Tenement: E04-2398

View on Landtracker Maps (logon required)

Extracted from MTO on 06-Jul-2025 00:37, last changed 26-Jun-2025.

Tenement Summary

Identifier:E 04/2398Type:Exploration Licence
Status:LiveDistrict:WEST KIMBERLEY M.F.
Lodged:ONLINEArea:21 BL
Purposes:Term:5 Years (Extended)
Markout:Received:24-Feb-2015 15:04
Commence:22-Mar-2016 Expiry:21-Mar-2026

Holders

Company NameSharesTotal Shares
INDIA BORE DIAMOND HOLDINGS PTY LTD100100

Applicants on Receival

Company NameSharesTotal Shares
PJMD PTY LTD100100

Relationships

Relationship TypeDealingDealing StatusTenementTenement Status
Section 67Conversion 540002FinalisedM 04/473Live

Shires

Shire NameShire NumberStartArea
DERBY-WEST KIMBERLEY SHIRE280024-Feb-2015 21.00000 BL

Conditions

#VerTextStartEnd
11All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program.22-Mar-2016
21Unless the written approval of the Environmental Officer, DMP is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations.22-Mar-2016
31The Licensee notifying the holder of any underlying pastoral or grazing lease by telephone or in person, or by registered post if contact cannot be made, prior to undertaking airborne geophysical surveys or any ground disturbing activities utilising equipment such as scrapers, graders, bulldozers, backhoes, drilling rigs; water carting equipment or other mechanised equipment.22-Mar-2016
41The Licensee or transferee, as the case may be, shall within thirty (30) days of receiving written notification of:-
  • the grant of the Licence; or
  • registration of a transfer introducing a new Licensee;
advise, by registered post, the holder of any underlying pastoral or grazing lease details of the grant or transfer.
22-Mar-2016
51No interference with the use of the Aerial Landing Ground and mining thereon being confined to below a depth of 15 metres from the natural surface.22-Mar-2016
1Consent to explore on Stock Route Reserve 12475 granted subject to:22-Mar-2016
61No exploration activities being carried out on Stock Route Reserve 12475 which restrict the use of the reserve.22-Mar-2016
71Exploration being carried out in such a manner so as to create the minimum practicable disturbance to the existing vegetation and natural landform.26-Jun-2018
81All topsoil and vegetation being removed ahead of all exploration operations and being stockpiled appropriately for later respreading or immediately respread as rehabilitation progresses.26-Jun-2018
91All disturbances to the surface of the land made as a result of exploration, including costeans, drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, DMIRS. Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, DMIRS.26-Jun-2018
102The Licensee submitting to the Environmental Officer, Department of Mines, Industry Regulation and Safety, an annual report outlining:
  • exploration works undertaken in the previous 12 months;
  • rehabilitation work undertaken in the previous 12 months;
  • tonnage disturbed in the previous 12 months; and
  • brief detail of the proposed operations and rehabilitation plans for the next 12 months
This report is to be submitted each year in July.
04-May-2020
101The Licensee submitting to the Environmental Officer, Department of Mines, Industry Regulation and Safety, an annual report outlining:
  • exploration works undertaken in the previous 12 months;
  • rehabilitation work undertaken in the previous 12 months;
  • tonnage disturbed in the previous 12 months; and
  • brief detail of the proposed operations and rehabilitation plans for the next 12 months
This report is to be submitted each year in January.
17-Oct-2018 03-May-2020
111Rehabilitation of all trenches, excavations or pits is to be completed progressively within 6 months of reaching terminal depth.  Approval must be obtained from an Environmental Officer, Department of Mines, Industry Regulation and Safety should any excavation be required to remain open longer 6 months.17-Oct-2018
121The construction and operation of the project and measures to protect the environment to be carried out in accordance with the document titled:
  • (PoW Reg ID 77235)  "Programme of Work on E04/2398 for India Bore Diamond Holdings Pty Ltd" (Reg ID 77235) dated 28 November 2018 submitted by Grant Donnes and Document titled "Supporting Information for 2nd Exploration Trench - Application on E04/2398" both retained on Department of Mines, Industry Regulation and Safety File No. EARS-POW-77235 as Doc ID 6180556 and 6180554                                   
Where a difference exists between the above document(s) and the following conditions, then the following conditions shall prevail.
05-Dec-2018
131All exploration activities must be conducted in accordance with the 'Impact Mitigation Measures' (including both Protection of Conservation Significant Flora and Fauna and Habitat Protection) detailed within Appendix 1 (Flora and Fauna Report, 2018 Desktop Flora and Fauna Study, India Bore Diamond Holdings West Kimberley Diamond Exploration Project) of the "Supporting Information for 2nd Exploration Trench - Application on E04/2398" retained on Department of Mines, Industry Regulation and Safety File No. EARS-POW-77235 as Doc ID 6180554.05-Dec-2018

Endorsements

Cond #VerTextStartEnd
11All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program.22-Mar-2016
21Unless the written approval of the Environmental Officer, DMP is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations.22-Mar-2016
31The Licensee notifying the holder of any underlying pastoral or grazing lease by telephone or in person, or by registered post if contact cannot be made, prior to undertaking airborne geophysical surveys or any ground disturbing activities utilising equipment such as scrapers, graders, bulldozers, backhoes, drilling rigs; water carting equipment or other mechanised equipment.22-Mar-2016
41The Licensee or transferee, as the case may be, shall within thirty (30) days of receiving written notification of:-
  • the grant of the Licence; or
  • registration of a transfer introducing a new Licensee;
advise, by registered post, the holder of any underlying pastoral or grazing lease details of the grant or transfer.
22-Mar-2016
51No interference with the use of the Aerial Landing Ground and mining thereon being confined to below a depth of 15 metres from the natural surface.22-Mar-2016
1Consent to explore on Stock Route Reserve 12475 granted subject to:22-Mar-2016
61No exploration activities being carried out on Stock Route Reserve 12475 which restrict the use of the reserve.22-Mar-2016
71Exploration being carried out in such a manner so as to create the minimum practicable disturbance to the existing vegetation and natural landform.26-Jun-2018
81All topsoil and vegetation being removed ahead of all exploration operations and being stockpiled appropriately for later respreading or immediately respread as rehabilitation progresses.26-Jun-2018
91All disturbances to the surface of the land made as a result of exploration, including costeans, drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, DMIRS. Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, DMIRS.26-Jun-2018
102The Licensee submitting to the Environmental Officer, Department of Mines, Industry Regulation and Safety, an annual report outlining:
  • exploration works undertaken in the previous 12 months;
  • rehabilitation work undertaken in the previous 12 months;
  • tonnage disturbed in the previous 12 months; and
  • brief detail of the proposed operations and rehabilitation plans for the next 12 months
This report is to be submitted each year in July.
04-May-2020
101The Licensee submitting to the Environmental Officer, Department of Mines, Industry Regulation and Safety, an annual report outlining:
  • exploration works undertaken in the previous 12 months;
  • rehabilitation work undertaken in the previous 12 months;
  • tonnage disturbed in the previous 12 months; and
  • brief detail of the proposed operations and rehabilitation plans for the next 12 months
This report is to be submitted each year in January.
17-Oct-2018 03-May-2020
111Rehabilitation of all trenches, excavations or pits is to be completed progressively within 6 months of reaching terminal depth.  Approval must be obtained from an Environmental Officer, Department of Mines, Industry Regulation and Safety should any excavation be required to remain open longer 6 months.17-Oct-2018
121The construction and operation of the project and measures to protect the environment to be carried out in accordance with the document titled:
  • (PoW Reg ID 77235)  "Programme of Work on E04/2398 for India Bore Diamond Holdings Pty Ltd" (Reg ID 77235) dated 28 November 2018 submitted by Grant Donnes and Document titled "Supporting Information for 2nd Exploration Trench - Application on E04/2398" both retained on Department of Mines, Industry Regulation and Safety File No. EARS-POW-77235 as Doc ID 6180556 and 6180554                                   
Where a difference exists between the above document(s) and the following conditions, then the following conditions shall prevail.
05-Dec-2018
131All exploration activities must be conducted in accordance with the 'Impact Mitigation Measures' (including both Protection of Conservation Significant Flora and Fauna and Habitat Protection) detailed within Appendix 1 (Flora and Fauna Report, 2018 Desktop Flora and Fauna Study, India Bore Diamond Holdings West Kimberley Diamond Exploration Project) of the "Supporting Information for 2nd Exploration Trench - Application on E04/2398" retained on Department of Mines, Industry Regulation and Safety File No. EARS-POW-77235 as Doc ID 6180554.05-Dec-2018

Dealings

TypeNumberDetails
Application to Amend478772Lodged:13:31:14 10 December 2015Amending:NameFrom:PJMD PTY LTDTo:INDIA BORE DIAMOND HOLDINGS PTY LTDRECORDED:13:31:14 10 December 2015
Excess Tonnage509541Lodged:11:00 28 June 2017RECORDED:11:00 28 June 2017GRANTED:12:25:58 03 July 2017Additional 50,000 tonnes
Excess Tonnage537467Lodged:15:06 20 August 2018RECORDED:15:06 20 August 2018GRANTED:15:30 23 August 2018Additional 100,000 tonnes
Conversion540002New Tenement:M 04/473Application Date:10:25 03 Oct 2018Section:S67Converted 00:00 16 March 2021 being commencement of term of M 04/473Retained Blocks:BROOME 1499 d, e, g, h, j, k, l, m, n, o, p, q, r, s, u, v, w, x, y, z BROOME 1500 f, l, m, q BROOME 1570 p BROOME 1571 a, b, c, d, f, g, h, j, l, mRetained Total:35
Excess Tonnage540939Lodged:09:46 19 October 2018RECORDED:09:46 19 October 2018GRANTED:14:12:21 24 October 2018Additional 350,000 tonnes
Extension of Time554147Lodged:13:14:11 20 May 2019Type:Form 5RECORDED:13:14:11 20 May 2019APPROVED:15:29:40 21 May 2019Time extended until 5 June 2019 for year ending 2019.
Extension of Time578235Lodged:09:49:52 19 May 2020Type:Form 5RECORDED:09:49:52 19 May 2020APPROVED:11:44:11 19 May 2020Time to lodge extended to 12 June 2020
Extension / Renewal of Term616664Lodged:16:21:29 25 February 2021Applied For Period:5 YearsRECORDED:16:21:29 25 February 2021GRANTED:23 March 2021Granted Period:5 YearsTerm Extended To:21/03/2026
Partial Surrender - Compulsory644814Lodged:11:29:54 16 March 2022Section:Section 65 (3)Surrendered Blocks:BROOME 1499 l, q, r, v, w BROOME 1570 p BROOME 1571 a, b, f, g, h, j, l, mSurrendered Total:14 BL.REGISTERED:Midnight 21 March 2022Surrendered area to be released 08:30:00 13/04/2022 under Section 65 (3)Surrendered area released 08:30:00 13/04/2022 under Section 65 (3)

Payments

TypeYearReceipt DateReceipt No.MR LodgedAmountRental AreaEffective DateAmt DueDiscrepancy
Rental202621-Mar-2025 10784392$16,464.0021 BL21-Mar-2022 $16,464.00$0.00
Rental202511-Apr-2024 10543844$15,687.0021 BL21-Mar-2022 $15,687.00$0.00
Rental202417-Apr-2023 10348832$14,931.0021 BL21-Mar-2022 $14,931.00$0.00
Rental202312-Apr-2022 10256023$7,518.0021 BL21-Mar-2022 $7,518.00$0.00
Rental202223-Mar-2021 (REFUND) FIL-24067$325.0035 BL16-Mar-2021 $11,375.00$0.00
Rental202222-Feb-2021 10184492$11,700.00
Rental202123-Mar-2020 10138165$8,388.0036 BL22-Mar-2016 $8,388.00$0.00
Rental202010-Apr-2019 10091979$7,920.0036 BL22-Mar-2016 $7,920.00$0.00
Rental201902-Mar-2018 5448783885 INDIA BORE$4,824.0036 BL22-Mar-2016 $4,824.00$0.00
Rental201820-Apr-2017 06-159976PERTH$4,662.0036 BL22-Mar-2016 $4,662.00$0.00
Rental201724-Feb-2015 505518621483$4,395.6036 BL22-Mar-2016 $4,395.60$0.00

Expenditure

YearForm 5 TypeMin ExpdExp Lodged DateTotal ExpdExemp NoExemp LodgedExemp AmtExemp StatusOutcome DateExploration ActivitiesMining ActivitiesAboriginal SurveyRentAdministrationProspectingStrike Through
2026$70,000.00false
2025$70,000.0016-May-2025 $123,813.32$97,900.00$0.00$0.00$16,413.32$9,500.00$0.00false
2024$70,000.0015-May-2024 $137,847.97$114,320.10$0.00$0.00$15,601.46$7,926.41$0.00false
2023$50,000.0019-May-2023 $175,985.00$156,550.00$0.00$0.00$8,035.00$11,400.00$0.00false
2022$70,000.0004-May-2022 $73,139.00$53,620.00$0.00$0.00$12,279.00$7,240.00$0.00false
2021$54,000.0020-Apr-2021 $1,242,338.00$216,200.00$915,250.00$0.00$9,888.00$101,000.00$0.00false
2020$54,000.0002-Jun-2020 $1,863,985.00$1,675,830.00$0.00$0.00$11,155.00$177,000.00$0.00false
2019$36,000.0029-May-2019 $2,125,390.00$1,765,315.00$0.00$32,234.00$8,059.00$319,782.00$0.00false
2018$36,000.0018-May-2018 $1,947,420.00$1,746,577.00$0.00$43,110.00$7,744.00$149,989.00$0.00false
2017$36,000.0010-May-2017 $145,309.30$114,323.30$0.00$0.00$8,121.34$22,864.66$0.00false

Native Title Referrals

Referred to Native Title DateReferral TypeCurrent StatusProcedureDetailsObjectionsWater CommentsDetermination AreasClaimsRepresentative Area Bodies
05-May-2015 Tenement ApplicationExpedited Procedure : Native Title Cleared - Expedited AppliesExpedited Procedure2015-05-202015-09-20CLEARED - Expedited Applies2016-03-1636 BL17440S124530E90km NW'ly of Fitzroy CrossingWO2015/07732015-09-21WC2012/004Objection Withdrawn Agreement2016-03-16BUNUBA(WCD2012/006)WC1999/019WAD6133/1998falseWCD2012/006BOTHNoBunuba #2 Part B(WC2012/004)WC2012/004WAD94/2012falseDeterminedBunuba(WC1999/019)WC1999/019WAD6133/1998falseDetermined10KimberleyKimberley Land Council Aboriginal Corporation