Tenement: E04-2315

View on Landtracker Maps (logon required)

Extracted from MTO on 04-Jul-2025 01:20, last changed 26-Jun-2025.

Tenement Summary

Identifier:E 04/2315Type:Exploration Licence
Status:LiveDistrict:WEST KIMBERLEY M.F.
Lodged:ONLINEArea:17 BL
Purposes:Term:5 Years (Extended)
Markout:Received:02-May-2013 12:22
Commence:28-Sep-2016 Expiry:27-Sep-2026

Holders

Company NameSharesTotal Shares
DREADNOUGHT EXPLORATION PTY LTD80100
WHITEWATER RESOURCES PTY LIMITED20100

Applicants on Receival

Company NameSharesTotal Shares
CLIFTON, Timothy Maxwell100100

Shires

Shire NameShire NumberStartArea
DERBY-WEST KIMBERLEY SHIRE280002-May-2013 17.00000 BL

Conditions

#VerTextStartEnd
11All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program.28-Sep-2016
21Unless the written approval of the Environmental Officer, DMP is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations.28-Sep-2016
1Consent to explore on Meda location 15 (Yampi Defence Training Area) granted subject to:28-Sep-2016
31The Australian Government not guaranteeing access to the Commonwealth land.28-Sep-2016
41The licensee obtaining the relevant approvals required under the Land Acquisitions Act 1989 (Cth).28-Sep-2016
51If deed of access is granted, exploration activities being limited to those specified in the deed.28-Sep-2016
61Any proposed future mining activities, being subject to seperate approval required under the Lands Acquisitions Act 1989 (Cth).28-Sep-2016
74The construction and operation of the project and measures to protect the environment to be carried out in accordance with the document titled:
  • (PoW Reg ID 99355) "Programme of Work on E04/2315 for Dreadnought Resources Ltd" dated 28 August 2021, submitted by Matthew Crowe and retained on Department of Mines, Industry Regulation and Safety File No. EARS-POW-99355 as Doc ID 8594196;
  • (PoW Reg ID 99355) - cover letter titled "Programme of Works Application on E04/2315" dated 6 December 2021, signed by Dean Tuck and retained on Department of Mines, Industry Regulation and Safety File No. EARS-POW-99355 as Doc ID 8853256;
  • Management Plan titled "Dreadnought Resources, Environmental Management Plan, Tarraji-Yampi Project" Version 1.6 dated 16 December 2021, approved for use by P Chapman and retained on Department of Mines, Industry Regulation and Safety File No. EARS-POW-99355 as Doc ID 8884091
Where a difference exists between the above document(s) and the following conditions, then the following conditions shall prevail.
05-Jan-2022
73The construction and operation of the project and measures to protect the environment to be carried out in accordance with the document titled:
  • (PoW Reg ID 99361) "Dreadnought Resources, Environmental Management Plan, Tarraji-Yampi Project, Version 1.5" dated 6 October 2021, approved for use by P Chapman and retained on Department of Mines, Industry Regulation and Safety File No. EARS-POW-99361 as Doc ID 8719028
Where a difference exists between the above document(s) and the following conditions, then the following conditions shall prevail.
26-Oct-2021 04-Jan-2022
72The construction and operation of the project and measures to protect the environment to be carried out in accordance with the document titled:
  • (PoW Reg ID 81569) "Dreadnought Resources Environmental Management Plan Tarraji-Yampi Project" Version 1.3, dated 2 August 2019 signed by P Chapman, and retained on Department of Mines, Industry Regulation and Safety File No. EARS-POW-81569 as Doc ID 6740848;
  • (PoW Reg ID 87726) "Dreadnought Resources Environmental Management Plan Tarraji-Yampi Project Version 1.4" dated 10 August 2020 submitted by Dean Tuck and retained on Department of Mines, Industry Regulation and Safety File No. EARS-POW-87726 as Doc ID 7613427
Where a difference exists between the above document(s) and the following conditions, then the following conditions shall prevail.
27-Aug-2020 25-Oct-2021
71The construction and operation of the project and measures to protect the environment to be carried out in accordance with the document titled:
  • (PoW Reg ID 81569) "Dreadnought Resources Environmental Management Plan Tarraji-Yampi Project" Version 1.3, dated 2 August 2019 signed by P Chapman, and retained on Department of Mines, Industry Regulation and Safety File No. EARS-POW-81569 as Doc ID 6740848                                    
Where a difference exists between the above document(s) and the following conditions, then the following conditions shall prevail.
23-Sep-2019 26-Aug-2020
81All disturbances to the surface of the land made as a result of exploration, including costeans, drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Mines, Industry Regulation and Safety. Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, Department of Mines, Industry Regulation and Safety.23-Sep-2019

Endorsements

Cond #VerTextStartEnd
11All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program.28-Sep-2016
21Unless the written approval of the Environmental Officer, DMP is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations.28-Sep-2016
1Consent to explore on Meda location 15 (Yampi Defence Training Area) granted subject to:28-Sep-2016
31The Australian Government not guaranteeing access to the Commonwealth land.28-Sep-2016
41The licensee obtaining the relevant approvals required under the Land Acquisitions Act 1989 (Cth).28-Sep-2016
51If deed of access is granted, exploration activities being limited to those specified in the deed.28-Sep-2016
61Any proposed future mining activities, being subject to seperate approval required under the Lands Acquisitions Act 1989 (Cth).28-Sep-2016
74The construction and operation of the project and measures to protect the environment to be carried out in accordance with the document titled:
  • (PoW Reg ID 99355) "Programme of Work on E04/2315 for Dreadnought Resources Ltd" dated 28 August 2021, submitted by Matthew Crowe and retained on Department of Mines, Industry Regulation and Safety File No. EARS-POW-99355 as Doc ID 8594196;
  • (PoW Reg ID 99355) - cover letter titled "Programme of Works Application on E04/2315" dated 6 December 2021, signed by Dean Tuck and retained on Department of Mines, Industry Regulation and Safety File No. EARS-POW-99355 as Doc ID 8853256;
  • Management Plan titled "Dreadnought Resources, Environmental Management Plan, Tarraji-Yampi Project" Version 1.6 dated 16 December 2021, approved for use by P Chapman and retained on Department of Mines, Industry Regulation and Safety File No. EARS-POW-99355 as Doc ID 8884091
Where a difference exists between the above document(s) and the following conditions, then the following conditions shall prevail.
05-Jan-2022
73The construction and operation of the project and measures to protect the environment to be carried out in accordance with the document titled:
  • (PoW Reg ID 99361) "Dreadnought Resources, Environmental Management Plan, Tarraji-Yampi Project, Version 1.5" dated 6 October 2021, approved for use by P Chapman and retained on Department of Mines, Industry Regulation and Safety File No. EARS-POW-99361 as Doc ID 8719028
Where a difference exists between the above document(s) and the following conditions, then the following conditions shall prevail.
26-Oct-2021 04-Jan-2022
72The construction and operation of the project and measures to protect the environment to be carried out in accordance with the document titled:
  • (PoW Reg ID 81569) "Dreadnought Resources Environmental Management Plan Tarraji-Yampi Project" Version 1.3, dated 2 August 2019 signed by P Chapman, and retained on Department of Mines, Industry Regulation and Safety File No. EARS-POW-81569 as Doc ID 6740848;
  • (PoW Reg ID 87726) "Dreadnought Resources Environmental Management Plan Tarraji-Yampi Project Version 1.4" dated 10 August 2020 submitted by Dean Tuck and retained on Department of Mines, Industry Regulation and Safety File No. EARS-POW-87726 as Doc ID 7613427
Where a difference exists between the above document(s) and the following conditions, then the following conditions shall prevail.
27-Aug-2020 25-Oct-2021
71The construction and operation of the project and measures to protect the environment to be carried out in accordance with the document titled:
  • (PoW Reg ID 81569) "Dreadnought Resources Environmental Management Plan Tarraji-Yampi Project" Version 1.3, dated 2 August 2019 signed by P Chapman, and retained on Department of Mines, Industry Regulation and Safety File No. EARS-POW-81569 as Doc ID 6740848                                    
Where a difference exists between the above document(s) and the following conditions, then the following conditions shall prevail.
23-Sep-2019 26-Aug-2020
81All disturbances to the surface of the land made as a result of exploration, including costeans, drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Mines, Industry Regulation and Safety. Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, Department of Mines, Industry Regulation and Safety.23-Sep-2019

Dealings

TypeNumberDetails
Application to Amend486600Lodged:14:40 11 May 2016Amending:Address (Including DTC Details)From:CLIFTON, Timothy Maxwell, C/- WESTERN TENEMENT SERVICES, PO BOX 428, GREENWOOD, WA, 6924To:CLIFTON, Timothy Maxwell, C/- WESTERN TENEMENT SERVICES, PO BOX 3285, EAST PERTH, WA, 6892RECORDED:14:40 11 May 2016
Application to Amend518338Lodged:09:55 14 November 2017Amending:Address (Including DTC Details)From:CLIFTON, Timothy Maxwell, C/- WESTERN TENEMENT SERVICES, PO BOX 3285, EAST PERTH, WA, 6892To:CLIFTON, Timothy Maxwell, C/- AUSTWIDE MINING TITLE MANAGEMENT PTY LTD, PO BOX 1434, WANGARA, WA, 6947RECORDED:09:55 14 November 2017
Application to Amend569873Lodged:14:25:47 08 January 2020Amending:Address (Including DTC Details)From:Principal Place of Business : WHITEWATER RESOURCES PTY LIMITED, C/- AUSTWIDE MINING TITLE MANAGEMENT PTY LTD, PO BOX 1434, WANGARA, WA, 6947, xxxxxxxxx@austwidemining.com.au, xxxxxxx400 and DTC :WHITEWATER RESOURCES PTY LIMITED, AUSTWIDE MINING TITLE MANAGEMENT PTY LTD, C/- AUSTWIDE MINING TITLE MANAGEMENT PTY LTD, PO BOX 1434, WANGARA, WA, 6947, xxxxxxxxx@austwidemining.com.au, xxxxxxx400To:Principal Place of Business : WHITEWATER RESOURCES PTY LIMITED, PO BOX 592, MAYLANDS, WA, 6931, xxxx@mmts.net.au, xxxxxxx997 and DTC :WHITEWATER RESOURCES PTY LIMITED, C/- MCMAHON MINING TITLE SERVICES PTY LTD, PO BOX 592, MAYLANDS, WA, 6931, xxxx@mmts.net.au, xxxxxxx997RECORDED:14:25:47 08 January 2020
Extension / Renewal of Term632519Lodged:10:17:09 17 September 2021Applied For Period:5 YearsRECORDED:10:17:09 17 September 2021GRANTED:27 October 2021Granted Period:5 YearsTerm Extended To:27/09/2026
Partial Surrender - Voluntary659473Lodged:15:53:22 23 September 2022Surrendered Blocks:BROOME 483 t, v, y BROOME 555 a, d, f, j, t, v, w, xSurrendered Total:11 BL.REGISTERED:15:53:22 23 September 2022
Application to Amend668602Lodged:13:36:15 09 February 2023Amending:Address (Including DTC Details)From:Principal Place of Business : WHITEWATER RESOURCES PTY LIMITED, PO BOX 592, MAYLANDS, WA, 6931, xxxx@mmts.net.au, xxxxxxx997 and DTC :WHITEWATER RESOURCES PTY LIMITED, C/- MCMAHON MINING TITLE SERVICES PTY LTD, PO BOX 592, MAYLANDS, WA, 6931, xxxx@mmts.net.au, xxxxxxx997To:Principal Place of Business : WHITEWATER RESOURCES PTY LIMITED, C/- MCMAHON MINING TITLE SERVICES PTY LTD, PO BOX 6301, EAST PERTH, WA, 6892, xxxx@mmts.net.au, xxxxxxxxxxx997 and DTC :WHITEWATER RESOURCES PTY LIMITED, MCMAHON MINING TITLE SERVICES PTY LTD, C/- MCMAHON MINING TITLE SERVICES PTY LTD, PO BOX 6301, EAST PERTH, WA, 6892, xxxx@mmts.net.au, xxxxxxxxxxx997RECORDED:13:36:15 09 February 2023

Payments

TypeYearReceipt DateReceipt No.MR LodgedAmountRental AreaEffective DateAmt DueDiscrepancy
Rental202530-Aug-2024 46538295502$13,328.0017 BL23-Sep-2022 $13,328.00$0.00
Rental202412-Sep-2023 36860256874$12,699.0017 BL23-Sep-2022 $12,699.00$0.00
Rental202305-Oct-2022 (REFUND) FIL-31090$4,136.0017 BL23-Sep-2022 $6,392.00$0.00
Rental202309-Sep-2022 26783571817$10,528.00
Rental202227-Aug-2021 16431299873$10,024.0028 BL28-Sep-2016 $10,024.00$0.00
Rental202114-Sep-2020 56948928012$6,664.0028 BL28-Sep-2016 $6,664.00$0.00
Rental202001-Oct-2019 10116772$6,524.0028 BL28-Sep-2016 $6,524.00$0.00
Rental201909-Oct-2018 (REFUND) FIL-2955$3,808.0028 BL28-Sep-2016 $3,808.00$0.00
Rental201909-Oct-2018 6444482357$3,808.00
Rental201910-Sep-2018 EFT$3,808.00
Rental201824-Oct-2017 77993174805$3,752.0028 BL28-Sep-2016 $3,752.00$0.00
Rental201702-May-2013 312214170388$3,267.6028 BL28-Sep-2016 $3,267.60$0.00

Expenditure

YearForm 5 TypeMin ExpdExp Lodged DateTotal ExpdExemp NoExemp LodgedExemp AmtExemp StatusOutcome DateExploration ActivitiesMining ActivitiesAboriginal SurveyRentAdministrationProspectingStrike Through
2025$70,000.00false
2024$70,000.0015-Nov-2024 $2,843,233.00$2,571,126.00$0.00$0.00$13,216.00$258,891.00$0.00false
2023$50,000.0009-Nov-2023 $1,212,823.00$1,074,683.00$0.00$18,712.00$7,192.00$112,236.00$0.00false
2022$56,000.0008-Nov-2022 $1,988,347.00$1,910,579.00$0.00$0.00$10,732.00$67,036.00$0.00false
2021$42,000.0012-Oct-2021 $959,305.00$945,549.00$0.00$0.00$7,849.00$5,907.00$0.00false
2020$42,000.0018-Nov-2020 $407,507.00$384,459.00$0.00$13,573.00$9,271.00$204.00$0.00false
2019$28,000.0026-Nov-2019 $260,774.00$211,808.00$0.00$20,075.00$6,329.00$22,562.00$0.00false
2018$28,000.0023-Nov-2018 $32,501.00$20,746.00$0.00$0.00$6,155.00$5,600.00$0.00false
2017Replacement$28,000.0021-Nov-2017 $28,944.00$18,355.00$0.00$0.00$4,989.00$5,600.00$0.00false
2017$28,000.0021-Nov-2017 $29,626.00$18,355.00$0.00$0.00$5,671.00$5,600.00$0.00true

Native Title Referrals

Referred to Native Title DateReferral TypeCurrent StatusProcedureDetailsObjectionsWater CommentsDetermination AreasClaimsRepresentative Area Bodies
Tenement ApplicationNative Title is Extinguished - Freehold Land