Extracted from MTO on 16-Jul-2025 00:26,
last changed 01-Jul-2025.
# | Ver | Text | Start | End |
1 | 1 | All disturbances to the surface of the land made as a result of exploration, including costeans, drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Mines, Industry Regulation and Safety. Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, Department of Mines, Industry Regulation and Safety. | 05-Aug-2020 | |
2 | 1 | All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program. | 05-Aug-2020 | |
3 | 1 | Unless the written approval of the Environmental Officer, Department of Mines, Industry Regulation and Safety is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations. | 05-Aug-2020 | |
4 | 1 | The licensee notifying the holder of any underlying pastoral or grazing lease by telephone or in person, or by registered post if contact cannot be made, prior to undertaking airborne geophysical surveys or any ground disturbing activities utilising equipment such as scrapers, graders, bulldozers, backhoes, drilling rigs; water carting equipment or other mechanised equipment. | 05-Aug-2020 | |
5 | 1 | The licensee or transferee, as the case may be, shall within thirty (30) days of receiving written notification of:-
- the grant of the Licence; or
- registration of a transfer introducing a new Licensee;
advise, by registered post, the holder of any underlying pastoral or grazing lease details of the grant or transfer. | 05-Aug-2020 | |
6 | 1 | The licencee exercising its rights under the licence only to the extent of carrying out a magnetotellurics survey.
| 05-Aug-2020 | |
7 | 1 | The licencee not using any ground disturbing equipment on the licence area.
| 05-Aug-2020 | |
8 | 1 | The licencee accessing the licence area from the western boundary of the licence. | 05-Aug-2020 | |
9 | 1 | The licencee not assigning the licence unless and until the assignee executes and delivers to the native title party a deed expressed to be for the benefit of the native title party by which the assignee undertakes to be bound by these conditions as if it were the licencee. In the case of an assignment consisting of the entering into of a mortgage, charge or other security, the deed must provide that the assignee undertakes:
a) to be bound by these conditions as if it were the licencee, if it or anyone on its behalf enters into possession of the licence, or if it appoints a receiver to enter into possession of the licence; and
b) not to transfer the licence under any power of sale unless the purchaser executes a deed expressed to be for the benefit of the native title party by which the purchaser undertakes to be bound by these conditions as if it were the licencee.
| 05-Aug-2020 | |
Cond # | Ver | Text | Start | End |
1 | 1 | All disturbances to the surface of the land made as a result of exploration, including costeans, drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Mines, Industry Regulation and Safety. Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, Department of Mines, Industry Regulation and Safety. | 05-Aug-2020 | |
2 | 1 | All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program. | 05-Aug-2020 | |
3 | 1 | Unless the written approval of the Environmental Officer, Department of Mines, Industry Regulation and Safety is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations. | 05-Aug-2020 | |
4 | 1 | The licensee notifying the holder of any underlying pastoral or grazing lease by telephone or in person, or by registered post if contact cannot be made, prior to undertaking airborne geophysical surveys or any ground disturbing activities utilising equipment such as scrapers, graders, bulldozers, backhoes, drilling rigs; water carting equipment or other mechanised equipment. | 05-Aug-2020 | |
5 | 1 | The licensee or transferee, as the case may be, shall within thirty (30) days of receiving written notification of:-
- the grant of the Licence; or
- registration of a transfer introducing a new Licensee;
advise, by registered post, the holder of any underlying pastoral or grazing lease details of the grant or transfer. | 05-Aug-2020 | |
6 | 1 | The licencee exercising its rights under the licence only to the extent of carrying out a magnetotellurics survey.
| 05-Aug-2020 | |
7 | 1 | The licencee not using any ground disturbing equipment on the licence area.
| 05-Aug-2020 | |
8 | 1 | The licencee accessing the licence area from the western boundary of the licence. | 05-Aug-2020 | |
9 | 1 | The licencee not assigning the licence unless and until the assignee executes and delivers to the native title party a deed expressed to be for the benefit of the native title party by which the assignee undertakes to be bound by these conditions as if it were the licencee. In the case of an assignment consisting of the entering into of a mortgage, charge or other security, the deed must provide that the assignee undertakes:
a) to be bound by these conditions as if it were the licencee, if it or anyone on its behalf enters into possession of the licence, or if it appoints a receiver to enter into possession of the licence; and
b) not to transfer the licence under any power of sale unless the purchaser executes a deed expressed to be for the benefit of the native title party by which the purchaser undertakes to be bound by these conditions as if it were the licencee.
| 05-Aug-2020 | |
Type | Number | Details |
Application to Amend | 629806 | Lodged:14:44:10 06 August 2021Amending:Address (Including DTC Details)From:Principal Place of Business : KALLENIA MINES PTY LTD, SAME AS CORRESPONDENCE and DTC :KALLENIA MINES PTY LTD, PO BOX 884, VICTORIA PARK, WA, 6979To:Principal Place of Business : KALLENIA MINES PTY LTD, PO BOX 884, VICTORIA PARK, WA, 6979 and DTC :KALLENIA MINES PTY LTD, THE TENEMENT MANAGER, DEBLIN TENEMENT MANAGEMENT SERVICES, PO BOX 456, MOUNT HAWTHORN, WA, 6915, xxxxx@deblin.com.au, xxxxxxx190RECORDED:14:44:10 06 August 2021 |
Application to Amend | 681030 | Lodged:14:10:09 14 July 2023Amending:Address (Including DTC Details)From:Principal Place of Business : KALLENIA MINES PTY LTD, PO BOX 884, VICTORIA PARK, WA, 6979 and DTC :KALLENIA MINES PTY LTD, THE TENEMENT MANAGER, DEBLIN TENEMENT MANAGEMENT SERVICES, PO BOX 456, MOUNT HAWTHORN, WA, 6915, xxxxx@deblin.com.au, xxxxxxx190To:Principal Place of Business : KALLENIA MINES PTY LTD, PO BOX 884, VICTORIA PARK, WA, 6979, xxxxxxxxxxxx@hotmail.com and DTC :KALLENIA MINES PTY LTD, KALLENIA MINES PTY LTD, PO BOX 884, VICTORIA PARK, WA, 6979, xxxxxxxxxxxx@hotmail.comRECORDED:14:10:09 14 July 2023 |
Referred to Native Title Date | Referral Type | Current Status | Procedure | Details | Objections | Water Comments | Determination Areas | Claims | Representative Area Bodies |
10-Feb-2016 | Tenement Application | RTN Procedure : Right to Negotiate Cleared - Grant | RTN Procedure | 4 BL18130S123430E101.5km S'ly of Derby2017-09-12 | | | | Nyikina and Mangala(WC1999/025)WC1999/025WAD6099/1998falsePartially DeterminedSection 35 Neg Activity - Finalised Neg Outcome Activity - In Progress
| 10KimberleyKimberley Land Council Aboriginal Corporation |
10-Feb-2016 | Tenement Application | Expedited Procedure : Expedited Does Not Apply | Expedited Procedure | 2016-03-042016-07-04FINALISED - Expedited Does Not Apply2017-09-014 BL18130S123430E101.5km S'ly of Derby | WO2016/04202016-06-22WC1999/025Objection Upheld2017-09-01 | | NYIKINA MANGALA(WCD2014/003)WC1999/025WAD6099/1998trueWCD2014/003EXISTNo | | 10KimberleyKimberley Land Council Aboriginal Corporation |