Extracted from MTO on 02-Jul-2025 00:25,
last changed 27-Jun-2025.
# | Ver | Text | Start | End |
1 | 1 | All disturbances to the surface of the land made as a result of exploration, including costeans, drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Mines, Industry Regulation and Safety. Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, Department of Mines, Industry Regulation and Safety. | 13-Feb-2020 | |
2 | 1 | All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program. | 13-Feb-2020 | |
3 | 1 | Unless the written approval of the Environmental Officer, Department of Mines, Industry Regulation and Safety is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations. | 13-Feb-2020 | |
4 | 1 | The Licensee notifying the holder of any underlying pastoral or grazing lease by telephone or in person, or by registered post if contact cannot be made, prior to undertaking airborne geophysical surveys or any ground disturbing activities utilising equipment such as scrapers, graders, bulldozers, backhoes, drilling rigs; water carting equipment or other mechanised equipment. | 13-Feb-2020 | |
5 | 1 | The Licensee or transferee, as the case may be, shall within thirty (30) days of receiving written notification of:-- the grant of the Licence; or
- registration of a transfer introducing a new Licensee;
advise, by registered post, the holder of any underlying pastoral or grazing lease details of the grant or transfer. | 13-Feb-2020 | |
Cond # | Ver | Text | Start | End |
1 | 1 | All disturbances to the surface of the land made as a result of exploration, including costeans, drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Mines, Industry Regulation and Safety. Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, Department of Mines, Industry Regulation and Safety. | 13-Feb-2020 | |
2 | 1 | All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program. | 13-Feb-2020 | |
3 | 1 | Unless the written approval of the Environmental Officer, Department of Mines, Industry Regulation and Safety is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations. | 13-Feb-2020 | |
4 | 1 | The Licensee notifying the holder of any underlying pastoral or grazing lease by telephone or in person, or by registered post if contact cannot be made, prior to undertaking airborne geophysical surveys or any ground disturbing activities utilising equipment such as scrapers, graders, bulldozers, backhoes, drilling rigs; water carting equipment or other mechanised equipment. | 13-Feb-2020 | |
5 | 1 | The Licensee or transferee, as the case may be, shall within thirty (30) days of receiving written notification of:-- the grant of the Licence; or
- registration of a transfer introducing a new Licensee;
advise, by registered post, the holder of any underlying pastoral or grazing lease details of the grant or transfer. | 13-Feb-2020 | |
Type | Number | Details |
Objection | 524242 | Lodged:09:40:14 22 February 2018Objectors:NORTHERN AUSTRALIA PASTORAL PROPERTIES PTY LTDObjection Type:Tenement ApplicationRECORDED:09:40:14 22 February 2018Minute of Programming Directions lodged to finalise objectionWITHDRAWN:10:02:09 27 July 2018 |
Extension of Time | 528059 | Lodged:14:50 16 April 2018Type:Service on PastoralistRECORDED:14:50 16 April 2018Service on Pastoralist & Security until COB 11 May 2018APPROVED:08:40:18 30 April 2018 |
Forfeiture | 705385 | Initiated:14/06/2024 for non-compliance with reporting requirements( Form 5 )RECORDED:08:30 14 June 2024FINALISED:Order by Minister on 19 September 2024 that E 04/2524 be Penalty ImposedNotice Issued:Regulation 50 Notice sent 14/06/2024 for non-compliance with expenditure requirements pursuant to Reg 32/Sec 82(1)- late lodgement of Form 5.Compliance Date:19/07/2024 |
Fine | 715181 | Fine in respect to:Forfeiture Process 705385Fine reason:Non-compliance with expenditure obligationsPenalty amount:$440.00Notification date:25/09/2024Due date:30/10/2024Pursuant to:Section 96A(5)RECORDED:25 September 2024PAYMENT RECEIVED:11 October 2024FINALISED:14 October 2024Receipt Number:10683562Amount:$440.00Remaining balance:$0.00 |
Surrender - Outright | 725306 | Lodged:08:30 10 February 2025REJECTED:08:30 10 February 2025 |
Surrender - Outright | 726944 | Lodged:14:58:28 26 February 2025REJECTED:14:58:28 26 February 2025 |
Expiry - Full | 727535 | EFFECTIVE:Midnight 12 February 2025 |