Extracted from MTO on 04-Jul-2025 00:44,
last changed 04-Jul-2025.
# | Ver | Text | Start | End |
1 | 1 | All disturbances to the surface of the land made as a result of exploration, including costeans, drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Mines, Industry Regulation and Safety. Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, Department of Mines, Industry Regulation and Safety. | 30-Jul-2019 | |
2 | 1 | All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program. | 30-Jul-2019 | |
3 | 1 | Unless the written approval of the Environmental Officer, Department of Mines, Industry Regulation and Safety is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations. | 30-Jul-2019 | |
4 | 1 | No interference with Geodetic Survey Station SQUARE TOP and mining within 15 metres thereof being confined to below a depth of 15 metres from the natural surface. | 30-Jul-2019 | |
5 | 2 | The prior written consent of the Minister responsible for the Mining Act 1978 being obtained before commencing any exploration activities on Use and Benefit of Aborigines Reserve 30674, foreshore, seabed and navigable waters and Meda Location 15 (Yampi Defence Area CHL/105418).
| 10-May-2022 | |
5 | 1 | The prior written consent of the Minister responsible for the Mining Act 1978 being obtained before commencing any exploration activities on Use and Benefit of Aborigines Reserve 30674, foreshore, seabed and navigable waters and Meda Location 15 (Yampi Defence Area CHL/105418). | 30-Jul-2019 | 09-May-2022 |
| 1 | Consent to explore on Meda location 15 (Yampi Defence Training Area) granted subject to: | 10-May-2022 | |
6 | 1 | The Australian Government not guaranteeing access to the Commonwealth land. | 10-May-2022 | |
7 | 1 | The licensee obtaining the relevant approvals required under the Land Acquisitions Act 1989 (Cth). | 10-May-2022 | |
8 | 1 | If deed of access is granted, exploration activities being limited to those specified in the deed. | 10-May-2022 | |
9 | 1 | Any proposed future mining activities, being subject to seperate approval required under the Lands Acquisitions Act 1989 (Cth). | 10-May-2022 | |
Cond # | Ver | Text | Start | End |
1 | 1 | All disturbances to the surface of the land made as a result of exploration, including costeans, drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Mines, Industry Regulation and Safety. Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, Department of Mines, Industry Regulation and Safety. | 30-Jul-2019 | |
2 | 1 | All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program. | 30-Jul-2019 | |
3 | 1 | Unless the written approval of the Environmental Officer, Department of Mines, Industry Regulation and Safety is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations. | 30-Jul-2019 | |
4 | 1 | No interference with Geodetic Survey Station SQUARE TOP and mining within 15 metres thereof being confined to below a depth of 15 metres from the natural surface. | 30-Jul-2019 | |
5 | 2 | The prior written consent of the Minister responsible for the Mining Act 1978 being obtained before commencing any exploration activities on Use and Benefit of Aborigines Reserve 30674, foreshore, seabed and navigable waters and Meda Location 15 (Yampi Defence Area CHL/105418).
| 10-May-2022 | |
5 | 1 | The prior written consent of the Minister responsible for the Mining Act 1978 being obtained before commencing any exploration activities on Use and Benefit of Aborigines Reserve 30674, foreshore, seabed and navigable waters and Meda Location 15 (Yampi Defence Area CHL/105418). | 30-Jul-2019 | 09-May-2022 |
| 1 | Consent to explore on Meda location 15 (Yampi Defence Training Area) granted subject to: | 10-May-2022 | |
6 | 1 | The Australian Government not guaranteeing access to the Commonwealth land. | 10-May-2022 | |
7 | 1 | The licensee obtaining the relevant approvals required under the Land Acquisitions Act 1989 (Cth). | 10-May-2022 | |
8 | 1 | If deed of access is granted, exploration activities being limited to those specified in the deed. | 10-May-2022 | |
9 | 1 | Any proposed future mining activities, being subject to seperate approval required under the Lands Acquisitions Act 1989 (Cth). | 10-May-2022 | |
Type | Number | Details |
Extension of Time | 534456 | Lodged:09:47:47 06 July 2018Service on the Private Land HolderRECORDED:09:47:47 06 July 2018APPROVED:16:12 12 July 2018 |
Application to Amend | 545219 | Lodged:11:13:42 20 December 2018Amending:Address (Including DTC Details)From:Principal Place of Business : BUXTON RESOURCES LTD, PO BOX 8197, SUBIACO EAST, WA, 6008 and DTC :BUXTON RESOURCES LTD, C/- M & M WALTER CONSULTING, PO BOX 8197, SUBIACO EAST, WA, 6008, xxxxxx@mmwc.com.au, xxxxx866To:Principal Place of Business : BUXTON RESOURCES LTD, PO BOX 496, SOUTH PERTH, WA, 6951, xxxxxxxxxxxxxxxxx@Igo.com.au, xxxxx352 and DTC :BUXTON RESOURCES LTD, C/-INDEPENDENCE GROUP NL, PO BOX 496, SOUTH PERTH, WA, 6951, xxxxxxxxxxxxxxxxx@Igo.com.au, xxxxx352RECORDED:11:13:42 20 December 2018 |
Application to Amend | 621223 | Lodged:12:42:22 27 April 2021Amending:Address (Including DTC Details)From:BUXTON RESOURCES LTD, C/-INDEPENDENCE GROUP NL, PO BOX 496, SOUTH PERTH, WA, 6951, xxxxxxxxxxxxxxxxx@igo.com.au, xxxxx352To:BUXTON RESOURCES LTD, C/- IGO LIMITED, PO BOX 496, SOUTH PERTH, WA, 6951, xxxxxxxxxxxxxxxxx@igo.com.au, xxxxx352RECORDED:12:42:22 27 April 2021 |
Surrender - Outright | 657370 | Lodged:14:47:47 30 August 2022REGISTERED:14:47:47 30 August 2022 |
Referred to Native Title Date | Referral Type | Current Status | Procedure | Details | Objections | Water Comments | Determination Areas | Claims | Representative Area Bodies |
15-Aug-2018 | Tenement Application | RTN Procedure : Right to Negotiate Cleared - Grant | RTN Procedure | 21 BL163129S1234129E86km N'ly of Derby | | | | Dambimangari(WC1999/007)WC1999/007WAD6061/1998falseDeterminedNeg Outcome Activity - Finalised
| 10KimberleyKimberley Land Council Aboriginal Corporation |
15-Aug-2018 | Tenement Application | Expedited Procedure : Expedited Does Not Apply | Expedited Procedure | 2018-08-312018-12-31FINALISED - Expedited Does Not Apply2019-07-1221 BL163129S1234129E86km N'ly of Derby | WO2018/10182018-12-06WC1999/007Objection Upheld2019-07-12 | | DAMBIMANGARI(WCD2011/002)WC1999/007WAD6061/1998trueWCD2011/002150EXISTYes | | 10KimberleyKimberley Land Council Aboriginal Corporation |