Extracted from MTO on 07-Jul-2025 01:56,
last changed 29-Jun-2025.
# | Ver | Text | Start | End |
1 | 1 | All disturbances to the surface of the land made as a result of exploration, including costeans, drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, DMIRS. Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, DMIRS. | 13-Sep-2017 | |
2 | 1 | All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program. | 13-Sep-2017 | |
3 | 1 | Unless the written approval of the Environmental Officer, DMIRS is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations. | 13-Sep-2017 | |
4 | 1 | The Licensee notifying the holder of any underlying pastoral or grazing lease by telephone or in person, or by registered post if contact cannot be made, prior to undertaking airborne geophysical surveys or any ground disturbing activities utilising equipment such as scrapers, graders, bulldozers, backhoes, drilling rigs; water carting equipment or other mechanised equipment. | 13-Sep-2017 | |
5 | 1 | The Licensee or transferee, as the case may be, shall within thirty (30) days of receiving written notification of:-- the grant of the Licence; or
- registration of a transfer introducing a new Licensee;
advise, by registered post, the holder of any underlying pastoral or grazing lease details of the grant or transfer. | 13-Sep-2017 | |
6 | 1 | No interference with Geodetic Survey Station SSM-R 344 and mining within 15 metres thereof being confined to below a depth of 15 metres from the natural surface. | 13-Sep-2017 | |
7 | 1 | The prior written consent of the Minister responsible for the Mining Act 1978 being obtained before commencing any exploration activities on Watering Place Reserve 1583. | 13-Sep-2017 | |
| 1 | Consent to explore on Fitzroy Crossing to Mount Krauss Stock Route Reserve 23897 granted subject to the following condition: | 13-Sep-2017 | |
8 | 1 | No exploration activities being carried out on Fitzroy Crossing to Mount Krauss Stock Route Reserve 23897 which restrict the use of the reserve. | 13-Sep-2017 | |
Cond # | Ver | Text | Start | End |
1 | 1 | All disturbances to the surface of the land made as a result of exploration, including costeans, drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, DMIRS. Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, DMIRS. | 13-Sep-2017 | |
2 | 1 | All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program. | 13-Sep-2017 | |
3 | 1 | Unless the written approval of the Environmental Officer, DMIRS is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations. | 13-Sep-2017 | |
4 | 1 | The Licensee notifying the holder of any underlying pastoral or grazing lease by telephone or in person, or by registered post if contact cannot be made, prior to undertaking airborne geophysical surveys or any ground disturbing activities utilising equipment such as scrapers, graders, bulldozers, backhoes, drilling rigs; water carting equipment or other mechanised equipment. | 13-Sep-2017 | |
5 | 1 | The Licensee or transferee, as the case may be, shall within thirty (30) days of receiving written notification of:-- the grant of the Licence; or
- registration of a transfer introducing a new Licensee;
advise, by registered post, the holder of any underlying pastoral or grazing lease details of the grant or transfer. | 13-Sep-2017 | |
6 | 1 | No interference with Geodetic Survey Station SSM-R 344 and mining within 15 metres thereof being confined to below a depth of 15 metres from the natural surface. | 13-Sep-2017 | |
7 | 1 | The prior written consent of the Minister responsible for the Mining Act 1978 being obtained before commencing any exploration activities on Watering Place Reserve 1583. | 13-Sep-2017 | |
| 1 | Consent to explore on Fitzroy Crossing to Mount Krauss Stock Route Reserve 23897 granted subject to the following condition: | 13-Sep-2017 | |
8 | 1 | No exploration activities being carried out on Fitzroy Crossing to Mount Krauss Stock Route Reserve 23897 which restrict the use of the reserve. | 13-Sep-2017 | |
Type | Number | Details |
Objection | 490300 | Lodged:11:38:13 08 July 2016Objectors:W.N.M. MACDONALD PTY LTDObjection Type:Tenement ApplicationRECORDED:11:38:13 08 July 2016received minute of programming directions to finalise objection dated 9 march 2017.FINALISED:10:00 29 March 2017Wardens Decision Made on:10:00 29 March 2017Wardens Decision Status:Finalised |
Application to Amend | 504528 | Lodged:08:30 13 April 2017Amending:Address (Including DTC Details)From:MT PIERRE PTY LTD, MATTHEW ROLFE, 43A JECKS ST, ROCKINGHAM, WA, 6168, xxxxxxx@hotmail.com, xxxxxxx226To:MT PIERRE PTY LTD, MT PIERRE PTY LTD, 117 PARKIN ST, ROCKINGHAM, WA, 6168, xxxxxxx@hotmail.com, xxxxxxx226RECORDED:08:30 13 April 2017 |
Application to Amend | 527034 | Lodged:14:51:32 04 April 2018Amending:Address (Including DTC Details)From:Principal Place of Business : MT PIERRE PTY LTD, 43A JECKS ST, ROCKINGHAM, WA, 6168, xxxxxxx@hotmail.com, xxxxxxx226 and DTC :MT PIERRE PTY LTD, MT PIERRE PTY LTD, 117 PARKIN ST, ROCKINGHAM, WA, 6168, xxxxxxx@hotmail.com, xxxxxxx226To:Principal Place of Business : MT PIERRE PTY LTD, C/- MCMAHON MINING TITLE SERVICES PTY LTD, PO BOX 592, MAYLANDS, WA, 6931, xxxx@mmts.net.au, xxxxxxxxx997 and DTC :MT PIERRE PTY LTD, MCMAHON MINING TITLE SERVICES PTY LTD, C/- MCMAHON MINING TITLE SERVICES PTY LTD, PO BOX 592, MAYLANDS, WA, 6931, xxxx@mmts.net.au, xxxxxxxxx997RECORDED:14:51:32 04 April 2018 |
Forfeiture | 546240 | Initiated:10/01/2019 for non-compliance with expenditure conditionsRECORDED:10:00 18 January 2019Notice Issued:Regulation 50 Notice sent 10/01/2019 for non-compliance with expenditure conditions pursuant to Reg 15.Compliance Date:13/02/2019FINALISED:Order by Minister on 03 April 2019 that E 04/2453 be Penalty Imposed |
Fine | 550827 | Fine in respect to:Forfeiture Process 546240Fine reason:Non-compliance with expenditure obligationsPenalty amount:$1,006.00Notification date:03/04/2019Due date:08/05/2019Pursuant to:Section 96A(5)RECORDED:03 April 2019PAYMENT RECEIVED:06 May 2019FINALISED:06 May 2019Receipt Number:10094977Amount:$1,006.00Remaining balance:$0.00 |
Surrender - Outright | 562857 | Lodged:10:49:46 12 September 2019REGISTERED:10:49:46 12 September 2019 |