Extracted from MTO on 01-Jul-2025 00:30,
last changed 26-Jun-2025.
# | Ver | Text | Start | End |
1 | 1 | All surface holes drilled for the purpose of exploration are to be capped, filled or otherwise made safe immediately after completion. | 05-Nov-2007 | |
2 | 1 | All costeans and other disturbances to the surface of the land made as a result of exploration, including drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Industry and Resources (DoIR). Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, DoIR. | 05-Nov-2007 | |
3 | 1 | All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program. | 05-Nov-2007 | |
4 | 1 | Unless the written approval of the Environmental Officer, DoIR is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations. | 05-Nov-2007 | |
5 | 1 | The Licensee notifying the holder of any underlying pastoral or grazing lease by telephone or in person, or by registered post if contact cannot be made, prior to undertaking airborne geophysical surveys or any ground disturbing activities utilising equipment such as scrapers, graders, bulldozers, backhoes, drilling rigs; water carting equipment or other mechanised equipment. | 05-Nov-2007 | |
6 | 1 | The Licensee or transferee, as the case may be, shall within thirty (30) days of receiving written notification of:-- the grant of the Licence; or
- registration of a transfer introducing a new Licensee;
advise, by registered post, the holder of any underlying pastoral or grazing lease details of the grant or transfer. | 05-Nov-2007 | |
Cond # | Ver | Text | Start | End |
1 | 1 | All surface holes drilled for the purpose of exploration are to be capped, filled or otherwise made safe immediately after completion. | 05-Nov-2007 | |
2 | 1 | All costeans and other disturbances to the surface of the land made as a result of exploration, including drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Industry and Resources (DoIR). Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, DoIR. | 05-Nov-2007 | |
3 | 1 | All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program. | 05-Nov-2007 | |
4 | 1 | Unless the written approval of the Environmental Officer, DoIR is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations. | 05-Nov-2007 | |
5 | 1 | The Licensee notifying the holder of any underlying pastoral or grazing lease by telephone or in person, or by registered post if contact cannot be made, prior to undertaking airborne geophysical surveys or any ground disturbing activities utilising equipment such as scrapers, graders, bulldozers, backhoes, drilling rigs; water carting equipment or other mechanised equipment. | 05-Nov-2007 | |
6 | 1 | The Licensee or transferee, as the case may be, shall within thirty (30) days of receiving written notification of:-- the grant of the Licence; or
- registration of a transfer introducing a new Licensee;
advise, by registered post, the holder of any underlying pastoral or grazing lease details of the grant or transfer. | 05-Nov-2007 | |
Type | Number | Details |
Caveat | 374731 | Lodged:12:10 17 June 2011Caveat Type:Consent CaveatCaveator:LENNARD SHELF PTY LTDShares Caveated:100/100 shares MERIDIAN (LENNARD SHELF PROJECT) PTY LTDRECORDED:12:10 17 June 2011 |
Application to Amend | 403055 | Lodged:13:00 03 August 2012Amending:AddressFrom:MERIDIAN (LENNARD SHELF PROJECT) PTY LTD, C/- M & M WALTER CONSULTING, PO BOX 8197, SUBIACO EAST, WA, 6008To:MERIDIAN (LENNARD SHELF PROJECT) PTY LTD, C/- AUSTWIDE MINING TITLE MANAGEMENT PTY LTD, PO BOX 1434, WANGARA, WA, 6947RECORDED:13:00 03 August 2012 |
Partial Surrender - Compulsory | 409196 | Lodged:14:29:07 29 October 2012Section:Section 65 (3)Surrendered Blocks:BROOME 1870 k, p, t, uSurrendered Total:4 BL.REGISTERED:Midnight 04 November 2012Surrendered area to be released 08:30:00 21/11/2012 under Section 65 (3)Surrendered area released 08:30:00 21/11/2012 under Section 65 (3) |
Extension / Renewal of Term | 409197 | Lodged:14:36:56 29 October 2012Applied For Period:5 YearsRECORDED:14:36:56 29 October 2012GRANTED:17 January 2013Granted Period:5 YearsTerm Extended To:04/11/2017 |
Extension / Renewal of Term | 517348 | Lodged:08:47:59 31 October 2017Applied For Period:2 YearsRECORDED:08:47:59 31 October 2017GRANTED:07 March 2018Granted Period:2 YearsTerm Extended To:04/11/2019 |
Extension / Renewal of Term | 565259 | Lodged:12:00:08 22 October 2019Applied For Period:2 YearsRECORDED:12:00:08 22 October 2019GRANTED:06 January 2020Granted Period:2 YearsTerm Extended To:04/11/2021 |
Extension / Renewal of Term | 634886 | Lodged:09:09:43 29 October 2021Applied For Period:2 YearsRECORDED:09:09:43 29 October 2021GRANTED:13 January 2022Granted Period:2 YearsTerm Extended To:04/11/2023 |
Extension / Renewal of Term | 688925 | Lodged:15:58:59 30 October 2023Applied For Period:2 YearsRECORDED:15:58:59 30 October 2023GRANTED:19 January 2024Granted Period:2 YearsTerm Extended To:04/11/2025 |