# | Ver | Text | Start | End |
1 | 1 | All disturbances to the surface of the land made as a result of exploration, including costeans, drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, DMIRS. Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, DMIRS. | 09-Nov-2018 | |
2 | 1 | All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program. | 09-Nov-2018 | |
3 | 1 | Unless the written approval of the Environmental Officer, DMIRS is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations. | 09-Nov-2018 | |
4 | 1 | The Licensee notifying the holder of any underlying pastoral or grazing lease by telephone or in person, or by registered post if contact cannot be made, prior to undertaking airborne geophysical surveys or any ground disturbing activities utilising equipment such as scrapers, graders, bulldozers, backhoes, drilling rigs; water carting equipment or other mechanised equipment. | 09-Nov-2018 | |
5 | 1 | The Licensee or transferee, as the case may be, shall within thirty (30) days of receiving written notification of:-- the grant of the Licence; or
- registration of a transfer introducing a new Licensee;
advise, by registered post, the holder of any underlying pastoral or grazing lease details of the grant or transfer. | 09-Nov-2018 | |
Cond # | Ver | Text | Start | End |
1 | 1 | All disturbances to the surface of the land made as a result of exploration, including costeans, drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, DMIRS. Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, DMIRS. | 09-Nov-2018 | |
2 | 1 | All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program. | 09-Nov-2018 | |
3 | 1 | Unless the written approval of the Environmental Officer, DMIRS is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations. | 09-Nov-2018 | |
4 | 1 | The Licensee notifying the holder of any underlying pastoral or grazing lease by telephone or in person, or by registered post if contact cannot be made, prior to undertaking airborne geophysical surveys or any ground disturbing activities utilising equipment such as scrapers, graders, bulldozers, backhoes, drilling rigs; water carting equipment or other mechanised equipment. | 09-Nov-2018 | |
5 | 1 | The Licensee or transferee, as the case may be, shall within thirty (30) days of receiving written notification of:-- the grant of the Licence; or
- registration of a transfer introducing a new Licensee;
advise, by registered post, the holder of any underlying pastoral or grazing lease details of the grant or transfer. | 09-Nov-2018 | |
Type | Number | Details |
Forfeiture | 572191 | Initiated:14/02/2020 for non-compliance with reporting requirements( Form 5 )RECORDED:09:31 13 February 2020Notice Issued:Regulation 50 Notice sent 14/02/2020 for non-compliance with expenditure requirements pursuant to Reg 22/Sec 63A- non lodgement of Form 5.Compliance Date:20/03/2020FINALISED:Order by Minister on 19 October 2020 that E 04/2505 be Penalty Imposed |
Fine | 588475 | Fine in respect to:Forfeiture Process 572191Fine reason:Non-compliance with expenditure obligationsPenalty amount:$720.00Notification date:19/10/2020Due date:23/11/2020Pursuant to:Section 96A(5)RECORDED:19 October 2020PAYMENT RECEIVED:18 November 2020FINALISED:18 November 2020Receipt Number:10172709Amount:$720.00Remaining balance:$0.00 |
Forfeiture | 596252 | Initiated:22/02/2021 for non-compliance with reporting requirements( Form 5 )RECORDED:11:54:21 19 February 2021Notice Issued:Regulation 50 Notice sent 22/02/2021 for non-compliance with expenditure requirements pursuant to Reg 22/Sec 63A- late lodgement of Form 5.Compliance Date:29/03/2021FINALISED:Order by Minister on 07 April 2021 that E 04/2505 be Penalty Imposed |
Fine | 619651 | Fine in respect to:Forfeiture Process 596252Fine reason:Non-compliance with expenditure obligationsPenalty amount:$240.00Notification date:08/04/2021Due date:13/05/2021Pursuant to:Section 96A(5)RECORDED:07 April 2021PAYMENT RECEIVED:19 April 2021FINALISED:19 April 2021Receipt Number:06-179692Amount:$240.00Remaining balance:$0.00 |
Extension of Time | 666461 | Lodged:11:10 06 January 2023Type:Form 5RECORDED:11:10 06 January 2023APPROVED:08:53:11 17 January 2023Time to lodge extended to COB 7th March 2023 |
Extension of Time | 670419 | Lodged:15:59 07 March 2023Type:Form 5RECORDED:15:59 07 March 2023APPROVED:11:53:18 08 March 2023Time to lodge extended to COB 24th March 2023 |
Expiry - Full | 692500 | EFFECTIVE:Midnight 08 November 2023 |