Extracted from MTO on 01-Jul-2025 00:24,
last changed 26-Jun-2025.
# | Ver | Text | Start | End |
1 | 1 | All disturbances to the surface of the land made as a result of exploration, including costeans, drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Mines, Industry Regulation and Safety. Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, Department of Mines, Industry Regulation and Safety. | 11-Dec-2018 | |
2 | 1 | All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program. | 11-Dec-2018 | |
3 | 1 | Unless the written approval of the Environmental Officer, Department of Mines, Industry Regulation and Safety is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations. | 11-Dec-2018 | |
4 | 1 | The Licensee notifying the holder of any underlying pastoral or grazing lease by telephone or in person, or by registered post if contact cannot be made, prior to undertaking airborne geophysical surveys or any ground disturbing activities utilising equipment such as scrapers, graders, bulldozers, backhoes, drilling rigs; water carting equipment or other mechanised equipment. | 11-Dec-2018 | |
5 | 1 | The Licensee or transferee, as the case may be, shall within thirty (30) days of receiving written notification of:-- the grant of the Licence; or
- registration of a transfer introducing a new Licensee;
advise, by registered post, the holder of any underlying pastoral or grazing lease details of the grant or transfer. | 11-Dec-2018 | |
6 | 1 | No interference with Geodetic Survey Station LENNARD RIVER 74 and mining within 15 metres thereof being confined to below a depth of 15 metres from the natural surface. | 11-Dec-2018 | |
7 | 1 | In respect of the area covered by the licence the licensee, if so requested in writing by the Wanjina-Wunggurr (Native Title) Aboriginal Corporation RNTBC , the native title prescribed body corporate holding the determined native title of the Wajina Wungurr Wilinggin Native Title Determination No 1 recognised in the Federal Court application No. WAD6015/1999 , such request being sent by pre-paid post to reach the licensee's address, not more than ninety days after the grant of this licence,shall within thirty days of the request execute in favour of the Wanjina-Wunggurr (Native Title) Aboriginal Corporation RNTBC the Regional Standard Heritage Agreement ("RSHA") endorsed by peak industry groups (e.g. the South West/Pilbara/Yamatji/Goldfields Land and Sea Council RSHA) and offered by the Native Title Party or their representatives. | 11-Dec-2018 | |
Cond # | Ver | Text | Start | End |
1 | 1 | All disturbances to the surface of the land made as a result of exploration, including costeans, drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Mines, Industry Regulation and Safety. Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, Department of Mines, Industry Regulation and Safety. | 11-Dec-2018 | |
2 | 1 | All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program. | 11-Dec-2018 | |
3 | 1 | Unless the written approval of the Environmental Officer, Department of Mines, Industry Regulation and Safety is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations. | 11-Dec-2018 | |
4 | 1 | The Licensee notifying the holder of any underlying pastoral or grazing lease by telephone or in person, or by registered post if contact cannot be made, prior to undertaking airborne geophysical surveys or any ground disturbing activities utilising equipment such as scrapers, graders, bulldozers, backhoes, drilling rigs; water carting equipment or other mechanised equipment. | 11-Dec-2018 | |
5 | 1 | The Licensee or transferee, as the case may be, shall within thirty (30) days of receiving written notification of:-- the grant of the Licence; or
- registration of a transfer introducing a new Licensee;
advise, by registered post, the holder of any underlying pastoral or grazing lease details of the grant or transfer. | 11-Dec-2018 | |
6 | 1 | No interference with Geodetic Survey Station LENNARD RIVER 74 and mining within 15 metres thereof being confined to below a depth of 15 metres from the natural surface. | 11-Dec-2018 | |
7 | 1 | In respect of the area covered by the licence the licensee, if so requested in writing by the Wanjina-Wunggurr (Native Title) Aboriginal Corporation RNTBC , the native title prescribed body corporate holding the determined native title of the Wajina Wungurr Wilinggin Native Title Determination No 1 recognised in the Federal Court application No. WAD6015/1999 , such request being sent by pre-paid post to reach the licensee's address, not more than ninety days after the grant of this licence,shall within thirty days of the request execute in favour of the Wanjina-Wunggurr (Native Title) Aboriginal Corporation RNTBC the Regional Standard Heritage Agreement ("RSHA") endorsed by peak industry groups (e.g. the South West/Pilbara/Yamatji/Goldfields Land and Sea Council RSHA) and offered by the Native Title Party or their representatives. | 11-Dec-2018 | |
Type | Number | Details |
Application to Amend | 565140 | Lodged:11:21:36 21 October 2019Amending:Address (Including DTC Details)From:Principal Place of Business : ELDERBERRY RESOURCES PTY LTD, U 12 398 GREAT EASTERN HWY, ASCOT, WA, 6104 and DTC :ELDERBERRY RESOURCES PTY LTD, U 12 398 GREAT EASTERN HWY, ASCOT, WA, 6104To:Principal Place of Business : ELDERBERRY RESOURCES PTY LTD, PO BOX 496, SOUTH PERTH, WA, 6951, xxxxxxxxxxxxxxxxx@igo.com.au, xxxxx300 and DTC :ELDERBERRY RESOURCES PTY LTD, C/- INDEPENDENCE GROUP NL, PO BOX 496, SOUTH PERTH, WA, 6951, xxxxxxxxxxxxxxxxx@igo.com.au, xxxxx300RECORDED:11:21:36 21 October 2019 |
Application to Amend | 621111 | Lodged:14:02:37 23 April 2021Amending:Address (Including DTC Details)From:ELDERBERRY RESOURCES PTY LTD, C/- INDEPENDENCE GROUP NL, PO BOX 496, SOUTH PERTH, WA, 6951, xxxxxxxxxxxxxxxxx@igo.com.au, xxxxx300To:ELDERBERRY RESOURCES PTY LTD, C/- INDEPENDENCE GROUP NL, PO BOX 496, SOUTH PERTH, WA, 6951, xxxxxxxxxxxxxxxxx@igo.com.au, xxxxx352RECORDED:14:02:37 23 April 2021 |
Application to Amend | 682030 | Lodged:14:19:49 25 July 2023Amending:Address (Including DTC Details)From:Principal Place of Business : ELDERBERRY RESOURCES PTY LTD, PO BOX 496, SOUTH PERTH, WA, 6951, xxxxxxxxxxxxxxxxx@igo.com.au, xxxxx300 and DTC :ELDERBERRY RESOURCES PTY LTD, C/- IGO LIMITED, PO BOX 496, SOUTH PERTH, WA, 6951, xxxxxxxxxxxxxxxxx@igo.com.au, xxxxx352To:Principal Place of Business : ELDERBERRY RESOURCES PTY LTD, C/- MCMAHON MINING TITLE SERVICES PTY LTD, PO BOX 6301, EAST PERTH, WA, 6892, xxxx@mmts.net.au, xxxxxxxxxxx997 and DTC :ELDERBERRY RESOURCES PTY LTD, MCMAHON MINING TITLE SERVICES PTY LTD, C/- MCMAHON MINING TITLE SERVICES PTY LTD, PO BOX 6301, EAST PERTH, WA, 6892, xxxx@mmts.net.au, xxxxxxxxxxx997RECORDED:14:19:49 25 July 2023 |
Extension / Renewal of Term | 691288 | Lodged:10:56:43 01 December 2023Applied For Period:5 YearsRECORDED:10:56:43 01 December 2023GRANTED:28 February 2024Granted Period:5 YearsTerm Extended To:10/12/2028 |
Partial Surrender - Compulsory | 720945 | Lodged:10:16:38 02 December 2024Section:Section 65 (3)Surrendered Blocks:BROOME 1066 z
BROOME 1067 r, s, v, w, x, y, z
BROOME 1068 n, o, s, t, u, v, w, x, y, z
BROOME 1069 v
BROOME 1139 e
BROOME 1140 a, b, c, d, e, g, h, j, m, n, o
BROOME 1141 a, f, lSurrendered Total:34 BL.REGISTERED:Midnight 10 December 2024Surrendered area to be released 08:30:00 08/01/2025 under Section 65 (3)Surrendered area released 08:30:00 08/01/2025 under Section 65 (3) |