Extracted from MTO on 29-Jun-2025 01:12,
last changed 29-Jun-2025.
# | Ver | Text | Start | End |
1 | 1 | All disturbances to the surface of the land made as a result of exploration, including costeans, drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Mines and Petroleum (DMP). Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, DMP. | 13-Jun-2017 | |
2 | 1 | All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program. | 13-Jun-2017 | |
3 | 1 | Unless the written approval of the Environmental Officer, DMP is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations. | 13-Jun-2017 | |
4 | 1 | The Licensee notifying the holder of any underlying pastoral or grazing lease by telephone or in person, or by registered post if contact cannot be made, prior to undertaking airborne geophysical surveys or any ground disturbing activities utilising equipment such as scrapers, graders, bulldozers, backhoes, drilling rigs; water carting equipment or other mechanised equipment. | 13-Jun-2017 | |
5 | 1 | The Licensee or transferee, as the case may be, shall within thirty (30) days of receiving written notification of:-- the grant of the Licence; or
- registration of a transfer introducing a new Licensee;
advise, by registered post, the holder of any underlying pastoral or grazing lease details of the grant or transfer. | 13-Jun-2017 | |
6 | 1 | In respect of the area covered by the licence the licensee, if so requested in writing by the Bunuba #2 the applicants in Federal Court application No. WAD94/2012 , such request being sent by pre-paid post to reach the licensee's address, not more than ninety days after the grant of this licence, shall within thirty days of the request execute in favour of the Bunuba #2 the Regional Standard Heritage Agreement ("RHSA") endorsed by peak industry groups (e.g. the South West/Ngaanyatjarra/Pilbara/Yamatji/Goldfields Land and Sea Council) and offered by the Native Title Party or their representative. | 13-Jun-2017 | |
Cond # | Ver | Text | Start | End |
1 | 1 | All disturbances to the surface of the land made as a result of exploration, including costeans, drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Mines and Petroleum (DMP). Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, DMP. | 13-Jun-2017 | |
2 | 1 | All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program. | 13-Jun-2017 | |
3 | 1 | Unless the written approval of the Environmental Officer, DMP is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations. | 13-Jun-2017 | |
4 | 1 | The Licensee notifying the holder of any underlying pastoral or grazing lease by telephone or in person, or by registered post if contact cannot be made, prior to undertaking airborne geophysical surveys or any ground disturbing activities utilising equipment such as scrapers, graders, bulldozers, backhoes, drilling rigs; water carting equipment or other mechanised equipment. | 13-Jun-2017 | |
5 | 1 | The Licensee or transferee, as the case may be, shall within thirty (30) days of receiving written notification of:-- the grant of the Licence; or
- registration of a transfer introducing a new Licensee;
advise, by registered post, the holder of any underlying pastoral or grazing lease details of the grant or transfer. | 13-Jun-2017 | |
6 | 1 | In respect of the area covered by the licence the licensee, if so requested in writing by the Bunuba #2 the applicants in Federal Court application No. WAD94/2012 , such request being sent by pre-paid post to reach the licensee's address, not more than ninety days after the grant of this licence, shall within thirty days of the request execute in favour of the Bunuba #2 the Regional Standard Heritage Agreement ("RHSA") endorsed by peak industry groups (e.g. the South West/Ngaanyatjarra/Pilbara/Yamatji/Goldfields Land and Sea Council) and offered by the Native Title Party or their representative. | 13-Jun-2017 | |
Type | Number | Details |
Application to Amend | 498229 | Lodged:10:28:59 08 December 2016Amending:NameFrom:PHOSPHATE AUSTRALIA LIMITEDTo:POZ MINERALS LIMITEDRECORDED:10:28:59 08 December 2016 |
Application to Amend | 507123 | Lodged:10:12:32 29 May 2017Amending:Address (Including DTC Details)From:Principal Place of Business : POZ MINERALS LIMITED, SAME AS CORRESPONDENCE and DTC :POZ MINERALS LIMITED, C/- AUSTWIDE MINING TITLE MANAGEMENT PTY LTD, PO BOX 1434, WANGARA, WA, 6947To:Principal Place of Business : POZ MINERALS LIMITED, C/- AUSTWIDE MINING TITLE MANAGEMENT PTY LTD, PO BOX 1434, WANGARA, WA, 6947, xxxxxxxxx@austwidemining.com.au, xxxxxxxxx400 and DTC :POZ MINERALS LIMITED, AUSTWIDE MINING TITLE MANAGEMENT PTY LTD, C/- AUSTWIDE MINING TITLE MANAGEMENT PTY LTD, PO BOX 1434, WANGARA, WA, 6947, xxxxxxxxx@austwidemining.com.au, xxxxxxxxx400RECORDED:10:12:32 29 May 2017 |
Application to Amend | 544204 | Lodged:11:46:43 07 December 2018Amending:NameFrom:POZ MINERALS LIMITEDTo:GIBB RIVER DIAMONDS LIMITEDRECORDED:11:46:43 07 December 2018 |
Excess Tonnage | 544960 | Lodged:11:45:42 18 December 2018RECORDED:11:45:42 18 December 2018REFUSED:16:14:03 29 January 2019 |
Extension / Renewal of Term | 651268 | Lodged:14:24:31 10 June 2022Applied For Period:5 YearsRECORDED:14:24:31 10 June 2022GRANTED:12 August 2022Granted Period:5 YearsTerm Extended To:12/06/2027 |
Surrender - Outright | 678275 | Lodged:09:50:56 12 June 2023REGISTERED:09:50:56 12 June 2023 |