Extracted from MTO on 15-Jul-2025 01:31,
last changed 26-Jun-2025.
# | Ver | Text | Start | End |
1 | 1 | All disturbances to the surface of the land made as a result of exploration, including costeans, drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, DMIRS. Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, DMIRS. | 15-Aug-2018 | |
2 | 1 | All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program. | 15-Aug-2018 | |
3 | 1 | Unless the written approval of the Environmental Officer, DMIRS is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations. | 15-Aug-2018 | |
4 | 1 | The Licensee notifying the holder of any underlying pastoral or grazing lease by telephone or in person, or by registered post if contact cannot be made, prior to undertaking airborne geophysical surveys or any ground disturbing activities utilising equipment such as scrapers, graders, bulldozers, backhoes, drilling rigs; water carting equipment or other mechanised equipment. | 15-Aug-2018 | |
5 | 1 | The Licensee or transferee, as the case may be, shall within thirty (30) days of receiving written notification of:-- the grant of the Licence; or
- registration of a transfer introducing a new Licensee;
advise, by registered post, the holder of any underlying pastoral or grazing lease details of the grant or transfer. | 15-Aug-2018 | |
| 1 | Consent to explore on Meda Location 15 (Yampi Defence Training Area) granted subject to: | 15-Aug-2018 | |
6 | 1 | The Australian Government not guaranteeing access to the Commonwealth Land. | 15-Aug-2018 | |
7 | 1 | The licensee obtaining the relevant approvals required under the Land Acquisitions Act 1989 (Cth). | 15-Aug-2018 | |
8 | 1 | If deed of access is granted, exploration activities being limited to those specified in the deed. | 15-Aug-2018 | |
9 | 1 | Any proposed future mining activities, being subject to separate approval required under the Lands Acquisition Act 1989 (Cth). | 15-Aug-2018 | |
10 | 1 | The construction and operation of the project and measures to protect the environment to be carried out in accordance with the document titled:
- (PoW Reg ID 83139) "Chalice Gold Environment and Conservation Management Plan - King Leopold Project" dated July 2019 signed by Kevin Frost, and retained on Department of Mines, Industry Regulation and Safety File No. EARS-POW-83139 as Doc ID 6964966
| 14-Nov-2019 | |
Cond # | Ver | Text | Start | End |
1 | 1 | All disturbances to the surface of the land made as a result of exploration, including costeans, drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, DMIRS. Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, DMIRS. | 15-Aug-2018 | |
2 | 1 | All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program. | 15-Aug-2018 | |
3 | 1 | Unless the written approval of the Environmental Officer, DMIRS is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations. | 15-Aug-2018 | |
4 | 1 | The Licensee notifying the holder of any underlying pastoral or grazing lease by telephone or in person, or by registered post if contact cannot be made, prior to undertaking airborne geophysical surveys or any ground disturbing activities utilising equipment such as scrapers, graders, bulldozers, backhoes, drilling rigs; water carting equipment or other mechanised equipment. | 15-Aug-2018 | |
5 | 1 | The Licensee or transferee, as the case may be, shall within thirty (30) days of receiving written notification of:-- the grant of the Licence; or
- registration of a transfer introducing a new Licensee;
advise, by registered post, the holder of any underlying pastoral or grazing lease details of the grant or transfer. | 15-Aug-2018 | |
| 1 | Consent to explore on Meda Location 15 (Yampi Defence Training Area) granted subject to: | 15-Aug-2018 | |
6 | 1 | The Australian Government not guaranteeing access to the Commonwealth Land. | 15-Aug-2018 | |
7 | 1 | The licensee obtaining the relevant approvals required under the Land Acquisitions Act 1989 (Cth). | 15-Aug-2018 | |
8 | 1 | If deed of access is granted, exploration activities being limited to those specified in the deed. | 15-Aug-2018 | |
9 | 1 | Any proposed future mining activities, being subject to separate approval required under the Lands Acquisition Act 1989 (Cth). | 15-Aug-2018 | |
10 | 1 | The construction and operation of the project and measures to protect the environment to be carried out in accordance with the document titled:
- (PoW Reg ID 83139) "Chalice Gold Environment and Conservation Management Plan - King Leopold Project" dated July 2019 signed by Kevin Frost, and retained on Department of Mines, Industry Regulation and Safety File No. EARS-POW-83139 as Doc ID 6964966
| 14-Nov-2019 | |
Type | Number | Details |
Application to Amend | 430812 | Lodged:08:30 06 September 2013Amending:AddressFrom:STRATEGIC METALS PTY LTD, C/- WESTERN TENEMENT SERVICES PO BOX 428, GREENWOOD, WA, 6924To:STRATEGIC METALS PTY LTD, PO BOX 4455, MOSMAN PARK, WA, 6912RECORDED:08:30 06 September 2013 |
Caveat | 547689 | Lodged:13:24:30 13 February 2019Caveat Type:Absolute CaveatCaveator:NORTH WEST NICKEL PTY LTDShares Caveated:100/100 shares STRATEGIC METALS PTY LTDRECORDED:13:24:30 13 February 2019WITHDRAWN:15:13:45 24 October 2023 |
Extension / Renewal of Term | 683489 | Lodged:15:39:11 11 August 2023Applied For Period:5 YearsRECORDED:15:39:11 11 August 2023GRANTED:02 November 2023Granted Period:5 YearsTerm Extended To:14/08/2028 |
Application to Amend | 686030 | Lodged:15:55:05 14 September 2023Amending:Address (Including DTC Details)From:Principal Place of Business : STRATEGIC METALS PTY LTD, SAME AS CORRESPONDENCE and DTC :STRATEGIC METALS PTY LTD, PO BOX 4455, MOSMAN PARK, WA, 6912To:Principal Place of Business : STRATEGIC METALS PTY LTD, C/- WESTERN TENEMENT SERVICES, PO BOX 3285, EAST PERTH, WA, 6892, xxxxx@wts.net.au, xxxxxxx111 and DTC :STRATEGIC METALS PTY LTD, WESTERN TENEMENT SERVICES, C/- WESTERN TENEMENT SERVICES, PO BOX 3285, EAST PERTH, WA, 6892, xxxxx@wts.net.au, xxxxxxx111RECORDED:15:55:05 14 September 2023 |
Withdrawal of Dealing | 688538 | Lodged:15:13:45 24 October 2023In respect to:Caveat 547689RECORDED:15:13:45 24 October 2023 |
Partial Surrender - Compulsory | 712104 | Lodged:16:06:34 12 August 2024Section:Section 65 (3)Surrendered Blocks:BROOME 848 a, b, c, d, e, f, g, h, j, k
BROOME 849 a, b, c, d, f, g, h, j
BROOME 921 dSurrendered Total:19 BL.REGISTERED:Midnight 14 August 2024Surrendered area to be released 08:30:00 05/09/2024 under Section 65 (3)Surrendered area released 08:30:00 05/09/2024 under Section 65 (3) |