# | Ver | Text | Start | End |
1 | 1 | All disturbances to the surface of the land made as a result of exploration, including costeans, drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Mines and Petroleum (DMP). Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, DMP. | 08-Feb-2017 | |
2 | 1 | All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program. | 08-Feb-2017 | |
3 | 1 | Unless the written approval of the Environmental Officer, DMP is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations. | 08-Feb-2017 | |
4 | 1 | The Licensee notifying the holder of any underlying pastoral or grazing lease by telephone or in person, or by registered post if contact cannot be made, prior to undertaking airborne geophysical surveys or any ground disturbing activities utilising equipment such as scrapers, graders, bulldozers, backhoes, drilling rigs; water carting equipment or other mechanised equipment. | 08-Feb-2017 | |
5 | 1 | The Licensee or transferee, as the case may be, shall within thirty (30) days of receiving written notification of:-- the grant of the Licence; or
- registration of a transfer introducing a new Licensee;
advise, by registered post, the holder of any underlying pastoral or grazing lease details of the grant or transfer. | 08-Feb-2017 | |
6 | 1 | No excavation, excepting shafts, approaching closer to the Great Northern Highway Highway, Highway verge or the road reserve than a distance equal to twice the depth of the excavation and mining on the Great Northern Highway Highway or Highway verge being confined to below a depth of 30 metres from the natural surface. | 08-Feb-2017 | |
7 | 1 | No interference with Geodetic Survey Station Broome 58, 59, 60, 61 and 62 and mining within 15 metres thereof being confined to below a depth of 15 metres from the natural surface. | 08-Feb-2017 | |
| 1 | In respect to the area outlined in "red" (FNA 7672) as shown in TENGRAPH the following condition shall apply: | 08-Feb-2017 | |
8 | 1 | No prospecting, exploration or mining activities being conducted that will interfere with or endanger the construction or operation of the Gas/Petroleum pipeline and associated facilities and rights of ingress to and egress from the area being at all times preserved to the holders, their employees, agents and contractors. | 08-Feb-2017 | |
Cond # | Ver | Text | Start | End |
1 | 1 | All disturbances to the surface of the land made as a result of exploration, including costeans, drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Mines and Petroleum (DMP). Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, DMP. | 08-Feb-2017 | |
2 | 1 | All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program. | 08-Feb-2017 | |
3 | 1 | Unless the written approval of the Environmental Officer, DMP is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations. | 08-Feb-2017 | |
4 | 1 | The Licensee notifying the holder of any underlying pastoral or grazing lease by telephone or in person, or by registered post if contact cannot be made, prior to undertaking airborne geophysical surveys or any ground disturbing activities utilising equipment such as scrapers, graders, bulldozers, backhoes, drilling rigs; water carting equipment or other mechanised equipment. | 08-Feb-2017 | |
5 | 1 | The Licensee or transferee, as the case may be, shall within thirty (30) days of receiving written notification of:-- the grant of the Licence; or
- registration of a transfer introducing a new Licensee;
advise, by registered post, the holder of any underlying pastoral or grazing lease details of the grant or transfer. | 08-Feb-2017 | |
6 | 1 | No excavation, excepting shafts, approaching closer to the Great Northern Highway Highway, Highway verge or the road reserve than a distance equal to twice the depth of the excavation and mining on the Great Northern Highway Highway or Highway verge being confined to below a depth of 30 metres from the natural surface. | 08-Feb-2017 | |
7 | 1 | No interference with Geodetic Survey Station Broome 58, 59, 60, 61 and 62 and mining within 15 metres thereof being confined to below a depth of 15 metres from the natural surface. | 08-Feb-2017 | |
| 1 | In respect to the area outlined in "red" (FNA 7672) as shown in TENGRAPH the following condition shall apply: | 08-Feb-2017 | |
8 | 1 | No prospecting, exploration or mining activities being conducted that will interfere with or endanger the construction or operation of the Gas/Petroleum pipeline and associated facilities and rights of ingress to and egress from the area being at all times preserved to the holders, their employees, agents and contractors. | 08-Feb-2017 | |
Type | Number | Details |
Extension of Time | 527341 | Lodged:16:15:09 06 April 2018Type:Form 5RECORDED:16:15:09 06 April 2018APPROVED:15:01:40 10 April 2018Time to lodge extended to 20/04/2018 |
Extension of Time | 529443 | Lodged:15:18:39 04 May 2018Type:Stat DecRECORDED:15:18:39 04 May 2018APPROVED:11:54:20 14 May 2018Time to lodge extended to 18 May 2018 |
Extension of Time | 530699 | Lodged:14:40 18 May 2018Type:Stat DecRECORDED:14:40 18 May 2018APPROVED:16:00 18 May 2018Time to lodged extended to 25/05/2018 |
Surrender - Outright | 576413 | Lodged:14:00:31 20 April 2020REGISTERED:14:00:31 20 April 2020 |