# | Ver | Text | Start | End |
1 | 1 | All disturbances to the surface of the land made as a result of exploration, including costeans, drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Mines, Industry Regulation and Safety. Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, Department of Mines, Industry Regulation and Safety. | 11-Mar-2019 | |
2 | 1 | All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program. | 11-Mar-2019 | |
3 | 1 | Unless the written approval of the Environmental Officer, Department of Mines, Industry Regulation and Safety is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations. | 11-Mar-2019 | |
4 | 1 | The prior written consent of the Minister responsible for the Mining Act 1978 being obtained before commencing any exploration activities on Meda Location 15 and the foreshore, seabed and navigable waters. | 11-Mar-2019 | |
5 | 1 | In respect of the area covered by the licence the licensee, if so requested in writing by the Wanjina-Wunggurr (Native Title) Aboriginal Corporation RNTBC , the native title prescribed body corporate holding the determined native title of the Wanjina Wunggurr Wiingin Native Title determination No 1 recognised in the Federal Court application No. WAD6015/1999 , such request being sent by pre-paid post to reach the licensee's address, not more than ninety days after the grant of this licence,shall within thirty days of the request execute in favour of the Wanjina-Wunggurr (Native Title) Aboriginal Corporation RNTBC the Regional Standard Heritage Agreement ("RSHA") endorsed by peak industry groups (e.g. the South West/Ngaayatjarra/Pilbara/Yamatji/Goldfields Land and Sea Council RSHA) and offered by the Native Title Party or their representatives. | 11-Mar-2019 | |
Cond # | Ver | Text | Start | End |
1 | 1 | All disturbances to the surface of the land made as a result of exploration, including costeans, drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Mines, Industry Regulation and Safety. Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, Department of Mines, Industry Regulation and Safety. | 11-Mar-2019 | |
2 | 1 | All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program. | 11-Mar-2019 | |
3 | 1 | Unless the written approval of the Environmental Officer, Department of Mines, Industry Regulation and Safety is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations. | 11-Mar-2019 | |
4 | 1 | The prior written consent of the Minister responsible for the Mining Act 1978 being obtained before commencing any exploration activities on Meda Location 15 and the foreshore, seabed and navigable waters. | 11-Mar-2019 | |
5 | 1 | In respect of the area covered by the licence the licensee, if so requested in writing by the Wanjina-Wunggurr (Native Title) Aboriginal Corporation RNTBC , the native title prescribed body corporate holding the determined native title of the Wanjina Wunggurr Wiingin Native Title determination No 1 recognised in the Federal Court application No. WAD6015/1999 , such request being sent by pre-paid post to reach the licensee's address, not more than ninety days after the grant of this licence,shall within thirty days of the request execute in favour of the Wanjina-Wunggurr (Native Title) Aboriginal Corporation RNTBC the Regional Standard Heritage Agreement ("RSHA") endorsed by peak industry groups (e.g. the South West/Ngaayatjarra/Pilbara/Yamatji/Goldfields Land and Sea Council RSHA) and offered by the Native Title Party or their representatives. | 11-Mar-2019 | |
Type | Number | Details |
Extension of Time | 505934 | Lodged:12:00 08 May 2017Type:SecurityRECORDED:12:00 08 May 2017APPROVED:14:29 08 May 2017 |
Surrender - Outright | 570943 | Lodged:08:30 28 January 2020REGISTERED:08:30 28 January 2020 |