# | Ver | Text | Start | End |
1 | 1 | All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program. | 23-May-2016 | |
2 | 1 | Unless the written approval of the Environmental Officer, DMP is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations. | 23-May-2016 | |
3 | 1 | The Licensee notifying the holder of any underlying pastoral or grazing lease by telephone or in person, or by registered post if contact cannot be made, prior to undertaking airborne geophysical surveys or any ground disturbing activities utilising equipment such as scrapers, graders, bulldozers, backhoes, drilling rigs; water carting equipment or other mechanised equipment. | 23-May-2016 | |
4 | 1 | The Licensee or transferee, as the case may be, shall within thirty (30) days of receiving written notification of:-- the grant of the Licence; or
- registration of a transfer introducing a new Licensee;
advise, by registered post, the holder of any underlying pastoral or grazing lease details of the grant or transfer. | 23-May-2016 | |
5 | 1 | All disturbances to the surface of the land made as a result of exploration, including costeans, drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Mines, Industry Regulation and Safety. Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, Department of Mines, Industry Regulation and Safety. | 30-Jul-2019 | |
Cond # | Ver | Text | Start | End |
1 | 1 | All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program. | 23-May-2016 | |
2 | 1 | Unless the written approval of the Environmental Officer, DMP is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations. | 23-May-2016 | |
3 | 1 | The Licensee notifying the holder of any underlying pastoral or grazing lease by telephone or in person, or by registered post if contact cannot be made, prior to undertaking airborne geophysical surveys or any ground disturbing activities utilising equipment such as scrapers, graders, bulldozers, backhoes, drilling rigs; water carting equipment or other mechanised equipment. | 23-May-2016 | |
4 | 1 | The Licensee or transferee, as the case may be, shall within thirty (30) days of receiving written notification of:-- the grant of the Licence; or
- registration of a transfer introducing a new Licensee;
advise, by registered post, the holder of any underlying pastoral or grazing lease details of the grant or transfer. | 23-May-2016 | |
5 | 1 | All disturbances to the surface of the land made as a result of exploration, including costeans, drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Mines, Industry Regulation and Safety. Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, Department of Mines, Industry Regulation and Safety. | 30-Jul-2019 | |
Type | Number | Details |
Extension of Time | 537148 | Lodged:13:58:21 15 August 2018Type:Stat DecRECORDED:13:58:21 15 August 2018APPROVED:14:20:04 16 August 2018Time to lodge extended to 07/09/2018 |
Forfeiture | 542469 | Initiated:22/10/2018 for non-compliance with expenditure conditionsRECORDED:14:30 09 November 2018Notice Issued:Regulation 50 Notice sent 22/10/2018 for non-compliance with expenditure conditions pursuant to Reg 15.Compliance Date:27/11/2018FINALISED:Order by Minister on 18 December 2018 that E 04/2423 be Penalty Imposed |
Fine | 544895 | Fine in respect to:Forfeiture Process 542469Fine reason:Non-compliance with expenditure obligationsPenalty amount:$2,092.00Notification date:18/12/2018Due date:22/01/2019Pursuant to:Section 96A(5)RECORDED:18 December 2018PAYMENT RECEIVED:21 January 2019FINALISED:22 January 2019Receipt Number:10083142Amount:$2,092.00Remaining balance:$0.00 |
Application to Amend | 549621 | Lodged:08:30 19 March 2019Amending:Address (Including DTC Details)From:Principal Place of Business : FISSURE EXPLORATION PTY LTD, SAME AS CORRESPONDENCE and DTC :FISSURE EXPLORATION PTY LTD, C/- AUSTWIDE MINING TITLE MANAGEMENT PTY LTD, PO BOX 1434, WANGARA, WA, 6947To:Principal Place of Business : FISSURE EXPLORATION PTY LTD, PO BOX 8197, SUBIACO EAST, WA, 6008, xxxxxx@mmwc.com.au, xxxxxxxxx866 and DTC :FISSURE EXPLORATION PTY LTD, C/- M & M WALTER CONSULTING, PO BOX 8197, SUBIACO EAST, WA, 6008, xxxxxx@mmwc.com.au, xxxxxxxxx866RECORDED:08:30 19 March 2019 |
Application to Amend | 575566 | Lodged:10:20:22 06 April 2020Amending:Address (Including DTC Details)From:Principal Place of Business : BUXTON RESOURCES LTD, PO BOX 8197, SUBIACO EAST, WA, 6008, xxxxxx@mmwc.com.au, xxxxxxxxx866 and DTC :BUXTON RESOURCES LTD, C/- M & M WALTER CONSULTING, PO BOX 8197, SUBIACO EAST, WA, 6008, xxxxxx@mmwc.com.au, xxxxxxxxx866To:Principal Place of Business : BUXTON RESOURCES LTD, C/- IGO LIMITED, PO BOX 496, SOUTH PERTH, WA, 6951, xxxxxxxxxxxxxxxxx@igo.com.au, xxxxx352 and DTC :BUXTON RESOURCES LTD, C/- IGO LIMITED, PO BOX 496, SOUTH PERTH, WA, 6951, xxxxxxxxxxxxxxxxx@igo.com.au, xxxxx352REJECTED:10:20:22 06 April 2020 |
Application to Amend | 575607 | Lodged:15:18:21 06 April 2020Amending:Address (Including DTC Details)From:Principal Place of Business : BUXTON RESOURCES LTD, PO BOX 8197, SUBIACO EAST, WA, 6008, xxxxxx@mmwc.com.au, xxxxxxxxx866 and DTC :BUXTON RESOURCES LTD, C/- M & M WALTER CONSULTING, PO BOX 8197, SUBIACO EAST, WA, 6008, xxxxxx@mmwc.com.au, xxxxxxxxx866To:Principal Place of Business : BUXTON RESOURCES LTD, C/- IGO LIMITED, PO BOX 496, SOUTH PERTH, WA, 6951, xxxxxxxxxxxxxxxxx@igo.com.au, xxxxx352 and DTC :BUXTON RESOURCES LTD, C/- IGO LIMITED, PO BOX 496, SOUTH PERTH, WA, 6951, xxxxxxxxxxxxxxxxx@igo.com.au, xxxxx352RECORDED:15:18:21 06 April 2020 |
Extension / Renewal of Term | 621933 | Lodged:16:26:31 06 May 2021Applied For Period:5 YearsRECORDED:16:26:31 06 May 2021GRANTED:22 July 2021Granted Period:5 YearsTerm Extended To:22/05/2026 |
Partial Surrender - Compulsory | 648655 | Lodged:15:01:48 06 May 2022Section:Section 65 (3)Surrendered Blocks:BROOME 698 z
BROOME 699 v
BROOME 770 e, k, p
BROOME 771 a, b, f, g, h, j, l, m, n, o, p
BROOME 772 lSurrendered Total:17 BL.REGISTERED:Midnight 22 May 2022Surrendered area to be released 08:30:00 14/06/2022 under Section 65 (3)Surrendered area released 08:30:00 14/06/2022 under Section 65 (3) |