Extracted from MTO on 08-Jul-2025 02:03,
last changed 01-Jul-2025.
# | Ver | Text | Start | End |
1 | 1 | Exploration and prospecting disturbances, excluding supporting infrastructure, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Energy, Mines, Industry Regulation and Safety. Backfilling and rehabilitation being required no later than 12 months after completion of the activity unless otherwise approved in writing by the Environmental Officer, Department of Energy, Mines, Industry Regulation and Safety. | 01-Jul-2024 | |
2 | 1 | All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program. | 01-Jul-2024 | |
3 | 1 | Unless the written approval of the Environmental Officer, Department of Energy, Mines, Industry Regulation and Safety is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations. | 01-Jul-2024 | |
4 | 1 | The Licensee making verbal or written contact with the holder of any underlying pastoral or grazing lease within a reasonable time prior to undertaking airborne geophysical surveys or any ground disturbing activities utilising equipment such as scrapers, graders, bulldozers, backhoes, drilling rigs; water carting equipment or other mechanised equipment. | 01-Jul-2024 | |
5 | 1 | The Licensee or transferee, as the case may be, shall within thirty (30) days of receiving written notification of:-- the grant of the Licence; or
- registration of a transfer introducing a new Licensee;
advise, by registered post, the holder of any underlying pastoral or grazing lease details of the grant or transfer. | 01-Jul-2024 | |
6 | 1 | All supporting infrastructure for exploration and prospecting including core yards, laydowns, camps, and access tracks (excluding drill lines), being rehabilitated to the satisfaction of the Environmental Officer, Department of Energy, Mines, Industry Regulation and Safety. Rehabilitation being required by the earlier of 12 months from the infrastructure being no longer required to support exploration, or 12 months from the relevant programme of work expiring, unless otherwise approved in writing by the Environmental Officer, Department of Energy, Mines, Industry Regulation and Safety. | 01-Jul-2024 | |
7 | 1 | The tenement holder must maintain appropriate records of exploration/prospecting activities, and associated rehabilitation undertaken, in order to demonstrate compliance with all conditions and environmental management and rehabilitation practice commitments. These records to be made available to the Department upon request. | 01-Jul-2024 | |
8 | 1 | All exploration and prospecting operations to comply with the environmental management and rehabilitation practice commitments provided in the approved programme of work. | 01-Jul-2024 | |
Cond # | Ver | Text | Start | End |
1 | 1 | Exploration and prospecting disturbances, excluding supporting infrastructure, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Energy, Mines, Industry Regulation and Safety. Backfilling and rehabilitation being required no later than 12 months after completion of the activity unless otherwise approved in writing by the Environmental Officer, Department of Energy, Mines, Industry Regulation and Safety. | 01-Jul-2024 | |
2 | 1 | All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program. | 01-Jul-2024 | |
3 | 1 | Unless the written approval of the Environmental Officer, Department of Energy, Mines, Industry Regulation and Safety is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations. | 01-Jul-2024 | |
4 | 1 | The Licensee making verbal or written contact with the holder of any underlying pastoral or grazing lease within a reasonable time prior to undertaking airborne geophysical surveys or any ground disturbing activities utilising equipment such as scrapers, graders, bulldozers, backhoes, drilling rigs; water carting equipment or other mechanised equipment. | 01-Jul-2024 | |
5 | 1 | The Licensee or transferee, as the case may be, shall within thirty (30) days of receiving written notification of:-- the grant of the Licence; or
- registration of a transfer introducing a new Licensee;
advise, by registered post, the holder of any underlying pastoral or grazing lease details of the grant or transfer. | 01-Jul-2024 | |
6 | 1 | All supporting infrastructure for exploration and prospecting including core yards, laydowns, camps, and access tracks (excluding drill lines), being rehabilitated to the satisfaction of the Environmental Officer, Department of Energy, Mines, Industry Regulation and Safety. Rehabilitation being required by the earlier of 12 months from the infrastructure being no longer required to support exploration, or 12 months from the relevant programme of work expiring, unless otherwise approved in writing by the Environmental Officer, Department of Energy, Mines, Industry Regulation and Safety. | 01-Jul-2024 | |
7 | 1 | The tenement holder must maintain appropriate records of exploration/prospecting activities, and associated rehabilitation undertaken, in order to demonstrate compliance with all conditions and environmental management and rehabilitation practice commitments. These records to be made available to the Department upon request. | 01-Jul-2024 | |
8 | 1 | All exploration and prospecting operations to comply with the environmental management and rehabilitation practice commitments provided in the approved programme of work. | 01-Jul-2024 | |
Type | Number | Details |
Application to Amend | 565140 | Lodged:11:21:36 21 October 2019Amending:Address (Including DTC Details)From:Principal Place of Business : ELDERBERRY RESOURCES PTY LTD, U 12 398 GREAT EASTERN HWY, ASCOT, WA, 6104 and DTC :ELDERBERRY RESOURCES PTY LTD, U 12 398 GREAT EASTERN HWY, ASCOT, WA, 6104To:Principal Place of Business : ELDERBERRY RESOURCES PTY LTD, PO BOX 496, SOUTH PERTH, WA, 6951, xxxxxxxxxxxxxxxxx@igo.com.au, xxxxx300 and DTC :ELDERBERRY RESOURCES PTY LTD, C/- INDEPENDENCE GROUP NL, PO BOX 496, SOUTH PERTH, WA, 6951, xxxxxxxxxxxxxxxxx@igo.com.au, xxxxx300RECORDED:11:21:36 21 October 2019 |
Application to Amend | 621111 | Lodged:14:02:37 23 April 2021Amending:Address (Including DTC Details)From:ELDERBERRY RESOURCES PTY LTD, C/- INDEPENDENCE GROUP NL, PO BOX 496, SOUTH PERTH, WA, 6951, xxxxxxxxxxxxxxxxx@igo.com.au, xxxxx300To:ELDERBERRY RESOURCES PTY LTD, C/- INDEPENDENCE GROUP NL, PO BOX 496, SOUTH PERTH, WA, 6951, xxxxxxxxxxxxxxxxx@igo.com.au, xxxxx352RECORDED:14:02:37 23 April 2021 |
Application to Amend | 682030 | Lodged:14:19:49 25 July 2023Amending:Address (Including DTC Details)From:Principal Place of Business : ELDERBERRY RESOURCES PTY LTD, PO BOX 496, SOUTH PERTH, WA, 6951, xxxxxxxxxxxxxxxxx@igo.com.au, xxxxx300 and DTC :ELDERBERRY RESOURCES PTY LTD, C/- IGO LIMITED, PO BOX 496, SOUTH PERTH, WA, 6951, xxxxxxxxxxxxxxxxx@igo.com.au, xxxxx352To:Principal Place of Business : ELDERBERRY RESOURCES PTY LTD, C/- MCMAHON MINING TITLE SERVICES PTY LTD, PO BOX 6301, EAST PERTH, WA, 6892, xxxx@mmts.net.au, xxxxxxxxxxx997 and DTC :ELDERBERRY RESOURCES PTY LTD, MCMAHON MINING TITLE SERVICES PTY LTD, C/- MCMAHON MINING TITLE SERVICES PTY LTD, PO BOX 6301, EAST PERTH, WA, 6892, xxxx@mmts.net.au, xxxxxxxxxxx997RECORDED:14:19:49 25 July 2023 |