Extracted from MTO on 27-Jun-2025 00:13,
last changed 27-Jun-2025.
# | Ver | Text | Start | End |
1 | 1 | All disturbances to the surface of the land made as a result of exploration, including costeans, drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, DMIRS. Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, DMIRS. | 17-Jul-2018 | |
2 | 1 | All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program. | 17-Jul-2018 | |
3 | 1 | Unless the written approval of the Environmental Officer, DMIRS is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations. | 17-Jul-2018 | |
4 | 1 | The Licensee notifying the holder of any underlying pastoral or grazing lease by telephone or in person, or by registered post if contact cannot be made, prior to undertaking airborne geophysical surveys or any ground disturbing activities utilising equipment such as scrapers, graders, bulldozers, backhoes, drilling rigs; water carting equipment or other mechanised equipment. | 17-Jul-2018 | |
5 | 1 | The Licensee or transferee, as the case may be, shall within thirty (30) days of receiving written notification of:-- the grant of the Licence; or
- registration of a transfer introducing a new Licensee;
advise, by registered post, the holder of any underlying pastoral or grazing lease details of the grant or transfer. | 17-Jul-2018 | |
6 | 1 | The rights of ingress to and egress from Miscellaneous Licences 04/57 and 04/60 being at all times preserved to the licensees and no interference with the purpose or installations connected to the licences. | 17-Jul-2018 | |
7 | 1 | No interference with Geodetic Survey Stations R 315, Noonkanbah 48 and 49 and mining within 15 metres thereof being confined to below a depth of 15 metres from the natural surface. | 17-Jul-2018 | |
8 | 1 | No excavation, excepting shafts, approaching closer to the Great Northern Highway, Highway verge or the road reserve than a distance equal to twice the depth of the excavation and mining on the Great Northern Highway or Highway verge being confined to below a depth of 30 metres from the natural surface, and on any other road or road verge, to below a depth of 15 metres from the natural surface. | 17-Jul-2018 | |
9 | 1 | Mining within a radius of 150 metres of any Australian Telecommunications Commission microwave repeater station being confined to below a depth of 60 metres from the natural surface. | 17-Jul-2018 | |
10 | 1 | No interference with the Australian Telecommunications Commission microwave repeater station ray-line. | 17-Jul-2018 | |
11 | 1 | The prior written consent of the Minister responsible for the Mining Act 1978 being obtained before commencing any exploration activities on Repeater Station Site Reserve 41508 and Gravel Reserve 42848. | 17-Jul-2018 | |
Cond # | Ver | Text | Start | End |
1 | 1 | All disturbances to the surface of the land made as a result of exploration, including costeans, drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, DMIRS. Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, DMIRS. | 17-Jul-2018 | |
2 | 1 | All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program. | 17-Jul-2018 | |
3 | 1 | Unless the written approval of the Environmental Officer, DMIRS is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations. | 17-Jul-2018 | |
4 | 1 | The Licensee notifying the holder of any underlying pastoral or grazing lease by telephone or in person, or by registered post if contact cannot be made, prior to undertaking airborne geophysical surveys or any ground disturbing activities utilising equipment such as scrapers, graders, bulldozers, backhoes, drilling rigs; water carting equipment or other mechanised equipment. | 17-Jul-2018 | |
5 | 1 | The Licensee or transferee, as the case may be, shall within thirty (30) days of receiving written notification of:-- the grant of the Licence; or
- registration of a transfer introducing a new Licensee;
advise, by registered post, the holder of any underlying pastoral or grazing lease details of the grant or transfer. | 17-Jul-2018 | |
6 | 1 | The rights of ingress to and egress from Miscellaneous Licences 04/57 and 04/60 being at all times preserved to the licensees and no interference with the purpose or installations connected to the licences. | 17-Jul-2018 | |
7 | 1 | No interference with Geodetic Survey Stations R 315, Noonkanbah 48 and 49 and mining within 15 metres thereof being confined to below a depth of 15 metres from the natural surface. | 17-Jul-2018 | |
8 | 1 | No excavation, excepting shafts, approaching closer to the Great Northern Highway, Highway verge or the road reserve than a distance equal to twice the depth of the excavation and mining on the Great Northern Highway or Highway verge being confined to below a depth of 30 metres from the natural surface, and on any other road or road verge, to below a depth of 15 metres from the natural surface. | 17-Jul-2018 | |
9 | 1 | Mining within a radius of 150 metres of any Australian Telecommunications Commission microwave repeater station being confined to below a depth of 60 metres from the natural surface. | 17-Jul-2018 | |
10 | 1 | No interference with the Australian Telecommunications Commission microwave repeater station ray-line. | 17-Jul-2018 | |
11 | 1 | The prior written consent of the Minister responsible for the Mining Act 1978 being obtained before commencing any exploration activities on Repeater Station Site Reserve 41508 and Gravel Reserve 42848. | 17-Jul-2018 | |
Type | Number | Details |
Objection | 520458 | Lodged:12:13 19 December 2017Objectors:LENNARD SHELF PTY LTDObjection Type:Tenement ApplicationRECORDED:12:13 19 December 2017WITHDRAWN:10:00 23 February 2018Wardens Decision Made on:09:51:55 23 February 2018Wardens Decision Status:Finalised |
Objection | 520646 | Lodged:13:42:51 20 December 2017Objectors:KIMBERLEY GRANITE QUARRIES PTY LTDObjection Type:Tenement ApplicationRECORDED:13:42:51 20 December 2017WITHDRAWN:10:00 23 February 2018 |
Objection | 521038 | Lodged:13:44 02 January 2018Objectors:GOGO STATION PTY LTDObjection Type:Tenement ApplicationRECORDED:13:44 02 January 2018WITHDRAWN:10:57:57 22 June 2018 |
Surrender - Outright | 680721 | Lodged:11:39:42 11 July 2023REGISTERED:11:39:42 11 July 2023 |