Extracted from MTO on 13-Jul-2025 00:42,
last changed 04-Jul-2025.
# | Ver | Text | Start | End |
1 | 1 | All disturbances to the surface of the land made as a result of exploration, including costeans, drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, DMIRS. Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, DMIRS. | 05-Apr-2018 | |
2 | 1 | All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program. | 05-Apr-2018 | |
3 | 1 | Unless the written approval of the Environmental Officer, DMIRS is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations. | 05-Apr-2018 | |
4 | 1 | The Licensee notifying the holder of any underlying pastoral or grazing lease by telephone or in person, or by registered post if contact cannot be made, prior to undertaking airborne geophysical surveys or any ground disturbing activities utilising equipment such as scrapers, graders, bulldozers, backhoes, drilling rigs; water carting equipment or other mechanised equipment. | 05-Apr-2018 | |
5 | 1 | The Licensee or transferee, as the case may be, shall within thirty (30) days of receiving written notification of:-- the grant of the Licence; or
- registration of a transfer introducing a new Licensee;
advise, by registered post, the holder of any underlying pastoral or grazing lease details of the grant or transfer. | 05-Apr-2018 | |
6 | 1 | No interference with Geodetic Survey Station DBY 122 and DBY 123 and mining within 15 metres thereof being confined to below a depth of 15 metres from the natural surface. | 05-Apr-2018 | |
7 | 1 | The prior written consent of the Minister responsible for the Mining Act 1978 being obtained before commencing any exploration activities on Water Reserve 10674. | 05-Apr-2018 | |
8 | 1 | In respect of the area covered by the licence the licensee, if so requested in writing by the Warrwa Combined, the applicants in Federal Court application No. WAD258/2012 , such request being sent by pre-paid post to reach the licensee's address, not more than ninety days after the grant of this licence, shall within thirty days of the request execute in favour of the Warrwa Combined the Regional Standard Heritage Agreement ("RSHA") endorsed by peak industry groups (e.g. the South West/Ngaanyatjarra/Pilbara/Yamatji/Goldfields Land and Sea Council) and offered by the Native Title Party or their representative. | 05-Apr-2018 | |
| 1 | Consent to explore on Stock Route Reserve 12474 granted subject to: | 05-Apr-2018 | |
9 | 1 | No exploration activities being carried out on Stock Route Reserve 12474 which restrict the use of the reserve. | 05-Apr-2018 | |
Cond # | Ver | Text | Start | End |
1 | 1 | All disturbances to the surface of the land made as a result of exploration, including costeans, drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, DMIRS. Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, DMIRS. | 05-Apr-2018 | |
2 | 1 | All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program. | 05-Apr-2018 | |
3 | 1 | Unless the written approval of the Environmental Officer, DMIRS is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations. | 05-Apr-2018 | |
4 | 1 | The Licensee notifying the holder of any underlying pastoral or grazing lease by telephone or in person, or by registered post if contact cannot be made, prior to undertaking airborne geophysical surveys or any ground disturbing activities utilising equipment such as scrapers, graders, bulldozers, backhoes, drilling rigs; water carting equipment or other mechanised equipment. | 05-Apr-2018 | |
5 | 1 | The Licensee or transferee, as the case may be, shall within thirty (30) days of receiving written notification of:-- the grant of the Licence; or
- registration of a transfer introducing a new Licensee;
advise, by registered post, the holder of any underlying pastoral or grazing lease details of the grant or transfer. | 05-Apr-2018 | |
6 | 1 | No interference with Geodetic Survey Station DBY 122 and DBY 123 and mining within 15 metres thereof being confined to below a depth of 15 metres from the natural surface. | 05-Apr-2018 | |
7 | 1 | The prior written consent of the Minister responsible for the Mining Act 1978 being obtained before commencing any exploration activities on Water Reserve 10674. | 05-Apr-2018 | |
8 | 1 | In respect of the area covered by the licence the licensee, if so requested in writing by the Warrwa Combined, the applicants in Federal Court application No. WAD258/2012 , such request being sent by pre-paid post to reach the licensee's address, not more than ninety days after the grant of this licence, shall within thirty days of the request execute in favour of the Warrwa Combined the Regional Standard Heritage Agreement ("RSHA") endorsed by peak industry groups (e.g. the South West/Ngaanyatjarra/Pilbara/Yamatji/Goldfields Land and Sea Council) and offered by the Native Title Party or their representative. | 05-Apr-2018 | |
| 1 | Consent to explore on Stock Route Reserve 12474 granted subject to: | 05-Apr-2018 | |
9 | 1 | No exploration activities being carried out on Stock Route Reserve 12474 which restrict the use of the reserve. | 05-Apr-2018 | |
Type | Number | Details |
Extension / Renewal of Term | 672334 | Lodged:15:27:04 31 March 2023Applied For Period:5 YearsRECORDED:15:27:04 31 March 2023GRANTED:07 July 2023Granted Period:5 YearsTerm Extended To:04/04/2028 |
Partial Surrender - Compulsory | 702749 | Lodged:13:10:04 01 May 2024Section:Section 65 (3)Surrendered Blocks:BROOME 1198 o
BROOME 1199 q, w, x, ySurrendered Total:5 BL.REJECTED:13:10:04 01 May 2024 |
Partial Surrender - Compulsory | 706494 | Lodged:14:33:34 12 June 2024Section:Section 65 (3)Surrendered Blocks:BROOME 1198 o
BROOME 1199 q, w, x, ySurrendered Total:5 BL.REJECTED:14:33:34 12 June 2024 |
Forfeiture | 708164 | Initiated:01/07/2024 for non-compliance with Section 65 compulsory surrender provisionsRECORDED:08:30 01 July 2024FINALISED:Order by Minister on 05 May 2025 that E 04/2478 be Penalty ImposedNotice Issued:Regulation 50 Notice sent 01/07/2024 for non-compliance with Section 65 compulsory surrender provisions pursuant to Sec 65(3).Compliance Date:07/08/2024 |
Partial Surrender - Compulsory | 709726 | Lodged:15:37:01 17 July 2024Section:Section 65 (3)Surrendered Blocks:BROOME 1198 o
BROOME 1199 q, w, x, ySurrendered Total:5 BL.REGISTERED:15:37:01 17 July 2024Surrendered area to be released 08:30:00 09/08/2024 under Section 65 (3)Surrendered area released 08:30:00 09/08/2024 under Section 65 (3) |
Fine | 732403 | Fine in respect to:Forfeiture Process 708164Fine reason:Non-compliance with compulsory surrender provisionsPenalty amount:$1,500.00Notification date:07/05/2025Due date:11/06/2025Pursuant to:Section 96A(5)RECORDED:05 May 2025PAYMENT RECEIVED:08 May 2025FINALISED:08 May 2025Receipt Number:53438393179Amount:$1,500.00Remaining balance:$0.00 |