for the employees, contractors and agents of the owners and operators of the pipeline. | 03-Oct-2019 | |
10 | 1 | Such further conditions as may from time to time be imposed by the Minister responsible for the Mining Act 1978 for the purposes of protecting the pipeline and any existing condition imposed for this purpose may be cancelled or varied. | 03-Oct-2019 | |
11 | 1 | No interference with Geodetic Survey Station NMF 682 and mining within 15 metres thereof being confined to below a depth of 15 metres from the natural surface. | 03-Oct-2019 | |
Type | Number | Details |
Partial Surrender - Voluntary | 576405 | Lodged:14:00:31 20 April 2020Surrendered Blocks:BROOME 1692 p, u, z
BROOME 1693 l, q, v
BROOME 1765 aSurrendered Total:7 BL.REGISTERED:14:00:31 20 April 2020 |
Extension / Renewal of Term | 716153 | Lodged:15:39:40 02 October 2024RECORDED:15:39:40 02 October 2024GRANTED:13 December 2024Granted Period:5 YearsTerm Extended To:02/10/2029 |
Extension of Time | 721082 | Lodged:14:43:46 03 December 2024Type:Form 5RECORDED:14:43:46 03 December 2024WITHDRAWN:14:27 06 December 2024 |
Extension of Time | 721377 | Lodged:15:34 05 December 2024Type:Form 5RECORDED:15:34 05 December 2024APPROVED:14:23:36 06 December 2024Ext of Time to lodge Form 5 extended until 3/12/2024 |
Extension of Time | 723420 | Lodged:14:57:10 13 January 2025Type:Stat DecRECORDED:14:57:10 13 January 2025APPROVED:16:07:39 29 January 2025Time to lodge Statutory Declaration in relation to Exemption from Expenditure extended to 13 January 2025. |
Partial Surrender - Voluntary | 725114 | Lodged:11:25:34 06 February 2025Surrendered Blocks:BROOME 1691 u
BROOME 1692 q
BROOME 1764 bSurrendered Total:3 BL.REJECTED:11:25:34 06 February 2025 |