Extracted from MTO on 15-Jul-2025 00:31,
last changed 26-Jun-2025.
# | Ver | Text | Start | End |
1 | 1 | Exploration and prospecting disturbances, excluding supporting infrastructure, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Energy, Mines, Industry Regulation and Safety. Backfilling and rehabilitation being required no later than 12 months after completion of the activity unless otherwise approved in writing by the Environmental Officer, Department of Energy, Mines, Industry Regulation and Safety. | 10-Jun-2025 | |
2 | 1 | All waste, rubbish, equipment, and buildings must be progressively removed from the tenement or disposed of in an appropriate manner to the satisfaction of the Environmental Officer, Department of Energy, Mines, Industry Regulation and Safety. | 10-Jun-2025 | |
3 | 1 | The Licensee making verbal or written contact with the holder of any underlying pastoral or grazing lease within a reasonable time prior to undertaking airborne geophysical surveys or any ground disturbing activities utilising equipment such as scrapers, graders, bulldozers, backhoes, drilling rigs; water carting equipment or other mechanised equipment. | 10-Jun-2025 | |
4 | 1 | The Licensee or transferee, as the case may be, shall within thirty (30) days of receiving written notification of:-- the grant of the Licence; or
- registration of a transfer introducing a new Licensee;
advise, by registered post, the holder of any underlying pastoral or grazing lease details of the grant or transfer. | 10-Jun-2025 | |
5 | 1 | No interference with Geodetic Survey Station PITTARD and mining within 15 metres thereof being confined to below a depth of 15 metres from the natural surface. | 10-Jun-2025 | |
6 | 1 | The prior written consent of the Minister responsible for the Mining Act 1978 being obtained before commencing any exploration activities on Conservation Park 46235 and A Class Reserve 54262 . | 10-Jun-2025 | |
Cond # | Ver | Text | Start | End |
1 | 1 | Exploration and prospecting disturbances, excluding supporting infrastructure, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Energy, Mines, Industry Regulation and Safety. Backfilling and rehabilitation being required no later than 12 months after completion of the activity unless otherwise approved in writing by the Environmental Officer, Department of Energy, Mines, Industry Regulation and Safety. | 10-Jun-2025 | |
2 | 1 | All waste, rubbish, equipment, and buildings must be progressively removed from the tenement or disposed of in an appropriate manner to the satisfaction of the Environmental Officer, Department of Energy, Mines, Industry Regulation and Safety. | 10-Jun-2025 | |
3 | 1 | The Licensee making verbal or written contact with the holder of any underlying pastoral or grazing lease within a reasonable time prior to undertaking airborne geophysical surveys or any ground disturbing activities utilising equipment such as scrapers, graders, bulldozers, backhoes, drilling rigs; water carting equipment or other mechanised equipment. | 10-Jun-2025 | |
4 | 1 | The Licensee or transferee, as the case may be, shall within thirty (30) days of receiving written notification of:-- the grant of the Licence; or
- registration of a transfer introducing a new Licensee;
advise, by registered post, the holder of any underlying pastoral or grazing lease details of the grant or transfer. | 10-Jun-2025 | |
5 | 1 | No interference with Geodetic Survey Station PITTARD and mining within 15 metres thereof being confined to below a depth of 15 metres from the natural surface. | 10-Jun-2025 | |
6 | 1 | The prior written consent of the Minister responsible for the Mining Act 1978 being obtained before commencing any exploration activities on Conservation Park 46235 and A Class Reserve 54262 . | 10-Jun-2025 | |
Type | Number | Details |
Application to Amend | 565127 | Lodged:10:05 21 October 2019REJECTED:10:05 21 October 2019 |
Referred to Native Title Date | Referral Type | Current Status | Procedure | Details | Objections | Water Comments | Determination Areas | Claims | Representative Area Bodies |
31-May-2018 | Tenement Application | RTN Procedure : Native Title Cleared - Other Reason | RTN Procedure | 85 BL173030S1255025E78.7km N'ly of Fitzroy Crossing2020-02-04 | | | | Bunuba(WC1999/019)WC1999/019WAD6133/1998falseDeterminedSection 31 Neg Activity - Finalised Bunuba #2 Part B(WC2012/004)WC2012/004WAD94/2012falseDeterminedSection 31 Neg Activity - Finalised
| 10KimberleyKimberley Land Council Aboriginal Corporation |
31-May-2018 | Tenement Application | Expedited Procedure : Expedited Does Not Apply | Expedited Procedure | 2018-06-222018-10-22FINALISED - Expedited Does Not Apply2019-12-0285 BL173030S1255025E78.7km N'ly of Fitzroy Crossing | WO2018/08122018-10-12WC2012/004Objection Upheld2019-11-27 | | BUNUBA(WCD2012/006)WC1999/019WAD6133/1998falseWCD2012/006BOTHNoBunuba People #2 Part A(WCD2015/009)WC2012/004WAD94/2012falseWCD2015/009BOTHNo | | 10KimberleyKimberley Land Council Aboriginal Corporation |