Extracted from MTO on 08-Jul-2025 01:17,
last changed 08-Jul-2025.
# | Ver | Text | Start | End |
1 | 1 | All disturbances to the surface of the land made as a result of exploration, including costeans, drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Mines, Industry Regulation and Safety. Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, Department of Mines, Industry Regulation and Safety. | 13-Feb-2019 | |
2 | 1 | All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program. | 13-Feb-2019 | |
3 | 1 | Unless the written approval of the Environmental Officer, Department of Mines, Industry Regulation and Safety is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations. | 13-Feb-2019 | |
4 | 1 | The Licensee notifying the holder of any underlying pastoral or grazing lease by telephone or in person, or by registered post if contact cannot be made, prior to undertaking airborne geophysical surveys or any ground disturbing activities utilising equipment such as scrapers, graders, bulldozers, backhoes, drilling rigs; water carting equipment or other mechanised equipment. | 13-Feb-2019 | |
5 | 1 | The Licensee or transferee, as the case may be, shall within thirty (30) days of receiving written notification of:-- the grant of the Licence; or
- registration of a transfer introducing a new Licensee;
advise, by registered post, the holder of any underlying pastoral or grazing lease details of the grant or transfer. | 13-Feb-2019 | |
6 | 1 | No interference with Geodetic Survey Station B1 and J6 and mining within 15 metres thereof being confined to below a depth of 15 metres from the natural surface. | 13-Feb-2019 | |
Cond # | Ver | Text | Start | End |
1 | 1 | All disturbances to the surface of the land made as a result of exploration, including costeans, drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Mines, Industry Regulation and Safety. Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, Department of Mines, Industry Regulation and Safety. | 13-Feb-2019 | |
2 | 1 | All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program. | 13-Feb-2019 | |
3 | 1 | Unless the written approval of the Environmental Officer, Department of Mines, Industry Regulation and Safety is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations. | 13-Feb-2019 | |
4 | 1 | The Licensee notifying the holder of any underlying pastoral or grazing lease by telephone or in person, or by registered post if contact cannot be made, prior to undertaking airborne geophysical surveys or any ground disturbing activities utilising equipment such as scrapers, graders, bulldozers, backhoes, drilling rigs; water carting equipment or other mechanised equipment. | 13-Feb-2019 | |
5 | 1 | The Licensee or transferee, as the case may be, shall within thirty (30) days of receiving written notification of:-- the grant of the Licence; or
- registration of a transfer introducing a new Licensee;
advise, by registered post, the holder of any underlying pastoral or grazing lease details of the grant or transfer. | 13-Feb-2019 | |
6 | 1 | No interference with Geodetic Survey Station B1 and J6 and mining within 15 metres thereof being confined to below a depth of 15 metres from the natural surface. | 13-Feb-2019 | |
Type | Number | Details |
Application to Amend | 568249 | Lodged:09:53:46 09 December 2019Amending:Address (Including DTC Details)From:Principal Residence : ASKINS, Paul Winston, 17 BROWNE ST, SUBIACO, WA, 6008, xxxxxxx@westnet.com.au, xxxxxxx768 and DTC :ASKINS, Paul Winston, PAUL ASKINS, 17 BROWNE ST, SUBIACO, WA, 6008, xxxxxxx@westnet.com.au, xxxxxxx768To:Principal Residence : ASKINS, Paul Winston, PO BOX 592, MAYLANDS, WA, 6931, xxxx@mmts.net.au, xxxxxxx997 and DTC :ASKINS, Paul Winston, C/- MCMAHON MINING TITLE SERVICES PTY LTD, PO BOX 592, MAYLANDS, WA, 6931, xxxx@mmts.net.au, xxxxxxx997RECORDED:09:53:46 09 December 2019 |
Application to Amend | 584583 | Lodged:08:30 20 August 2020REJECTED:08:30 20 August 2020 |
Expiry - Full | 697534 | EFFECTIVE:Midnight 12 February 2024 |