Extracted from MTO on 15-Jul-2025 00:37,
last changed 10-Jul-2025.
# | Ver | Text | Start | End |
1 | 1 | All disturbances to the surface of the land made as a result of exploration, including costeans, drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Mines and Petroleum (DMP). Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, DMP. | 06-Jun-2017 | |
2 | 1 | All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program. | 06-Jun-2017 | |
3 | 1 | Unless the written approval of the Environmental Officer, DMP is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations. | 06-Jun-2017 | |
4 | 1 | The Licensee notifying the holder of any underlying pastoral or grazing lease by telephone or in person, or by registered post if contact cannot be made, prior to undertaking airborne geophysical surveys or any ground disturbing activities utilising equipment such as scrapers, graders, bulldozers, backhoes, drilling rigs; water carting equipment or other mechanised equipment. | 06-Jun-2017 | |
5 | 1 | The Licensee or transferee, as the case may be, shall within thirty (30) days of receiving written notification of:-- the grant of the Licence; or
- registration of a transfer introducing a new Licensee;
advise, by registered post, the holder of any underlying pastoral or grazing lease details of the grant or transfer. | 06-Jun-2017 | |
Cond # | Ver | Text | Start | End |
1 | 1 | All disturbances to the surface of the land made as a result of exploration, including costeans, drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Mines and Petroleum (DMP). Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, DMP. | 06-Jun-2017 | |
2 | 1 | All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program. | 06-Jun-2017 | |
3 | 1 | Unless the written approval of the Environmental Officer, DMP is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations. | 06-Jun-2017 | |
4 | 1 | The Licensee notifying the holder of any underlying pastoral or grazing lease by telephone or in person, or by registered post if contact cannot be made, prior to undertaking airborne geophysical surveys or any ground disturbing activities utilising equipment such as scrapers, graders, bulldozers, backhoes, drilling rigs; water carting equipment or other mechanised equipment. | 06-Jun-2017 | |
5 | 1 | The Licensee or transferee, as the case may be, shall within thirty (30) days of receiving written notification of:-- the grant of the Licence; or
- registration of a transfer introducing a new Licensee;
advise, by registered post, the holder of any underlying pastoral or grazing lease details of the grant or transfer. | 06-Jun-2017 | |
Type | Number | Details |
Application to Amend | 510442 | Lodged:13:05 13 July 2017Amending:Address (Including DTC Details)From:LUCAPA DIAMOND COMPANY LIMITED, RICHARD PRICE, 34 BAGOT RD, SUBIACO, WA, 6008, xxxxxx@lucapa.com.au, xxxxxxx850To:LUCAPA DIAMOND COMPANY LIMITED, RICHARD PRICE, PO BOX 298, WEST PERTH, WA, 6872, xxxxxx@lucapa.com.au, xxxxxxx850RECORDED:13:05 13 July 2017 |
Application to Amend | 522539 | Lodged:08:40 01 February 2018Amending:Address (Including DTC Details)From:Principal Place of Business : LUCAPA DIAMOND COMPANY LIMITED, 34 BAGOT RD, SUBIACO, WA, 6008, xxxxxxx@lucapa.com.au, xxxxxxx995 and DTC :LUCAPA DIAMOND COMPANY LIMITED, RICHARD PRICE, PO BOX 298, WEST PERTH, WA, 6872, xxxxxx@lucapa.com.au, xxxxxxx850To:Principal Place of Business : LUCAPA DIAMOND COMPANY LIMITED, PO BOX 1091, WEST PERTH, WA, 6872 and DTC :LUCAPA DIAMOND COMPANY LIMITED, PO BOX 1091, WEST PERTH, WA, 6872RECORDED:08:40 01 February 2018 |
Extension / Renewal of Term | 649415 | Lodged:11:43:39 16 May 2022Applied For Period:5 YearsRECORDED:11:43:39 16 May 2022GRANTED:05 August 2022Granted Period:5 YearsTerm Extended To:05/06/2027 |