Extracted from MTO on 01-Jul-2025 00:18,
last changed 26-Jun-2025.
# | Ver | Text | Start | End |
1 | 2 | Exploration and prospecting disturbances, excluding supporting infrastructure, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Energy, Mines, Industry Regulation and Safety. Backfilling and rehabilitation being required no later than 12 months after completion of the activity unless otherwise approved in writing by the Environmental Officer, Department of Energy, Mines, Industry Regulation and Safety. | 16-Jun-2025 | |
1 | 1 | All disturbances to the surface of the land made as a result of exploration, including costeans, drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, DMIRS. Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, DMIRS. | 15-Aug-2018 | 15-Jun-2025 |
2 | 1 | All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program. | 15-Aug-2018 | |
3 | 1 | Unless the written approval of the Environmental Officer, DMIRS is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations. | 15-Aug-2018 | |
4 | 1 | The Licensee notifying the holder of any underlying pastoral or grazing lease by telephone or in person, or by registered post if contact cannot be made, prior to undertaking airborne geophysical surveys or any ground disturbing activities utilising equipment such as scrapers, graders, bulldozers, backhoes, drilling rigs; water carting equipment or other mechanised equipment. | 15-Aug-2018 | |
5 | 1 | The Licensee or transferee, as the case may be, shall within thirty (30) days of receiving written notification of:-- the grant of the Licence; or
- registration of a transfer introducing a new Licensee;
advise, by registered post, the holder of any underlying pastoral or grazing lease details of the grant or transfer. | 15-Aug-2018 | |
6 | 1 | No interference with Geodetic Survey Station L-1 and mining within 15 metres thereof being confined to below a depth of 15 metres from the natural surface. | 15-Aug-2018 | |
| 1 | Consent to explore on Meda Location 15 (Yampi Defence Training Area) granted subject to: | 15-Aug-2018 | |
7 | 1 | The Australian Government not guaranteeing access to the Commonwealth Land. | 15-Aug-2018 | |
8 | 1 | The licensee obtaining the relevant approvals required under the Land Acquisitions Act 1989 (Cth). | 15-Aug-2018 | |
9 | 1 | If deed of access is granted, exploration activities being limited to those specified in the deed. | 15-Aug-2018 | |
10 | 1 | Any proposed future mining activities, being subject to separate approval required under the Lands Acquisition Act 1989 (Cth). | 15-Aug-2018 | |
11 | 1 | All supporting infrastructure for exploration and prospecting including core yards, laydowns, camps, and access tracks (excluding drill lines), being rehabilitated to the satisfaction of the Environmental Officer, Department of Energy, Mines, Industry Regulation and Safety. Rehabilitation being required by the earlier of 12 months from the infrastructure being no longer required to support exploration, or 12 months from the relevant programme of work expiring, unless otherwise approved in writing by the Environmental Officer, Department of Energy, Mines, Industry Regulation and Safety. | 16-Jun-2025 | |
12 | 1 | The tenement holder must maintain appropriate records of exploration/prospecting activities, and associated rehabilitation undertaken, in order to demonstrate compliance with all conditions and environmental management and rehabilitation practice commitments. These records to be made available to the Department upon request. | 16-Jun-2025 | |
13 | 1 | All exploration and prospecting operations to comply with the environmental management and rehabilitation practice commitments provided in the approved programme of work. | 16-Jun-2025 | |
Cond # | Ver | Text | Start | End |
1 | 2 | Exploration and prospecting disturbances, excluding supporting infrastructure, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Energy, Mines, Industry Regulation and Safety. Backfilling and rehabilitation being required no later than 12 months after completion of the activity unless otherwise approved in writing by the Environmental Officer, Department of Energy, Mines, Industry Regulation and Safety. | 16-Jun-2025 | |
1 | 1 | All disturbances to the surface of the land made as a result of exploration, including costeans, drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, DMIRS. Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, DMIRS. | 15-Aug-2018 | 15-Jun-2025 |
2 | 1 | All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program. | 15-Aug-2018 | |
3 | 1 | Unless the written approval of the Environmental Officer, DMIRS is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations. | 15-Aug-2018 | |
4 | 1 | The Licensee notifying the holder of any underlying pastoral or grazing lease by telephone or in person, or by registered post if contact cannot be made, prior to undertaking airborne geophysical surveys or any ground disturbing activities utilising equipment such as scrapers, graders, bulldozers, backhoes, drilling rigs; water carting equipment or other mechanised equipment. | 15-Aug-2018 | |
5 | 1 | The Licensee or transferee, as the case may be, shall within thirty (30) days of receiving written notification of:-- the grant of the Licence; or
- registration of a transfer introducing a new Licensee;
advise, by registered post, the holder of any underlying pastoral or grazing lease details of the grant or transfer. | 15-Aug-2018 | |
6 | 1 | No interference with Geodetic Survey Station L-1 and mining within 15 metres thereof being confined to below a depth of 15 metres from the natural surface. | 15-Aug-2018 | |
| 1 | Consent to explore on Meda Location 15 (Yampi Defence Training Area) granted subject to: | 15-Aug-2018 | |
7 | 1 | The Australian Government not guaranteeing access to the Commonwealth Land. | 15-Aug-2018 | |
8 | 1 | The licensee obtaining the relevant approvals required under the Land Acquisitions Act 1989 (Cth). | 15-Aug-2018 | |
9 | 1 | If deed of access is granted, exploration activities being limited to those specified in the deed. | 15-Aug-2018 | |
10 | 1 | Any proposed future mining activities, being subject to separate approval required under the Lands Acquisition Act 1989 (Cth). | 15-Aug-2018 | |
11 | 1 | All supporting infrastructure for exploration and prospecting including core yards, laydowns, camps, and access tracks (excluding drill lines), being rehabilitated to the satisfaction of the Environmental Officer, Department of Energy, Mines, Industry Regulation and Safety. Rehabilitation being required by the earlier of 12 months from the infrastructure being no longer required to support exploration, or 12 months from the relevant programme of work expiring, unless otherwise approved in writing by the Environmental Officer, Department of Energy, Mines, Industry Regulation and Safety. | 16-Jun-2025 | |
12 | 1 | The tenement holder must maintain appropriate records of exploration/prospecting activities, and associated rehabilitation undertaken, in order to demonstrate compliance with all conditions and environmental management and rehabilitation practice commitments. These records to be made available to the Department upon request. | 16-Jun-2025 | |
13 | 1 | All exploration and prospecting operations to comply with the environmental management and rehabilitation practice commitments provided in the approved programme of work. | 16-Jun-2025 | |
Type | Number | Details |
Application to Amend | 426726 | Lodged:15:20 05 July 2013Amending: FORM 21 DESCRIPTION TO INCLUDE THE FOLLOWING "SUB-SURFACE RIGHTS APPLY IN RESPECT TO ALL PRIVATE PROPERTY"RECORDED:15:20 05 July 2013 |
Application to Amend | 430811 | Lodged:08:30 06 September 2013Amending:AddressFrom:STRATEGIC METALS PTY LTD, C/- WESTERN TENEMENT SERVICES PO BOX 428, GREENWOOD, WA, 6924To:STRATEGIC METALS PTY LTD, PO BOX 4455, MOSMAN PARK, WA, 6912RECORDED:08:30 06 September 2013 |
Caveat | 547688 | Lodged:13:24:30 13 February 2019Caveat Type:Absolute CaveatCaveator:NORTH WEST NICKEL PTY LTDShares Caveated:100/100 shares STRATEGIC METALS PTY LTDRECORDED:13:24:30 13 February 2019WITHDRAWN:15:13:45 24 October 2023 |
Extension / Renewal of Term | 683492 | Lodged:15:41:31 11 August 2023Applied For Period:5 YearsRECORDED:15:41:31 11 August 2023GRANTED:02 November 2023Granted Period:5 YearsTerm Extended To:14/08/2028 |
Application to Amend | 686030 | Lodged:15:55:05 14 September 2023Amending:Address (Including DTC Details)From:Principal Place of Business : STRATEGIC METALS PTY LTD, SAME AS CORRESPONDENCE and DTC :STRATEGIC METALS PTY LTD, PO BOX 4455, MOSMAN PARK, WA, 6912To:Principal Place of Business : STRATEGIC METALS PTY LTD, C/- WESTERN TENEMENT SERVICES, PO BOX 3285, EAST PERTH, WA, 6892, xxxxx@wts.net.au, xxxxxxx111 and DTC :STRATEGIC METALS PTY LTD, WESTERN TENEMENT SERVICES, C/- WESTERN TENEMENT SERVICES, PO BOX 3285, EAST PERTH, WA, 6892, xxxxx@wts.net.au, xxxxxxx111RECORDED:15:55:05 14 September 2023 |
Withdrawal of Dealing | 688538 | Lodged:15:13:45 24 October 2023In respect to:Caveat 547688RECORDED:15:13:45 24 October 2023 |
Partial Surrender - Compulsory | 712103 | Lodged:16:06:34 12 August 2024Section:Section 65 (3)Surrendered Blocks:BROOME 775 j, k, o, p, t, u, y, z
BROOME 776 f, g, h, l, m, n, o, p, q, r, s, t, u, v, w, x, y, z
BROOME 777 q, v
BROOME 849 e, k
BROOME 850 f, g, h, j, n, oSurrendered Total:36 BL.REGISTERED:Midnight 14 August 2024Surrendered area to be released 08:30:00 05/09/2024 under Section 65 (3)Surrendered area released 08:30:00 05/09/2024 under Section 65 (3) |