Extracted from MTO on 04-Jul-2025 01:14,
last changed 04-Jul-2025.
# | Ver | Text | Start | End |
1 | 1 | All disturbances to the surface of the land made as a result of exploration, including costeans, drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Mines and Petroleum (DMP). Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, DMP. | 24-Mar-2017 | |
2 | 1 | All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program. | 24-Mar-2017 | |
3 | 1 | Unless the written approval of the Environmental Officer, DMP is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations. | 24-Mar-2017 | |
4 | 1 | The Licensee notifying the holder of any underlying pastoral or grazing lease by telephone or in person, or by registered post if contact cannot be made, prior to undertaking airborne geophysical surveys or any ground disturbing activities utilising equipment such as scrapers, graders, bulldozers, backhoes, drilling rigs; water carting equipment or other mechanised equipment. | 24-Mar-2017 | |
5 | 1 | The Licensee or transferee, as the case may be, shall within thirty (30) days of receiving written notification of:-- the grant of the Licence; or
- registration of a transfer introducing a new Licensee;
advise, by registered post, the holder of any underlying pastoral or grazing lease details of the grant or transfer. | 24-Mar-2017 | |
6 | 1 | No interference with Geodetic Survey Station DERBY 19 and DERBY 20 and mining within 15 metres thereof being confined to below a depth of 15 metres from the natural surface. | 24-Mar-2017 | |
7 | 1 | Mining within a radius of 150 metres of any Australian Telecommunications Commission microwave repeater station being confined to below a depth of 60 metres from the natural surface. | 24-Mar-2017 | |
8 | 1 | No interference with the Australian Telecommunications Commission microwave repeater station ray-line. | 24-Mar-2017 | |
9 | 1 | No excavation, excepting shafts, approaching closer to the Great Northern Highway, Highway verge or the road reserve than a distance equal to twice the depth of the excavation and mining on the Great Northern Highway or Highway verge being confined to below a depth of 30 metres from the natural surface, and on any other road or road verge, to below a depth of 15 metres from the natural surface. | 24-Mar-2017 | |
10 | 1 | The prior written consent of the Minister responsible for the Mining Act 1978 being obtained before commencing any exploration activities on Watering Place Reserve 1511, Gravel Reserves 47654 and 47655, Microwave Translator Site Reserve 38710 and Water and Stopping Place Reserve 727. | 24-Mar-2017 | |
| 1 | Consent to explore on Kimberley De Grey Stock Route Reserve 9697 granted subject to: | 24-Mar-2017 | |
11 | 1 | No exploration activities being carried out on Kimberley De Grey Stock Route Reserve 9697 which restrict the use of the reserve. | 24-Mar-2017 | |
Cond # | Ver | Text | Start | End |
1 | 1 | All disturbances to the surface of the land made as a result of exploration, including costeans, drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Mines and Petroleum (DMP). Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, DMP. | 24-Mar-2017 | |
2 | 1 | All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program. | 24-Mar-2017 | |
3 | 1 | Unless the written approval of the Environmental Officer, DMP is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations. | 24-Mar-2017 | |
4 | 1 | The Licensee notifying the holder of any underlying pastoral or grazing lease by telephone or in person, or by registered post if contact cannot be made, prior to undertaking airborne geophysical surveys or any ground disturbing activities utilising equipment such as scrapers, graders, bulldozers, backhoes, drilling rigs; water carting equipment or other mechanised equipment. | 24-Mar-2017 | |
5 | 1 | The Licensee or transferee, as the case may be, shall within thirty (30) days of receiving written notification of:-- the grant of the Licence; or
- registration of a transfer introducing a new Licensee;
advise, by registered post, the holder of any underlying pastoral or grazing lease details of the grant or transfer. | 24-Mar-2017 | |
6 | 1 | No interference with Geodetic Survey Station DERBY 19 and DERBY 20 and mining within 15 metres thereof being confined to below a depth of 15 metres from the natural surface. | 24-Mar-2017 | |
7 | 1 | Mining within a radius of 150 metres of any Australian Telecommunications Commission microwave repeater station being confined to below a depth of 60 metres from the natural surface. | 24-Mar-2017 | |
8 | 1 | No interference with the Australian Telecommunications Commission microwave repeater station ray-line. | 24-Mar-2017 | |
9 | 1 | No excavation, excepting shafts, approaching closer to the Great Northern Highway, Highway verge or the road reserve than a distance equal to twice the depth of the excavation and mining on the Great Northern Highway or Highway verge being confined to below a depth of 30 metres from the natural surface, and on any other road or road verge, to below a depth of 15 metres from the natural surface. | 24-Mar-2017 | |
10 | 1 | The prior written consent of the Minister responsible for the Mining Act 1978 being obtained before commencing any exploration activities on Watering Place Reserve 1511, Gravel Reserves 47654 and 47655, Microwave Translator Site Reserve 38710 and Water and Stopping Place Reserve 727. | 24-Mar-2017 | |
| 1 | Consent to explore on Kimberley De Grey Stock Route Reserve 9697 granted subject to: | 24-Mar-2017 | |
11 | 1 | No exploration activities being carried out on Kimberley De Grey Stock Route Reserve 9697 which restrict the use of the reserve. | 24-Mar-2017 | |
Type | Number | Details |
Objection | 464803 | Lodged:13:15:14 30 March 2015Objectors:YAKKA MUNGA PASTORAL LEASEObjection Type:Tenement ApplicationRECORDED:13:15:14 30 March 2015WITHDRAWN:10:00 03 September 2015 |
Application to Amend | 486600 | Lodged:14:40 11 May 2016Amending:Address (Including DTC Details)From:SHEFFIELD RESOURCES LIMITED, C/- WESTERN TENEMENT SERVICES, PO BOX 428, GREENWOOD, WA, 6924To:SHEFFIELD RESOURCES LIMITED, C/- WESTERN TENEMENT SERVICES, PO BOX 3285, EAST PERTH, WA, 6892RECORDED:14:40 11 May 2016 |
Partial Surrender - Voluntary | 514409 | Lodged:14:33:28 12 September 2017Surrendered Blocks:BROOME 1480 h, j, k, n, o, p, s, t, u, x, y, z
BROOME 1481 f, g, h, j, k, l, m, n, o, p, q, r, s, t, u, v, w, x, y, z
BROOME 1482 f, l, q, v
BROOME 1551 k, p, u, x, y, z
BROOME 1552 b, c, d, e, f, g, h, j, k, l, m, n, o, p, q, r, s, t, u, v, w, x, y, z
BROOME 1553 a, b, c, d, f, g, h, l, m, q
BROOME 1623 c, d, e, h
BROOME 1624 a, bSurrendered Total:82 BL.REGISTERED:14:33:28 12 September 2017 |
Extension of Time | 530941 | Lodged:16:01:55 22 May 2018Type:Form 5RECORDED:16:01:55 22 May 2018APPROVED:16:15:30 23 May 2018Time to lodge extended to 06/06/2018 |
Extension of Time | 532061 | Lodged:16:10 05 June 2018Type:Exemption from ExpenditureRECORDED:16:10 05 June 2018APPROVED:11:17 08 June 2018 |
Extension of Time | 534516 | Lodged:15:27:09 06 July 2018Type:Stat DecRECORDED:15:27:09 06 July 2018APPROVED:09:30:31 09 July 2018Time to lodge extended to 20/07/2018 |
Extension of Time | 535582 | Lodged:16:27:13 20 July 2018Type:Stat DecRECORDED:16:27:13 20 July 2018APPROVED:10:34:39 23 July 2018Extended to 27/07/2018 |
Partial Surrender - Voluntary | 564466 | Lodged:11:51:46 10 October 2019Surrendered Blocks:BROOME 1407 c
BROOME 1408 q, v, w
BROOME 1479 o, p, t, u, x, y, z
BROOME 1480 a, b, f, g, l, m, q, r, v, w
BROOME 1550 d, e, j, k, n, o, p, r, s, t, u, z
BROOME 1551 a, b, c, d, e, f, g, h, j, l, m, n, o, q, r, s, t, v, w
BROOME 1552 a
BROOME 1622 e, k, p
BROOME 1623 a, b, f, g, lSurrendered Total:61 BL.REGISTERED:11:51:46 10 October 2019 |
Surrender - Outright | 572438 | Lodged:09:43:22 18 February 2020REGISTERED:09:43:22 18 February 2020 |