Extracted from MTO on 06-Jul-2025 01:41,
last changed 26-Jun-2025.
# | Ver | Text | Start | End |
1 | 1 | All surface holes drilled for the purpose of exploration are to be capped, filled or otherwise made safe immediately after completion. | 18-Apr-2011 | |
2 | 2 | All Exploration and prospecting disturbances, excluding supporting infrastructure, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Energy, Mines, Industry Regulation and Safety. Backfilling and rehabilitation being required no later than 12 months after completion of the activity unless otherwise approved in writing by the Environmental Officer, Department of Energy, Mines, Industry Regulation and Safety. | 18-Nov-2024 | |
2 | 1 | All costeans and other disturbances to the surface of the land made as a result of exploration, including drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Mines and Petroleum (DMP). Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, DMP. | 18-Apr-2011 | 17-Nov-2024 |
3 | 1 | All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program. | 18-Apr-2011 | |
4 | 1 | Unless the written approval of the Environmental Officer, DMP is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations. | 18-Apr-2011 | |
5 | 1 | The licensee notifying the holder of any underlying pastoral or grazing lease by telephone or in person, or by registered post if contact cannot be made, prior to undertaking airborne geophysical surveys or any ground disturbing activities utilising equipment such as scrapers, graders, bulldozers, backhoes, drilling rigs; water carting equipment or other mechanised equipment. | 18-Apr-2011 | |
6 | 1 | The licensee or transferee, as the case may be, shall within thirty (30) days of receiving written notification of:-- the grant of the licence; or
- registration of a transfer introducing a new licensee;
advise, by registered post, the holder of any underlying pastoral or grazing lease details of the grant or transfer. | 18-Apr-2011 | |
7 | 1 | The rights of ingress to and egress from Miscellaneous Licence 04/18 being at all times preserved to the licensee and no interference with the purpose or installations connected to the licence. | 18-Apr-2011 | |
8 | 1 | All supporting infrastructure for exploration and prospecting including core yards, laydowns, camps, and access tracks (excluding drill lines), being rehabilitated to the satisfaction of the Environmental Officer, Department of Energy, Mines, Industry Regulation and Safety. Rehabilitation being required by the earlier of 12 months from the infrastructure being no longer required to support exploration, or 12 months from the relevant programme of work expiring, unless otherwise approved in writing by the Environmental Officer, Department of Energy, Mines, Industry Regulation and Safety. | 18-Nov-2024 | |
9 | 1 | The tenement holder must maintain appropriate records of exploration/prospecting activities, and associated rehabilitation undertaken, in order to demonstrate compliance with all conditions and environmental management and rehabilitation practice commitments. These records to be made available to the Department upon request. | 18-Nov-2024 | |
10 | 1 | All exploration and prospecting operations to comply with the environmental management and rehabilitation practice commitments provided in the approved programme of work. | 18-Nov-2024 | |
Cond # | Ver | Text | Start | End |
1 | 1 | All surface holes drilled for the purpose of exploration are to be capped, filled or otherwise made safe immediately after completion. | 18-Apr-2011 | |
2 | 2 | All Exploration and prospecting disturbances, excluding supporting infrastructure, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Energy, Mines, Industry Regulation and Safety. Backfilling and rehabilitation being required no later than 12 months after completion of the activity unless otherwise approved in writing by the Environmental Officer, Department of Energy, Mines, Industry Regulation and Safety. | 18-Nov-2024 | |
2 | 1 | All costeans and other disturbances to the surface of the land made as a result of exploration, including drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Mines and Petroleum (DMP). Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, DMP. | 18-Apr-2011 | 17-Nov-2024 |
3 | 1 | All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program. | 18-Apr-2011 | |
4 | 1 | Unless the written approval of the Environmental Officer, DMP is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations. | 18-Apr-2011 | |
5 | 1 | The licensee notifying the holder of any underlying pastoral or grazing lease by telephone or in person, or by registered post if contact cannot be made, prior to undertaking airborne geophysical surveys or any ground disturbing activities utilising equipment such as scrapers, graders, bulldozers, backhoes, drilling rigs; water carting equipment or other mechanised equipment. | 18-Apr-2011 | |
6 | 1 | The licensee or transferee, as the case may be, shall within thirty (30) days of receiving written notification of:-- the grant of the licence; or
- registration of a transfer introducing a new licensee;
advise, by registered post, the holder of any underlying pastoral or grazing lease details of the grant or transfer. | 18-Apr-2011 | |
7 | 1 | The rights of ingress to and egress from Miscellaneous Licence 04/18 being at all times preserved to the licensee and no interference with the purpose or installations connected to the licence. | 18-Apr-2011 | |
8 | 1 | All supporting infrastructure for exploration and prospecting including core yards, laydowns, camps, and access tracks (excluding drill lines), being rehabilitated to the satisfaction of the Environmental Officer, Department of Energy, Mines, Industry Regulation and Safety. Rehabilitation being required by the earlier of 12 months from the infrastructure being no longer required to support exploration, or 12 months from the relevant programme of work expiring, unless otherwise approved in writing by the Environmental Officer, Department of Energy, Mines, Industry Regulation and Safety. | 18-Nov-2024 | |
9 | 1 | The tenement holder must maintain appropriate records of exploration/prospecting activities, and associated rehabilitation undertaken, in order to demonstrate compliance with all conditions and environmental management and rehabilitation practice commitments. These records to be made available to the Department upon request. | 18-Nov-2024 | |
10 | 1 | All exploration and prospecting operations to comply with the environmental management and rehabilitation practice commitments provided in the approved programme of work. | 18-Nov-2024 | |
Type | Number | Details |
Objection | KR464/089 | Lodged:11:51 07 April 2009Objectors:LENNARD SHELF PTY LTDObjection Type:Tenement ApplicationWardens Decision Made on:26/10/2009 09:30:00Wardens Decision Status:FinalisedWardens Decision Text:Objection withdrawnRECORDED:11:51 07 April 2009FINALISED:09:30 26 October 2009 |
Miscellaneous Entry | | In the Karratha Warden's Court 19 June, 2009, a Ballot was conducted to determine priority between applications for Exploration Licences 04/1893 and 04/1894:-
1st Drawn:- E04/1894
2nd Drawn:- E04/1893 |
Application to Amend | 334887 | Lodged:10:45 18 November 2009Amending:AddressFrom:Residential : ZINC CO AUSTRALIA LIMITED, SAME AS CORRESPONDENCE and Correspondence :ZINC CO AUSTRALIA LIMITED, LEVEL 2, 33 ORD ST, WEST PERTH, WA, 6005To:Residential : ZINC CO AUSTRALIA LIMITED, LEVEL 2, 33 ORD ST, WEST PERTH, WA, 6008 and Correspondence :ZINC CO AUSTRALIA LIMITED, C/- M & M WALTER CONSULTING, PO BOX 8197, SUBIACO EAST, WA, 6008RECORDED:10:45 18 November 2009 |
Application to Amend | 362852 | Lodged:09:30 07 January 2011Amending:NameFrom:ZINC CO AUSTRALIA LIMITEDTo:ZENITH MINERALS LIMITEDRECORDED:09:30 07 January 2011 |
Application to Amend | 403055 | Lodged:13:00 03 August 2012Amending:AddressFrom:MERIDIAN (LENNARD SHELF PROJECT) PTY LTD, C/- M & M WALTER CONSULTING, PO BOX 8197, SUBIACO EAST, WA, 6008To:MERIDIAN (LENNARD SHELF PROJECT) PTY LTD, C/- AUSTWIDE MINING TITLE MANAGEMENT PTY LTD, PO BOX 1434, WANGARA, WA, 6947RECORDED:13:00 03 August 2012 |
Amalgamation | 448329 | Lodged:10:27 06 June 2014Amalgamating portions of Prospecting Licences 04/251 and 04/261 situated within the external boundary of this licence.
GRANTED 03 December 2014 |
Amalgamation | 469054 | Lodged:10:55 11 June 2015Amalgamating : Portion of M04/139 and portion of M04/141
Situated within : External boundaries of E04/1894GRANTED 01 April 2016 |
Extension / Renewal of Term | 485045 | Lodged:09:05:03 13 April 2016Applied For Period:5 YearsRECORDED:09:05:03 13 April 2016GRANTED:14 July 2016Granted Period:5 YearsTerm Extended To:17/04/2021 |
Caveat | 501280 | Lodged:10:58:26 17 February 2017Caveat Type:Consent CaveatCaveator:LENNARD SHELF PTY LTDShares Caveated:100/100 shares MERIDIAN (LENNARD SHELF PROJECT) PTY LTDRECORDED:10:58:26 17 February 2017 |
Partial Surrender - Compulsory | 503927 | Lodged:08:30 05 April 2017Section:Section 65 (3)Surrendered Blocks:BROOME 2231 w, x
BROOME 2303 b, c, gSurrendered Total:5 BL.REGISTERED:Midnight 17 April 2017Surrendered area to be released 08:30:00 11/05/2017 under Section 65 (3)Surrendered area released 08:30:00 11/05/2017 under Section 65 (3) |
Extension / Renewal of Term | 619753 | Lodged:11:34:23 08 April 2021Applied For Period:2 YearsRECORDED:11:34:23 08 April 2021GRANTED:17 June 2021Granted Period:2 YearsTerm Extended To:17/04/2023 |
Extension / Renewal of Term | 672275 | Lodged:11:40:46 31 March 2023Applied For Period:2 YearsRECORDED:11:40:46 31 March 2023GRANTED:29 June 2023Granted Period:2 YearsTerm Extended To:17/04/2025 |
Extension / Renewal of Term | 730935 | Lodged:10:39:26 14 April 2025Applied For Period:2 YearsRECORDED:10:39:26 14 April 2025GRANTED:17 June 2025Granted Period:2 YearsTerm Extended To:17/04/2027 |