Extracted from MTO on 16-Jul-2025 01:31,
last changed 27-Jun-2025.
# | Ver | Text | Start | End |
1 | 1 | All surface holes drilled for the purpose of exploration are to be capped, filled or otherwise made safe immediately after completion. | 02-May-2012 | |
2 | 1 | All disturbances to the surface of the land made as a result of exploration, including costeans, drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Mines and Petroleum (DMP). Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, DMP. | 02-May-2012 | |
3 | 1 | All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program. | 02-May-2012 | |
4 | 1 | Unless the written approval of the Environmental Officer, DMP is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations. | 02-May-2012 | |
5 | 1 | The licensee notifying the holder of any underlying pastoral or grazing lease by telephone or in person, or by registered post if contact cannot be made, prior to undertaking airborne geophysical surveys or any ground disturbing activities utilising equipment such as scrapers, graders, bulldozers, backhoes, drilling rigs; water carting equipment or other mechanised equipment. | 02-May-2012 | |
6 | 1 | The licensee or transferee, as the case may be, shall within thirty (30) days of receiving written notification of:-- the grant of the licence; or
- registration of a transfer introducing a new licensee;
advise, by registered post, the holder of any underlying pastoral or grazing lease details of the grant or transfer. | 02-May-2012 | |
| 1 | In respect to AW21 (ANCA wetlands) also subject to; | 02-May-2012 | |
7 | 1 | All Mining Act tenement activities prohibited within 200 metres of RAMSAR or ANCA listed wetlands unless written permission of the Department of Environment and Conservation is first obtained. | 02-May-2012 | |
Cond # | Ver | Text | Start | End |
1 | 1 | All surface holes drilled for the purpose of exploration are to be capped, filled or otherwise made safe immediately after completion. | 02-May-2012 | |
2 | 1 | All disturbances to the surface of the land made as a result of exploration, including costeans, drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Mines and Petroleum (DMP). Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, DMP. | 02-May-2012 | |
3 | 1 | All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program. | 02-May-2012 | |
4 | 1 | Unless the written approval of the Environmental Officer, DMP is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations. | 02-May-2012 | |
5 | 1 | The licensee notifying the holder of any underlying pastoral or grazing lease by telephone or in person, or by registered post if contact cannot be made, prior to undertaking airborne geophysical surveys or any ground disturbing activities utilising equipment such as scrapers, graders, bulldozers, backhoes, drilling rigs; water carting equipment or other mechanised equipment. | 02-May-2012 | |
6 | 1 | The licensee or transferee, as the case may be, shall within thirty (30) days of receiving written notification of:-- the grant of the licence; or
- registration of a transfer introducing a new licensee;
advise, by registered post, the holder of any underlying pastoral or grazing lease details of the grant or transfer. | 02-May-2012 | |
| 1 | In respect to AW21 (ANCA wetlands) also subject to; | 02-May-2012 | |
7 | 1 | All Mining Act tenement activities prohibited within 200 metres of RAMSAR or ANCA listed wetlands unless written permission of the Department of Environment and Conservation is first obtained. | 02-May-2012 | |
Type | Number | Details |
Application to Amend | 486600 | Lodged:14:40 11 May 2016Amending:Address (Including DTC Details)From:SHEFFIELD RESOURCES LIMITED, C/- WESTERN TENEMENT SERVICES, PO BOX 428, GREENWOOD, WA, 6924To:SHEFFIELD RESOURCES LIMITED, C/- WESTERN TENEMENT SERVICES, PO BOX 3285, EAST PERTH, WA, 6892RECORDED:14:40 11 May 2016 |
Extension of Time | 489664 | Lodged:13:56:07 30 June 2016Type:Form 5RECORDED:13:56:07 30 June 2016APPROVED:14:56:11 05 July 2016Time to lodge extended to 07/07/2016 |
Extension / Renewal of Term | 505314 | Lodged:11:21:43 27 April 2017Applied For Period:5 YearsRECORDED:11:21:43 27 April 2017GRANTED:03 July 2017Granted Period:5 YearsTerm Extended To:01/05/2022 |
Partial Surrender - Compulsory | 530258 | Lodged:14:21:36 15 May 2018Section:Section 65 (3)Surrendered Blocks:BROOME 1548 l, m, n, o, q, r, s, v, w
BROOME 1549 w, x
BROOME 1620 aSurrendered Total:12 BL.REGISTERED:14:21:36 15 May 2018Surrendered area to be released 08:30:00 06/06/2018 under Section 65 (3)Surrendered area released 08:30:00 06/06/2018 under Section 65 (3) |
Extension of Time | 536078 | Lodged:15:03:01 27 July 2018Type:Stat DecRECORDED:15:03:01 27 July 2018APPROVED:09:42:14 30 July 2018Time to lodge extended to 10/08/2018 |
Extension of Time | 629191 | Lodged:15:13:53 28 July 2021Type:Stat DecRECORDED:15:13:53 28 July 2021APPROVED:10:54:39 29 July 2021Time to lodge extended to 11 August 2021 |
Extension / Renewal of Term | 648175 | Lodged:15:20:16 29 April 2022Applied For Period:2 YearsRECORDED:15:20:16 29 April 2022GRANTED:03 August 2022Granted Period:2 YearsTerm Extended To:01/05/2024 |
Extension / Renewal of Term | 702668 | Lodged:16:07:17 30 April 2024Applied For Period:2 YearsRECORDED:16:07:17 30 April 2024GRANTED:24 June 2024Granted Period:2 YearsTerm Extended To:01/05/2026 |
Surrender - Outright | 725118 | Lodged:11:46:15 06 February 2025REGISTERED:11:46:15 06 February 2025 |