Tenement: E04-2494

View on Landtracker Maps (logon required)

Extracted from MTO on 12-Jul-2025 01:14, last changed 26-Jun-2025.

Tenement Summary

Identifier:E 04/2494Type:Exploration Licence
Status:LiveDistrict:WEST KIMBERLEY M.F.
Lodged:ONLINEArea:27 BL
Purposes:Term:5 Years (Extended)
Markout:Received:19-Jun-2017 08:30
Commence:30-May-2018 Expiry:29-May-2028

Holders

Company NameSharesTotal Shares
THUNDERBIRD OPERATIONS PTY LTD100100

Applicants on Receival

Company NameSharesTotal Shares
THUNDERBIRD OPERATIONS PTY LTD100100

Shires

Shire NameShire NumberStartArea
BROOME SHIRE98019-Jun-2017 27.00000 BL

Conditions

#VerTextStartEnd
11All disturbances to the surface of the land made as a result of exploration, including costeans, drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, DMIRS. Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, DMIRS.30-May-2018
21All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program.30-May-2018
31Unless the written approval of the Environmental Officer, DMIRS is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations.30-May-2018
41The Licensee notifying the holder of any underlying pastoral or grazing lease by telephone or in person, or by registered post if contact cannot be made, prior to undertaking airborne geophysical surveys or any ground disturbing activities utilising equipment such as scrapers, graders, bulldozers, backhoes, drilling rigs; water carting equipment or other mechanised equipment.30-May-2018
51The Licensee or transferee, as the case may be, shall within thirty (30) days of receiving written notification of:-
  • the grant of the Licence; or
  • registration of a transfer introducing a new Licensee;
advise, by registered post, the holder of any underlying pastoral or grazing lease details of the grant or transfer.
30-May-2018
61No interference with Geodetic Survey Station BROOME 39 and mining within 15 metres thereof being confined to below a depth of 15 metres from the natural surface.30-May-2018
71No mining within 25 metres of either side of the Gas/Petroleum pipeline contained within Petroleum Pipeline Licence No 109 as shown in TENGRAPH.30-May-2018
81No surface excavation approaching closer to the boundary of the Safety Zone established by condition 7 hereof than a distance equal to three times the depth of the excavation without the prior written approval of the Director, Dangerous Goods and Critical Risks, Safety Regulation, DMIRS.30-May-2018
91No interference with the drainage pattern, and no parking, storage or movement of equipment or vehicles used in the course of mining within the Safety Zone established by Condition 7 hereof without the prior approval of the operators of the Gas/Petroleum pipeline.30-May-2018
101The Licensee shall not excavate, drill, install, erect, deposit or permit to be excavated, drilled, installed, erected or deposited within the Safety Zone established in Condition 7 hereof, any pit, well, pavement, foundation, building, or other structure or installation, or material of any nature whatsoever without the prior written consent of the Director, Dangerous Goods and Critical Risks, Safety Regulation, DMIRS.30-May-2018
111No explosives being used or stored within one hundred and fifty (150) metres of the Gas/Petroleum pipeline without the prior written consent of the Director, Dangerous Goods and Critical Risks, Safety Regulation, DMIRS.30-May-2018
121Mining on the Safety Zone established in Condition 7 hereof being confined to below a depth of 50 metres from the natural surface unless otherwise approved by the Director, Dangerous Goods and Critical Risks, Safety Regulation, DMIRS.30-May-2018
131The rights of ingress to and egress from the pipeline easement established in Condition 7 hereof being at all times preserved for employees, contractors and agents of the operators of the Gas/Petroleum pipeline.30-May-2018
141Such further conditions as may from time to time be imposed by the Minister responsible for the Mining Act 1978 for the purpose of protecting the Gas/Petroleum pipeline.30-May-2018
1In respect to the area outlined in "red" (FNA 7672) as shown in TENGRAPH the following condition shall apply:30-May-2018
151No prospecting, exploration or mining activities being conducted that will interfere with or endanger the construction or operation of the Gas/Petroleum pipeline and associated facilities and rights of ingress to and egress from the area being at all times preserved to the holders, their employees, agents and contractors.30-May-2018

Endorsements

Cond #VerTextStartEnd
11All disturbances to the surface of the land made as a result of exploration, including costeans, drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, DMIRS. Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, DMIRS.30-May-2018
21All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program.30-May-2018
31Unless the written approval of the Environmental Officer, DMIRS is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations.30-May-2018
41The Licensee notifying the holder of any underlying pastoral or grazing lease by telephone or in person, or by registered post if contact cannot be made, prior to undertaking airborne geophysical surveys or any ground disturbing activities utilising equipment such as scrapers, graders, bulldozers, backhoes, drilling rigs; water carting equipment or other mechanised equipment.30-May-2018
51The Licensee or transferee, as the case may be, shall within thirty (30) days of receiving written notification of:-
  • the grant of the Licence; or
  • registration of a transfer introducing a new Licensee;
advise, by registered post, the holder of any underlying pastoral or grazing lease details of the grant or transfer.
30-May-2018
61No interference with Geodetic Survey Station BROOME 39 and mining within 15 metres thereof being confined to below a depth of 15 metres from the natural surface.30-May-2018
71No mining within 25 metres of either side of the Gas/Petroleum pipeline contained within Petroleum Pipeline Licence No 109 as shown in TENGRAPH.30-May-2018
81No surface excavation approaching closer to the boundary of the Safety Zone established by condition 7 hereof than a distance equal to three times the depth of the excavation without the prior written approval of the Director, Dangerous Goods and Critical Risks, Safety Regulation, DMIRS.30-May-2018
91No interference with the drainage pattern, and no parking, storage or movement of equipment or vehicles used in the course of mining within the Safety Zone established by Condition 7 hereof without the prior approval of the operators of the Gas/Petroleum pipeline.30-May-2018
101The Licensee shall not excavate, drill, install, erect, deposit or permit to be excavated, drilled, installed, erected or deposited within the Safety Zone established in Condition 7 hereof, any pit, well, pavement, foundation, building, or other structure or installation, or material of any nature whatsoever without the prior written consent of the Director, Dangerous Goods and Critical Risks, Safety Regulation, DMIRS.30-May-2018
111No explosives being used or stored within one hundred and fifty (150) metres of the Gas/Petroleum pipeline without the prior written consent of the Director, Dangerous Goods and Critical Risks, Safety Regulation, DMIRS.30-May-2018
121Mining on the Safety Zone established in Condition 7 hereof being confined to below a depth of 50 metres from the natural surface unless otherwise approved by the Director, Dangerous Goods and Critical Risks, Safety Regulation, DMIRS.30-May-2018
131The rights of ingress to and egress from the pipeline easement established in Condition 7 hereof being at all times preserved for employees, contractors and agents of the operators of the Gas/Petroleum pipeline.30-May-2018
141Such further conditions as may from time to time be imposed by the Minister responsible for the Mining Act 1978 for the purpose of protecting the Gas/Petroleum pipeline.30-May-2018
1In respect to the area outlined in "red" (FNA 7672) as shown in TENGRAPH the following condition shall apply:30-May-2018
151No prospecting, exploration or mining activities being conducted that will interfere with or endanger the construction or operation of the Gas/Petroleum pipeline and associated facilities and rights of ingress to and egress from the area being at all times preserved to the holders, their employees, agents and contractors.30-May-2018

Dealings

TypeNumberDetails
Partial Surrender - Voluntary564467Lodged:11:51:46 10 October 2019Surrendered Blocks:BROOME 1621 wSurrendered Total:1 BL.REGISTERED:11:51:46 10 October 2019
Partial Surrender - Voluntary576404Lodged:14:00:31 20 April 2020Surrendered Blocks:BROOME 1618 b, g, m, r, wSurrendered Total:5 BL.REGISTERED:14:00:31 20 April 2020
Extension of Time631203Lodged:14:25:55 25 August 2021Type:Stat DecRECORDED:14:25:55 25 August 2021APPROVED:11:55:41 26 August 2021Time to lodge extended to 8 September 2021
Forfeiture634607Initiated:18/10/2021 for non-compliance with expenditure conditionsRECORDED:14:55:39 18 October 2021Notice Issued:Regulation 50 Notice sent 18/10/2021 for non-compliance with expenditure conditions pursuant to Reg 15.Compliance Date:22/11/2021FINALISED:Order by Minister on 13 January 2022 that E 04/2494 be Penalty Imposed
Fine639284Fine in respect to:Forfeiture Process 634607Fine reason:Non-compliance with expenditure obligationsPenalty amount:$5,033.00Notification date:17/01/2022Due date:21/02/2022Pursuant to:Section 96A(5)RECORDED:17 January 2022PAYMENT RECEIVED:14 February 2022FINALISED:14 February 2022Receipt Number:10242720Amount:$5,033.00Remaining balance:$0.00
Extension / Renewal of Term677008Lodged:12:57:38 26 May 2023Applied For Period:5 YearsRECORDED:12:57:38 26 May 2023GRANTED:05 September 2023Granted Period:5 YearsTerm Extended To:29/05/2028
Partial Surrender - Compulsory706497Lodged:14:41:45 12 June 2024Section:Section 65 (3)Surrendered Blocks:BROOME 1618 c, d, h, j, n, o, s, t, x, y BROOME 1620 o, p, r, s, t, u, w, x, y, z BROOME 1621 v BROOME 1690 d, e BROOME 1691 aSurrendered Total:24 BL.REJECTED:14:41:45 12 June 2024
Partial Surrender - Compulsory709727Lodged:15:37:01 17 July 2024Section:Section 65 (3)Surrendered Blocks:BROOME 1618 c, d, h, j, n, o, s, t, x, y, z BROOME 1620 o, p, t, u, x, y, z BROOME 1621 v BROOME 1690 d, e BROOME 1691 aSurrendered Total:22 BL.REGISTERED:15:37:01 17 July 2024Surrendered area to be released 08:30:00 16/08/2024 under Section 65 (3)Surrendered area released 08:30:00 16/08/2024 under Section 65 (3)
Partial Surrender - Voluntary725113Lodged:11:25:34 06 February 2025Surrendered Blocks:BROOME 1618 u BROOME 1619 k, p, u, z BROOME 1620 f, g, l, m, n, q, r, s, v, wSurrendered Total:15 BL.REGISTERED:11:25:34 06 February 2025

Payments

TypeYearReceipt DateReceipt No.MR LodgedAmountRental AreaEffective DateAmt DueDiscrepancy
Rental202630-May-2025 10833033$21,168.0027 BL06-Feb-2025 $21,168.00$0.00
Rental202516-May-2024 10571723$25,280.0064 BL20-Apr-2020 $25,280.00$0.00
Rental202415-May-2023 10359432$24,064.0064 BL20-Apr-2020 $24,064.00$0.00
Rental202313-May-2022 10262474$16,768.0064 BL20-Apr-2020 $16,768.00$0.00
Rental202231-May-2021 10199028$15,232.0064 BL20-Apr-2020 $15,232.00$0.00
Rental202123-Jun-2020 (REFUND) FIL-21539$690.0064 BL20-Apr-2020 $8,832.00$0.00
Rental202129-May-2020 10147034$9,522.00
Rental202026-Jun-2019 10102461$9,520.0070 BL30-May-2018 $9,520.00$0.00
Rental201919-Jun-2017 74551389625$9,065.0070 BL30-May-2018 $9,065.00$0.00

Expenditure

YearForm 5 TypeMin ExpdExp Lodged DateTotal ExpdExemp NoExemp LodgedExemp AmtExemp StatusOutcome DateExploration ActivitiesMining ActivitiesAboriginal SurveyRentAdministrationProspectingStrike Through
2026$81,000.00false
2025$83,834.00false
2024$128,000.0014-Jun-2024 $129,327.00$90,304.00$0.00$0.00$27,266.00$11,757.00$0.00false
2023$96,000.0025-Jul-2023 $141,812.04$107,707.00$0.00$1,243.00$19,970.00$12,892.04$0.00false
2022$96,000.0028-Jul-2022 $102,211.00$60,773.00$0.00$6,467.00$17,936.00$17,035.00$0.00false
2021$64,000.0028-Jul-2021 $13,670.0062918928-Jul-2021 $64,000.00Refused18-Oct-2021 $0.00$0.00$0.00$11,392.00$2,278.00$0.00false
2020$69,000.0023-Jul-2020 $44,330.0058264823-Jul-2020 $69,000.00Granted03-Sep-2020 $21,196.00$0.00$0.00$15,746.00$7,388.00$0.00false
2019$70,000.0026-Jul-2019 $194,529.77$125,711.00$0.00$24,390.01$12,007.13$32,421.63$0.00false

Native Title Referrals

Referred to Native Title DateReferral TypeCurrent StatusProcedureDetailsObjectionsWater CommentsDetermination AreasClaimsRepresentative Area Bodies
15-Aug-2017 Tenement ApplicationExpedited Procedure : Native Title Cleared - Expedited AppliesExpedited Procedure2017-09-012018-01-01CLEARED - Expedited Applies2018-05-3070 BL17530S122540E71km E'ly of BroomeWO2017/07912017-12-08WC1999/023Objection Withdrawn Agreement2018-05-29RUBIBI COMMUNITY(WCD2006/001)WC1999/023WAD6006/1998trueWCD2006/00186EXISTYes10KimberleyKimberley Land Council Aboriginal Corporation