Extracted from MTO on 06-Jul-2025 01:19,
last changed 26-Jun-2025.
# | Ver | Text | Start | End |
1 | 1 | All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program. | 16-Mar-2016 | |
2 | 1 | Unless the written approval of the Environmental Officer, DMP is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations. | 16-Mar-2016 | |
3 | 1 | The Licensee notifying the holder of any underlying pastoral or grazing lease by telephone or in person, or by registered post if contact cannot be made, prior to undertaking airborne geophysical surveys or any ground disturbing activities utilising equipment such as scrapers, graders, bulldozers, backhoes, drilling rigs; water carting equipment or other mechanised equipment. | 16-Mar-2016 | |
4 | 1 | The Licensee or transferee, as the case may be, shall within thirty (30) days of receiving written notification of:-- the grant of the Licence; or
- registration of a transfer introducing a new Licensee;
advise, by registered post, the holder of any underlying pastoral or grazing lease details of the grant or transfer. | 16-Mar-2016 | |
5 | 1 | No interference with Geodetic Survey Station SSM-H 64 and mining within 15 metres thereof being confined to below a depth of 15 metres from the natural surface. | 16-Mar-2016 | |
6 | 1 | No interference with the use of the Aerial Landing Ground and mining thereon being confined to below a depth of 15 metres from the natural surface. | 16-Mar-2016 | |
7 | 1 | All disturbances to the surface of the land made as a result of exploration, including costeans, drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Mines, Industry Regulation and Safety. Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, Department of Mines, Industry Regulation and Safety. | 30-May-2022 | |
Cond # | Ver | Text | Start | End |
1 | 1 | All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program. | 16-Mar-2016 | |
2 | 1 | Unless the written approval of the Environmental Officer, DMP is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations. | 16-Mar-2016 | |
3 | 1 | The Licensee notifying the holder of any underlying pastoral or grazing lease by telephone or in person, or by registered post if contact cannot be made, prior to undertaking airborne geophysical surveys or any ground disturbing activities utilising equipment such as scrapers, graders, bulldozers, backhoes, drilling rigs; water carting equipment or other mechanised equipment. | 16-Mar-2016 | |
4 | 1 | The Licensee or transferee, as the case may be, shall within thirty (30) days of receiving written notification of:-- the grant of the Licence; or
- registration of a transfer introducing a new Licensee;
advise, by registered post, the holder of any underlying pastoral or grazing lease details of the grant or transfer. | 16-Mar-2016 | |
5 | 1 | No interference with Geodetic Survey Station SSM-H 64 and mining within 15 metres thereof being confined to below a depth of 15 metres from the natural surface. | 16-Mar-2016 | |
6 | 1 | No interference with the use of the Aerial Landing Ground and mining thereon being confined to below a depth of 15 metres from the natural surface. | 16-Mar-2016 | |
7 | 1 | All disturbances to the surface of the land made as a result of exploration, including costeans, drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Mines, Industry Regulation and Safety. Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, Department of Mines, Industry Regulation and Safety. | 30-May-2022 | |
Type | Number | Details |
Application to Amend | 486600 | Lodged:14:40 11 May 2016Amending:Address (Including DTC Details)From:BUXTON RESOURCES LTD, C/- WESTERN TENEMENT SERVICES, PO BOX 428, GREENWOOD, WA, 6924To:BUXTON RESOURCES LTD, C/- WESTERN TENEMENT SERVICES, PO BOX 3285, EAST PERTH, WA, 6892RECORDED:14:40 11 May 2016 |
Application to Amend | 487703 | Lodged:12:36 01 June 2016Amending:Address (Including DTC Details)From:BUXTON RESOURCES LTD, C/- WESTERN TENEMENT SERVICES, PO BOX 3285, EAST PERTH, WA, 6892To:BUXTON RESOURCES LTD, C/- M & M WALTER CONSULTING, PO BOX 8197, SUBIACO EAST, WA, 6008RECORDED:12:36 01 June 2016 |
Application to Amend | 545219 | Lodged:11:13:42 20 December 2018Amending:Address (Including DTC Details)From:BUXTON RESOURCES LTD, C/- M & M WALTER CONSULTING, PO BOX 8197, SUBIACO EAST, WA, 6008To:BUXTON RESOURCES LTD, C/-INDEPENDENCE GROUP NL, PO BOX 496, SOUTH PERTH, WA, 6951, xxxxxxxxxxxxxxxxx@Igo.com.au, xxxxx352RECORDED:11:13:42 20 December 2018 |
Extension / Renewal of Term | 616842 | Lodged:12:15:57 02 March 2021Applied For Period:5 YearsRECORDED:12:15:57 02 March 2021GRANTED:14 May 2021Granted Period:5 YearsTerm Extended To:15/03/2026 |
Application to Amend | 621223 | Lodged:12:42:22 27 April 2021Amending:Address (Including DTC Details)From:BUXTON RESOURCES LTD, C/-INDEPENDENCE GROUP NL, PO BOX 496, SOUTH PERTH, WA, 6951, xxxxxxxxxxxxxxxxx@igo.com.au, xxxxx352To:BUXTON RESOURCES LTD, C/- IGO LIMITED, PO BOX 496, SOUTH PERTH, WA, 6951, xxxxxxxxxxxxxxxxx@igo.com.au, xxxxx352RECORDED:12:42:22 27 April 2021 |
Partial Surrender - Voluntary | 641909 | Lodged:15:34:31 21 February 2022Surrendered Blocks:BROOME 1215 t, u, y
BROOME 1216 q
BROOME 1287 o, t, u
BROOME 1288 q, v, w
BROOME 1289 t, z
BROOME 1360 a, b, c, h, j, k, p
BROOME 1361 l, m, r, s, t, u
BROOME 1362 h, q
BROOME 1363 m, q, r, s, t, x, y, z
BROOME 1435 e
BROOME 1436 g, h, j
BROOME 1437 b, gSurrendered Total:41 BL.REGISTERED:15:34:31 21 February 2022 |
Application to Amend | 681275 | Lodged:10:08:35 18 July 2023Amending:Address (Including DTC Details)From:Principal Place of Business : BUXTON RESOURCES LTD, ADDRESS NOT PROVIDED and DTC :BUXTON RESOURCES LTD, C/- IGO LIMITED, PO BOX 496, SOUTH PERTH, WA, 6951, xxxxxxxxxxxxxxxxx@igo.com.au, xxxxx352To:Principal Place of Business : BUXTON RESOURCES LTD, C/- MCMAHON MINING TITLE SERVICES PTY LTD, PO BOX 6301, EAST PERTH, WA, 6892, xxxx@mmts.net.au, xxxxxxxxxxx997 and DTC :BUXTON RESOURCES LTD, MCMAHON MINING TITLE SERVICES PTY LTD, C/- MCMAHON MINING TITLE SERVICES PTY LTD, PO BOX 6301, EAST PERTH, WA, 6892, xxxx@mmts.net.au, xxxxxxxxxxx997RECORDED:10:08:35 18 July 2023 |
Application to Amend | 693771 | Lodged:09:36 10 January 2024Amending:Address (Including DTC Details)From:Principal Place of Business : IGO NEWSEARCH PTY LTD, PO BOX 496, SOUTH PERTH, WA, 6951 and DTC :IGO NEWSEARCH PTY LTD, PO BOX 496, SOUTH PERTH, WA, 6951To:Principal Place of Business : IGO NEWSEARCH PTY LTD, C/- MCMAHON MINING TITLE SERVICES PTY LTD, PO BOX 6301, EAST PERTH, WA, 6892, xxxx@MMTS.NET.AU, xxxxxxxxxxx997 and DTC :IGO NEWSEARCH PTY LTD, MCMAHON MINING TITLE SERVICES PTY LTD, C/- MCMAHON MINING TITLE SERVICES PTY LTD, PO BOX 6301, EAST PERTH, WA, 6892, xxxx@mmts.net.au, xxxxxxxxxxx997RECORDED:09:36 10 January 2024 |