Extracted from MTO on 29-Jun-2025 00:53,
last changed 29-Jun-2025.
# | Ver | Text | Start | End |
1 | 1 | All disturbances to the surface of the land made as a result of exploration, including costeans, drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, DMIRS. Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, DMIRS. | 03-Jul-2018 | |
2 | 1 | All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program. | 03-Jul-2018 | |
3 | 1 | Unless the written approval of the Environmental Officer, DMIRS is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations. | 03-Jul-2018 | |
4 | 1 | The Licensee notifying the holder of any underlying pastoral or grazing lease by telephone or in person, or by registered post if contact cannot be made, prior to undertaking airborne geophysical surveys or any ground disturbing activities utilising equipment such as scrapers, graders, bulldozers, backhoes, drilling rigs; water carting equipment or other mechanised equipment. | 03-Jul-2018 | |
5 | 1 | The Licensee or transferee, as the case may be, shall within thirty (30) days of receiving written notification of:-- the grant of the Licence; or
- registration of a transfer introducing a new Licensee;
advise, by registered post, the holder of any underlying pastoral or grazing lease details of the grant or transfer. | 03-Jul-2018 | |
Cond # | Ver | Text | Start | End |
1 | 1 | All disturbances to the surface of the land made as a result of exploration, including costeans, drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, DMIRS. Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, DMIRS. | 03-Jul-2018 | |
2 | 1 | All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program. | 03-Jul-2018 | |
3 | 1 | Unless the written approval of the Environmental Officer, DMIRS is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations. | 03-Jul-2018 | |
4 | 1 | The Licensee notifying the holder of any underlying pastoral or grazing lease by telephone or in person, or by registered post if contact cannot be made, prior to undertaking airborne geophysical surveys or any ground disturbing activities utilising equipment such as scrapers, graders, bulldozers, backhoes, drilling rigs; water carting equipment or other mechanised equipment. | 03-Jul-2018 | |
5 | 1 | The Licensee or transferee, as the case may be, shall within thirty (30) days of receiving written notification of:-- the grant of the Licence; or
- registration of a transfer introducing a new Licensee;
advise, by registered post, the holder of any underlying pastoral or grazing lease details of the grant or transfer. | 03-Jul-2018 | |
Type | Number | Details |
Objection | 472660 | Lodged:16:08:52 10 August 2015Objectors:KIMBERLEY DIAMOND CO. NLObjection Type:Tenement ApplicationRECORDED:16:08:52 10 August 2015WITHDRAWN:10:00 02 October 2015 |
Application to Amend | 498229 | Lodged:10:28:59 08 December 2016Amending:NameFrom:PHOSPHATE AUSTRALIA LIMITEDTo:POZ MINERALS LIMITEDRECORDED:10:28:59 08 December 2016 |
Application to Amend | 507123 | Lodged:10:12:32 29 May 2017Amending:Address (Including DTC Details)From:Principal Place of Business : POZ MINERALS LIMITED, SAME AS CORRESPONDENCE and DTC :POZ MINERALS LIMITED, C/- AUSTWIDE MINING TITLE MANAGEMENT PTY LTD, PO BOX 1434, WANGARA, WA, 6947To:Principal Place of Business : POZ MINERALS LIMITED, C/- AUSTWIDE MINING TITLE MANAGEMENT PTY LTD, PO BOX 1434, WANGARA, WA, 6947, xxxxxxxxx@austwidemining.com.au, xxxxxxxxx400 and DTC :POZ MINERALS LIMITED, AUSTWIDE MINING TITLE MANAGEMENT PTY LTD, C/- AUSTWIDE MINING TITLE MANAGEMENT PTY LTD, PO BOX 1434, WANGARA, WA, 6947, xxxxxxxxx@austwidemining.com.au, xxxxxxxxx400RECORDED:10:12:32 29 May 2017 |
Application to Amend | 544204 | Lodged:11:46:43 07 December 2018Amending:NameFrom:POZ MINERALS LIMITEDTo:GIBB RIVER DIAMONDS LIMITEDRECORDED:11:46:43 07 December 2018 |
Surrender - Outright | 678274 | Lodged:09:50:56 12 June 2023REGISTERED:09:50:56 12 June 2023 |
Referred to Native Title Date | Referral Type | Current Status | Procedure | Details | Objections | Water Comments | Determination Areas | Claims | Representative Area Bodies |
13-Oct-2015 | Tenement Application | RTN Procedure : Right to Negotiate Cleared - Grant | RTN Procedure | 34 BL17300S124420E116km E'ly of Derby2017-06-22 | | | | Bunuba #2 Part B(WC2012/004)WC2012/004WAD94/2012falseDeterminedSection 31 Neg Activity - Finalised Warrwa Combined(WC2014/004)WC2014/004WAD33/2019falsePartially DeterminedSection 31 Neg Activity - Finalised
| 10KimberleyKimberley Land Council Aboriginal Corporation |
13-Oct-2015 | Tenement Application | Expedited Procedure : Expedited Does Not Apply | Expedited Procedure | 2015-11-042016-03-04FINALISED - Expedited Does Not Apply2017-05-0834 BL17300S124420E116km E'ly of Derby | WO2016/00362016-01-22WC2012/004Objection Upheld2017-05-05WO2016/01212016-03-04WC2012/004Objection Upheld2017-05-05 | | Bunuba People #2 Part A(WCD2015/009)WC2012/004WAD94/2012falseWCD2015/009BOTHNo | Bunuba #2 Part B(WC2012/004)WC2012/004WAD94/2012falseDeterminedWarrwa Combined(WC2014/004)WC2014/004WAD33/2019falsePartially Determined | 10KimberleyKimberley Land Council Aboriginal Corporation |