Extracted from MTO on 12-Jul-2025 01:14,
last changed 26-Jun-2025.
# | Ver | Text | Start | End |
1 | 1 | All disturbances to the surface of the land made as a result of exploration, including costeans, drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, DMIRS. Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, DMIRS. | 30-May-2018 | |
2 | 1 | All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program. | 30-May-2018 | |
3 | 1 | Unless the written approval of the Environmental Officer, DMIRS is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations. | 30-May-2018 | |
4 | 1 | The Licensee notifying the holder of any underlying pastoral or grazing lease by telephone or in person, or by registered post if contact cannot be made, prior to undertaking airborne geophysical surveys or any ground disturbing activities utilising equipment such as scrapers, graders, bulldozers, backhoes, drilling rigs; water carting equipment or other mechanised equipment. | 30-May-2018 | |
5 | 1 | The Licensee or transferee, as the case may be, shall within thirty (30) days of receiving written notification of:-- the grant of the Licence; or
- registration of a transfer introducing a new Licensee;
advise, by registered post, the holder of any underlying pastoral or grazing lease details of the grant or transfer. | 30-May-2018 | |
6 | 1 | No interference with Geodetic Survey Station BROOME 39 and mining within 15 metres thereof being confined to below a depth of 15 metres from the natural surface. | 30-May-2018 | |
7 | 1 | No mining within 25 metres of either side of the Gas/Petroleum pipeline contained within Petroleum Pipeline Licence No 109 as shown in TENGRAPH. | 30-May-2018 | |
8 | 1 | No surface excavation approaching closer to the boundary of the Safety Zone established by condition 7 hereof than a distance equal to three times the depth of the excavation without the prior written approval of the Director, Dangerous Goods and Critical Risks, Safety Regulation, DMIRS. | 30-May-2018 | |
9 | 1 | No interference with the drainage pattern, and no parking, storage or movement of equipment or vehicles used in the course of mining within the Safety Zone established by Condition 7 hereof without the prior approval of the operators of the Gas/Petroleum pipeline. | 30-May-2018 | |
10 | 1 | The Licensee shall not excavate, drill, install, erect, deposit or permit to be excavated, drilled, installed, erected or deposited within the Safety Zone established in Condition 7 hereof, any pit, well, pavement, foundation, building, or other structure or installation, or material of any nature whatsoever without the prior written consent of the Director, Dangerous Goods and Critical Risks, Safety Regulation, DMIRS. | 30-May-2018 | |
11 | 1 | No explosives being used or stored within one hundred and fifty (150) metres of the Gas/Petroleum pipeline without the prior written consent of the Director, Dangerous Goods and Critical Risks, Safety Regulation, DMIRS. | 30-May-2018 | |
12 | 1 | Mining on the Safety Zone established in Condition 7 hereof being confined to below a depth of 50 metres from the natural surface unless otherwise approved by the Director, Dangerous Goods and Critical Risks, Safety Regulation, DMIRS. | 30-May-2018 | |
13 | 1 | The rights of ingress to and egress from the pipeline easement established in Condition 7 hereof being at all times preserved for employees, contractors and agents of the operators of the Gas/Petroleum pipeline. | 30-May-2018 | |
14 | 1 | Such further conditions as may from time to time be imposed by the Minister responsible for the Mining Act 1978 for the purpose of protecting the Gas/Petroleum pipeline. | 30-May-2018 | |
| 1 | In respect to the area outlined in "red" (FNA 7672) as shown in TENGRAPH the following condition shall apply: | 30-May-2018 | |
15 | 1 | No prospecting, exploration or mining activities being conducted that will interfere with or endanger the construction or operation of the Gas/Petroleum pipeline and associated facilities and rights of ingress to and egress from the area being at all times preserved to the holders, their employees, agents and contractors. | 30-May-2018 | |
Cond # | Ver | Text | Start | End |
1 | 1 | All disturbances to the surface of the land made as a result of exploration, including costeans, drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, DMIRS. Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, DMIRS. | 30-May-2018 | |
2 | 1 | All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program. | 30-May-2018 | |
3 | 1 | Unless the written approval of the Environmental Officer, DMIRS is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations. | 30-May-2018 | |
4 | 1 | The Licensee notifying the holder of any underlying pastoral or grazing lease by telephone or in person, or by registered post if contact cannot be made, prior to undertaking airborne geophysical surveys or any ground disturbing activities utilising equipment such as scrapers, graders, bulldozers, backhoes, drilling rigs; water carting equipment or other mechanised equipment. | 30-May-2018 | |
5 | 1 | The Licensee or transferee, as the case may be, shall within thirty (30) days of receiving written notification of:-- the grant of the Licence; or
- registration of a transfer introducing a new Licensee;
advise, by registered post, the holder of any underlying pastoral or grazing lease details of the grant or transfer. | 30-May-2018 | |
6 | 1 | No interference with Geodetic Survey Station BROOME 39 and mining within 15 metres thereof being confined to below a depth of 15 metres from the natural surface. | 30-May-2018 | |
7 | 1 | No mining within 25 metres of either side of the Gas/Petroleum pipeline contained within Petroleum Pipeline Licence No 109 as shown in TENGRAPH. | 30-May-2018 | |
8 | 1 | No surface excavation approaching closer to the boundary of the Safety Zone established by condition 7 hereof than a distance equal to three times the depth of the excavation without the prior written approval of the Director, Dangerous Goods and Critical Risks, Safety Regulation, DMIRS. | 30-May-2018 | |
9 | 1 | No interference with the drainage pattern, and no parking, storage or movement of equipment or vehicles used in the course of mining within the Safety Zone established by Condition 7 hereof without the prior approval of the operators of the Gas/Petroleum pipeline. | 30-May-2018 | |
10 | 1 | The Licensee shall not excavate, drill, install, erect, deposit or permit to be excavated, drilled, installed, erected or deposited within the Safety Zone established in Condition 7 hereof, any pit, well, pavement, foundation, building, or other structure or installation, or material of any nature whatsoever without the prior written consent of the Director, Dangerous Goods and Critical Risks, Safety Regulation, DMIRS. | 30-May-2018 | |
11 | 1 | No explosives being used or stored within one hundred and fifty (150) metres of the Gas/Petroleum pipeline without the prior written consent of the Director, Dangerous Goods and Critical Risks, Safety Regulation, DMIRS. | 30-May-2018 | |
12 | 1 | Mining on the Safety Zone established in Condition 7 hereof being confined to below a depth of 50 metres from the natural surface unless otherwise approved by the Director, Dangerous Goods and Critical Risks, Safety Regulation, DMIRS. | 30-May-2018 | |
13 | 1 | The rights of ingress to and egress from the pipeline easement established in Condition 7 hereof being at all times preserved for employees, contractors and agents of the operators of the Gas/Petroleum pipeline. | 30-May-2018 | |
14 | 1 | Such further conditions as may from time to time be imposed by the Minister responsible for the Mining Act 1978 for the purpose of protecting the Gas/Petroleum pipeline. | 30-May-2018 | |
| 1 | In respect to the area outlined in "red" (FNA 7672) as shown in TENGRAPH the following condition shall apply: | 30-May-2018 | |
15 | 1 | No prospecting, exploration or mining activities being conducted that will interfere with or endanger the construction or operation of the Gas/Petroleum pipeline and associated facilities and rights of ingress to and egress from the area being at all times preserved to the holders, their employees, agents and contractors. | 30-May-2018 | |
Type | Number | Details |
Partial Surrender - Voluntary | 564467 | Lodged:11:51:46 10 October 2019Surrendered Blocks:BROOME 1621 wSurrendered Total:1 BL.REGISTERED:11:51:46 10 October 2019 |
Partial Surrender - Voluntary | 576404 | Lodged:14:00:31 20 April 2020Surrendered Blocks:BROOME 1618 b, g, m, r, wSurrendered Total:5 BL.REGISTERED:14:00:31 20 April 2020 |
Extension of Time | 631203 | Lodged:14:25:55 25 August 2021Type:Stat DecRECORDED:14:25:55 25 August 2021APPROVED:11:55:41 26 August 2021Time to lodge extended to 8 September 2021 |
Forfeiture | 634607 | Initiated:18/10/2021 for non-compliance with expenditure conditionsRECORDED:14:55:39 18 October 2021Notice Issued:Regulation 50 Notice sent 18/10/2021 for non-compliance with expenditure conditions pursuant to Reg 15.Compliance Date:22/11/2021FINALISED:Order by Minister on 13 January 2022 that E 04/2494 be Penalty Imposed |
Fine | 639284 | Fine in respect to:Forfeiture Process 634607Fine reason:Non-compliance with expenditure obligationsPenalty amount:$5,033.00Notification date:17/01/2022Due date:21/02/2022Pursuant to:Section 96A(5)RECORDED:17 January 2022PAYMENT RECEIVED:14 February 2022FINALISED:14 February 2022Receipt Number:10242720Amount:$5,033.00Remaining balance:$0.00 |
Extension / Renewal of Term | 677008 | Lodged:12:57:38 26 May 2023Applied For Period:5 YearsRECORDED:12:57:38 26 May 2023GRANTED:05 September 2023Granted Period:5 YearsTerm Extended To:29/05/2028 |
Partial Surrender - Compulsory | 706497 | Lodged:14:41:45 12 June 2024Section:Section 65 (3)Surrendered Blocks:BROOME 1618 c, d, h, j, n, o, s, t, x, y
BROOME 1620 o, p, r, s, t, u, w, x, y, z
BROOME 1621 v
BROOME 1690 d, e
BROOME 1691 aSurrendered Total:24 BL.REJECTED:14:41:45 12 June 2024 |
Partial Surrender - Compulsory | 709727 | Lodged:15:37:01 17 July 2024Section:Section 65 (3)Surrendered Blocks:BROOME 1618 c, d, h, j, n, o, s, t, x, y, z
BROOME 1620 o, p, t, u, x, y, z
BROOME 1621 v
BROOME 1690 d, e
BROOME 1691 aSurrendered Total:22 BL.REGISTERED:15:37:01 17 July 2024Surrendered area to be released 08:30:00 16/08/2024 under Section 65 (3)Surrendered area released 08:30:00 16/08/2024 under Section 65 (3) |
Partial Surrender - Voluntary | 725113 | Lodged:11:25:34 06 February 2025Surrendered Blocks:BROOME 1618 u
BROOME 1619 k, p, u, z
BROOME 1620 f, g, l, m, n, q, r, s, v, wSurrendered Total:15 BL.REGISTERED:11:25:34 06 February 2025 |