Extracted from MTO on 06-Jul-2025 00:25,
last changed 28-Jun-2025.
# | Ver | Text | Start | End |
1 | 1 | All surface holes drilled for the purpose of exploration are to be capped, filled or otherwise made safe immediately after completion. | 17-Sep-2013 | |
2 | 1 | All disturbances to the surface of the land made as a result of exploration, including costeans, drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Mines and Petroleum (DMP). Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, DMP. | 17-Sep-2013 | |
3 | 1 | All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program. | 17-Sep-2013 | |
4 | 1 | Unless the written approval of the Environmental Officer, DMP is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations. | 17-Sep-2013 | |
5 | 1 | The prior written consent of the Minister responsible for the Mining Act 1978 being obtained before commencing any exploration activities on Proposed Water Reserve 52, FNA 8589 (Proposed Port and LNG Purposes) and FNA 9338 (Browse LNG Buffer). | 17-Sep-2013 | |
Cond # | Ver | Text | Start | End |
1 | 1 | All surface holes drilled for the purpose of exploration are to be capped, filled or otherwise made safe immediately after completion. | 17-Sep-2013 | |
2 | 1 | All disturbances to the surface of the land made as a result of exploration, including costeans, drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Mines and Petroleum (DMP). Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, DMP. | 17-Sep-2013 | |
3 | 1 | All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program. | 17-Sep-2013 | |
4 | 1 | Unless the written approval of the Environmental Officer, DMP is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations. | 17-Sep-2013 | |
5 | 1 | The prior written consent of the Minister responsible for the Mining Act 1978 being obtained before commencing any exploration activities on Proposed Water Reserve 52, FNA 8589 (Proposed Port and LNG Purposes) and FNA 9338 (Browse LNG Buffer). | 17-Sep-2013 | |
Type | Number | Details |
Application to Amend | 367782 | Lodged:14:50 17 March 2011Amending:AddressFrom:Residential : KIMBERLEY QUARRY PTY LTD, SAME AS CORRESPONDENCE and Correspondance :KIMBERLEY QUARRY PTY LTDC/-, PO BOX 4370, MYAREE, WA, 6960To:Residential : KIMBERLEY QUARRY PTY LTD, ADDRESS NOT PROVIDED and Correspondance :KIMBERLEY QUARRY PTY LTDC/- AUSTWIDE MINING TITLE MANAGEMENT PTY LTD, PO BOX 1434, WANGARA, WA, 6947RECORDED:14:50 17 March 2011 |
Application to Amend | 479246 | Lodged:08:30 21 December 2015Amending:AddressFrom:KIMBERLEY QUARRY PTY LTD, C/- AUSTWIDE MINING TITLE MANAGEMENT PTY LTD, PO BOX 1434, WANGARA, WA, 6947To:KIMBERLEY QUARRY PTY LTD, C/- M & M WALTER CONSULTING, PO BOX 8197, SUBIACO EAST, WA, 6008RECORDED:08:30 21 December 2015 |
Application to Amend | 536726 | Lodged:08:30 09 August 2018Amending:Address (Including DTC Details)From:Principal Place of Business : KIMBERLEY QUARRY PTY LTD, ADDRESS NOT PROVIDED and DTC :KIMBERLEY QUARRY PTY LTD, C/- M & M WALTER CONSULTING, PO BOX 8197, SUBIACO EAST, WA, 6008To:Principal Place of Business : KIMBERLEY QUARRY PTY LTD, PO BOX 4370, MYAREE BC, WA, 6960 and DTC :KIMBERLEY QUARRY PTY LTD, PO BOX 4370, MYAREE BC, WA, 6960RECORDED:08:30 09 August 2018 |
Partial Surrender - Compulsory | 538696 | Lodged:13:51:25 07 September 2018Section:Section 65 (3)Surrendered Blocks:BROOME 1323 j, k, y, z
BROOME 1324 f, g, h, v, wSurrendered Total:9 BL.REJECTED:13:51:25 07 September 2018 |
Partial Surrender - Voluntary | 538978 | Lodged:13:20:19 12 September 2018Surrendered Blocks:BROOME 1323 j, k, y, z
BROOME 1324 f, g, h, v, wSurrendered Total:9 BL.REGISTERED:13:20:19 12 September 2018 |
Extension / Renewal of Term | 539109 | Lodged:11:26:46 14 September 2018Applied For Period:5 YearsRECORDED:11:26:46 14 September 2018GRANTED:09 November 2018Granted Period:5 YearsTerm Extended To:16/09/2023 |
Surrender - Outright | 566035 | Lodged:08:55:50 05 November 2019REGISTERED:08:55:50 05 November 2019 |