1 | 1 | All surface holes drilled for the purpose of exploration are to be capped, filled or otherwise made safe after completion. | 29-May-2003 | |
2 | 3 | All disturbances to the surface of the land made as a result of exploration, including costeans, drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Mines, Industry Regulation and Safety (DMIRS). Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, DMIRS. | 16-Jan-2020 | |
2 | 2 | All costeans and other disturbances to the surface of the land made as a result of exploration, including drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Industry and Resources (DoIR). Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, DoIR. | 12-Aug-2005 | 15-Jan-2020 |
2 | 1 | All costeans and other disturbances to the surface of the land made as a result of exploration, including drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the District Mining Engineer. Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the District Mining Engineer. | 29-May-2003 | 11-Aug-2005 |
3 | 3 | All waste materials, rubbish, plastic sample bags and non-operational equipment must be permanently removed from the island prior to 1 November each year. | 14-Aug-2023 | |
3 | 2 | Unless otherwise approved by the Environmental Officer, DMIRS, all waste materials, rubbish, plastic sample bags, abandoned equipment and buildings are to be removed from the mining tenement prior to 1 November each year. | 16-Jan-2020 | 13-Aug-2023 |
3 | 1 | All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program. | 29-May-2003 | 15-Jan-2020 |
4 | 3 | Unless otherwise approved in writing by the Environmental Officer, DMIRS, the use of scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Where approval is obtained, all topsoil is to be removed and separately stockpiled for replacement after backfilling and/or completion of operations. | 16-Jan-2020 | |
4 | 2 | Unless the written approval of the Environmental Officer, DoIR is first obtained, the use of scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations. | 12-Aug-2005 | 15-Jan-2020 |
4 | 1 | Unless the written approval of the District Mining Engineer is first obtained, the use of scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations. | 29-May-2003 | 11-Aug-2005 |
5 | 1 | No interference with the use of the Aerial Landing Ground and mining thereon being confined to below a depth of 15 metres from the natural surface. | 29-May-2003 | |
6 | 1 | No interference with Geodetic Survey Stations S90 and S96 and mining within 15 metres thereof being confined to below a depth of 15 metres from the natural surface. | 29-May-2003 | |
7 | 1 | The prior written consent of the Minister for State Development being obtained before commencing mining on Explosives Reserve 22493 and foreshore, seabed and navigable waters. | 29-May-2003 | |
| 1 | In respect to the area of land designated PNR 230 ( Proposed Nature Reserve) in TENGRAPH, hereinafter referred to as the designated area, the following shall apply: | 29-May-2003 | 18-Jun-2009 |
8 | 1 | Prior to accessing the licence area, the licensee shall consult with the Regional Environmental Officer, Department of Industry and Resources (DoIR), and ensure that where required all vehicles and equipment entering the designated area are washed down to remove soil and plant propagules and adhering to such conditions specified for the prevention of the spread of soil- borne diseases. | 29-May-2003 | 18-Jun-2009 |
9 | 1 | Prior to any activity involving disturbance to vegetation and soils including:-- exploration access; and/or
- exploration sampling;
the licensee preparing a detailed program for each phase of proposed exploration for written approval of the State Mining Engineer.The State Mining Engineer to consult with the Regional/District Manager, Department of Conservation and Land Management or the Department of Environmental Protection or other government agency (as relevant) prior to approval. This program to describe the environmental impacts and programs for their management and is to include:-- maps and/or aerial photographs showing the proposed locations of all ground activities and disturbances;
- the purpose, specifications and extent of each activity and disturbance;
- descriptions of all vegetation types (in general terms), land forms, and unusual features likely to be disturbed by such proposed disturbances.
- details on proposals that may disturb sensitive terrestrial habitats including any declared rare flora and fauna if applicable;
- procedures to protect the integrity of special ecosystems such as wetland systems, mangal communities and rainforests areas (and/or associated rainforest monitoring sites) if applicable;
- techniques, prescriptions, and timetable for rehabilitation of all proposed disturbances;
- undertaking for corrective measures for failed rehabilitation;
- details of water requirements from within the designated area;
- details of refuse disposal; and
- proposals for instruction and supervision of personnel and contractors in respect to environmental conditions.
| 29-May-2003 | 18-Jun-2009 |
10 | 1 | Access to and from and the movement of vehicles within the licence area being restricted to ground or seasonal conditions and routes approved under the program or otherwise agreed by the Regional Environmental Officer, DoIR. | 29-May-2003 | 18-Jun-2009 |
11 | 1 | At agreed intervals, not greater than 12 monthly, the licensee providing a brief report to the State Mining Engineer outlining the progress of the operation and rehabilitation program and the proposed operations and rehabilitation programs for the next 12 months. | 29-May-2003 | 18-Jun-2009 |
12 | 1 | Prior to the cessation of the exploration/prospecting activity in the designated area, the licensee notifying the Regional Environmental Officer, DoIR and arranging an inspection as required. | 29-May-2003 | 18-Jun-2009 |
13 | 1 | All rubbish and scrap being progressively disposed of in a suitable manner. | 14-Aug-2023 | |
Cond # | Ver | Text | Start | End |
1 | 1 | All surface holes drilled for the purpose of exploration are to be capped, filled or otherwise made safe after completion. | 29-May-2003 | |
2 | 3 | All disturbances to the surface of the land made as a result of exploration, including costeans, drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Mines, Industry Regulation and Safety (DMIRS). Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, DMIRS. | 16-Jan-2020 | |
2 | 2 | All costeans and other disturbances to the surface of the land made as a result of exploration, including drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Industry and Resources (DoIR). Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, DoIR. | 12-Aug-2005 | 15-Jan-2020 |
2 | 1 | All costeans and other disturbances to the surface of the land made as a result of exploration, including drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the District Mining Engineer. Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the District Mining Engineer. | 29-May-2003 | 11-Aug-2005 |
3 | 3 | All waste materials, rubbish, plastic sample bags and non-operational equipment must be permanently removed from the island prior to 1 November each year. | 14-Aug-2023 | |
3 | 2 | Unless otherwise approved by the Environmental Officer, DMIRS, all waste materials, rubbish, plastic sample bags, abandoned equipment and buildings are to be removed from the mining tenement prior to 1 November each year. | 16-Jan-2020 | 13-Aug-2023 |
3 | 1 | All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program. | 29-May-2003 | 15-Jan-2020 |
4 | 3 | Unless otherwise approved in writing by the Environmental Officer, DMIRS, the use of scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Where approval is obtained, all topsoil is to be removed and separately stockpiled for replacement after backfilling and/or completion of operations. | 16-Jan-2020 | |
4 | 2 | Unless the written approval of the Environmental Officer, DoIR is first obtained, the use of scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations. | 12-Aug-2005 | 15-Jan-2020 |
4 | 1 | Unless the written approval of the District Mining Engineer is first obtained, the use of scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations. | 29-May-2003 | 11-Aug-2005 |
5 | 1 | No interference with the use of the Aerial Landing Ground and mining thereon being confined to below a depth of 15 metres from the natural surface. | 29-May-2003 | |
6 | 1 | No interference with Geodetic Survey Stations S90 and S96 and mining within 15 metres thereof being confined to below a depth of 15 metres from the natural surface. | 29-May-2003 | |
7 | 1 | The prior written consent of the Minister for State Development being obtained before commencing mining on Explosives Reserve 22493 and foreshore, seabed and navigable waters. | 29-May-2003 | |
| 1 | In respect to the area of land designated PNR 230 ( Proposed Nature Reserve) in TENGRAPH, hereinafter referred to as the designated area, the following shall apply: | 29-May-2003 | 18-Jun-2009 |
8 | 1 | Prior to accessing the licence area, the licensee shall consult with the Regional Environmental Officer, Department of Industry and Resources (DoIR), and ensure that where required all vehicles and equipment entering the designated area are washed down to remove soil and plant propagules and adhering to such conditions specified for the prevention of the spread of soil- borne diseases. | 29-May-2003 | 18-Jun-2009 |
9 | 1 | Prior to any activity involving disturbance to vegetation and soils including:-- exploration access; and/or
- exploration sampling;
the licensee preparing a detailed program for each phase of proposed exploration for written approval of the State Mining Engineer.The State Mining Engineer to consult with the Regional/District Manager, Department of Conservation and Land Management or the Department of Environmental Protection or other government agency (as relevant) prior to approval. This program to describe the environmental impacts and programs for their management and is to include:-- maps and/or aerial photographs showing the proposed locations of all ground activities and disturbances;
- the purpose, specifications and extent of each activity and disturbance;
- descriptions of all vegetation types (in general terms), land forms, and unusual features likely to be disturbed by such proposed disturbances.
- details on proposals that may disturb sensitive terrestrial habitats including any declared rare flora and fauna if applicable;
- procedures to protect the integrity of special ecosystems such as wetland systems, mangal communities and rainforests areas (and/or associated rainforest monitoring sites) if applicable;
- techniques, prescriptions, and timetable for rehabilitation of all proposed disturbances;
- undertaking for corrective measures for failed rehabilitation;
- details of water requirements from within the designated area;
- details of refuse disposal; and
- proposals for instruction and supervision of personnel and contractors in respect to environmental conditions.
| 29-May-2003 | 18-Jun-2009 |
10 | 1 | Access to and from and the movement of vehicles within the licence area being restricted to ground or seasonal conditions and routes approved under the program or otherwise agreed by the Regional Environmental Officer, DoIR. | 29-May-2003 | 18-Jun-2009 |
11 | 1 | At agreed intervals, not greater than 12 monthly, the licensee providing a brief report to the State Mining Engineer outlining the progress of the operation and rehabilitation program and the proposed operations and rehabilitation programs for the next 12 months. | 29-May-2003 | 18-Jun-2009 |
12 | 1 | Prior to the cessation of the exploration/prospecting activity in the designated area, the licensee notifying the Regional Environmental Officer, DoIR and arranging an inspection as required. | 29-May-2003 | 18-Jun-2009 |
13 | 1 | All rubbish and scrap being progressively disposed of in a suitable manner. | 14-Aug-2023 | |
Type | Number | Details |
Exemption from Drop-off | 294H/056 | Lodged 1:55 PM on 05 May 2006 applying for relief from the provisions of Section 65(1)(a)GRANTED 04 Sep 2007 |
Exemption from Drop-off | 339H/067 | Lodged 3:15:00 PM on 15 May 2007 applying for relief from the provisions of Section 65(1)(b)REFUSED 11:59 PM 06 Sep 2007Pursuant to the provisions of Section 65(1b) the expiry date for compliance with Section 65(1)(b) is deferred until 6 Nov 2007. |
Partial Surrender - Compulsory | 277268 | Lodged 3:10:00 PM on 01 Nov 2007 in accordance with Section 65(1)(b)
Surrendered Blocks: BROOME 0044 v; BROOME 0116 d, g, jREGISTERED 3:10 PM 01 Nov 2007Surrendered area to be released 23 Jan 2008 08:30:00 under Section 65(5)Surrendered area released 23 Jan 2008 08:30:00 under Section 65(5) |
Extension / Renewal of Term | 291863 | Lodged:13:58 26 May 2008Applied For Period:2 YearsRECORDED:13:58 26 May 2008Granted Period:2 YearsTerm Extended To:28/05/2010GRANTED:12 January 2009 |
Application to Amend | 316265 | Lodged:10:05 25 March 2009Amending:NameFrom:PORTMAN IRON ORE LTDTo:CLIFFS ASIA PACIFIC IRON ORE PTY LTDRECORDED:10:05 25 March 2009 |
Application to Amend | 336134 | Lodged:14:20 03 December 2009Amending:AddressFrom:CLIFFS ASIA PACIFIC IRON ORE PTY LTD, C/- AUSTWIDE MINING TITLE MANAGEMENT PTY LTD, PO BOX 1434, WANGARA, WA, 6947To:CLIFFS ASIA PACIFIC IRON ORE PTY LTD, LAND ACCESS DEPARTMENT, GPO BOX W2017, PERTH, WA, 6846RECORDED:14:20 03 December 2009 |
Extension / Renewal of Term | 347369 | Lodged:09:26 25 May 2010Applied For Period:2 YearsRECORDED:09:26 25 May 2010GRANTED:19 July 2010Granted Period:2 YearsTerm Extended To:28/05/2012 |
Extension / Renewal of Term | 398257 | Lodged:14:25 25 May 2012Applied For Period:1 YearsRECORDED:14:25 25 May 2012GRANTED:07 August 2012Granted Period:1 YearsTerm Extended To:28/05/2013 |
Application to Amend | 407188 | Lodged:15:25 28 September 2012Amending:AddressFrom:CLIFFS ASIA PACIFIC IRON ORE PTY LTD, LAND ACCESS DEPARTMENT, GPO BOX W2017, PERTH, WA, 6846To:CLIFFS ASIA PACIFIC IRON ORE PTY LTD, C/- PLUTON RESOURCES LTD, LEVEL 14, 5 ORD ST, WEST PERTH, WA, 6005RECORDED:15:25 28 September 2012 |
Extension / Renewal of Term | 423670 | Lodged:09:30 22 May 2013Applied For Period:1 YearsRECORDED:09:30 22 May 2013GRANTED:05 August 2013Granted Period:1 YearsTerm Extended To:28/05/2014 |
Caveat | 429123 | Lodged:12:10 15 August 2013Caveat Type:Consent CaveatCaveator:WISE ENERGY GROUP COMPANY LIMITEDShares Caveated:50/100 shares PLUTON RESOURCES LIMITEDRECORDED:12:10 15 August 2013WITHDRAWN:13:30 28 October 2020 |
Extension / Renewal of Term | 447057 | Lodged:16:25 23 May 2014Applied For Period:1 YearsRECORDED:16:25 23 May 2014GRANTED:25 July 2014Granted Period:1 YearsTerm Extended To:28/05/2015 |
Extension / Renewal of Term | 468009 | Lodged:16:29:11 22 May 2015Applied For Period:1 YearsRECORDED:16:29:11 22 May 2015GRANTED:27 July 2015Granted Period:1 YearsTerm Extended To:28/05/2016 |
Application to Amend | 471153 | Lodged:09:30 14 July 2015Amending:AddressFrom:Residential : PLUTON RESOURCES LIMITED, LEVEL 1, 5 ORD ST, WEST PERTH, WA, 6005 and Correspondence :PLUTON RESOURCES LIMITED, PO BOX 1622, WEST PERTH, WA, 6872To:Residential : PLUTON RESOURCES LIMITED, SAME AS CORRESPONDENCE and Correspondence :PLUTON RESOURCES LIMITED, SUITE 8, LEVEL 1, 12-20 RAILWAY ROAD, SUBIACO, WA, 6008RECORDED:09:30 14 July 2015 |
Application to Amend | 472798 | Lodged:13:57:07 13 August 2015Amending:AddressFrom:PLUTON RESOURCES LIMITED, SUITE 8, LEVEL 1, 12-20 RAILWAY ROAD, SUBIACO, WA, 6008To:PLUTON RESOURCES LIMITED, C/- HETHERINGTON EXPLORATION & MINING TITLE SERVICES PTY LTD, PO BOX 8249, PERTH BUSINESS CENTRE, PERTH, WA, 6849RECORDED:13:57:07 13 August 2015 |
Extension / Renewal of Term | 487369 | Lodged:15:27:53 26 May 2016Applied For Period:1 YearsRECORDED:15:27:53 26 May 2016GRANTED:27 October 2016Granted Period:1 YearsTerm Extended To:28/05/2017 |
Application to Amend | 490190 | Lodged:12:39:57 07 July 2016Amending:Address (Including DTC Details)From:PLUTON RESOURCES LIMITED, C/- HETHERINGTON EXPLORATION & MINING TITLE SERVICES PTY LTD, PO BOX 8249, PERTH BUSINESS CENTRE, PERTH, WA, 6849To:PLUTON RESOURCES LIMITED, HETHERINGTON EXPLORATION & MINING TITLE SERVICES (WA) PTY LTD, PO BOX 8249, PERTH BUSINESS CENTRE, PERTH, WA, 6849, xxxxx@hemts.com.au, xxxxx977RECORDED:12:39:57 07 July 2016 |
Application for Forfeiture | 498268 | Lodged:14:55 08 December 2016Applicant:RCS (WA) NOMINEES PTY LTDRespondent:PLUTON RESOURCES LIMITEDRECORDED:14:55 08 December 2016By consent of the parties the Warden on the 13/12/2019 withdrew the application for forfeitureWarden's Determination:Withdrawn 13/12/2019 10:00:00WITHDRAWN:10:00:01 13 December 2019 |
Extension / Renewal of Term | 507036 | Lodged:10:57:20 26 May 2017Applied For Period:1 YearsRECORDED:10:57:20 26 May 2017GRANTED:15 August 2017Granted Period:1 YearsTerm Extended To:28/05/2018 |
Extension / Renewal of Term | 531310 | Lodged:16:27:39 28 May 2018Applied For Period:1 YearsRECORDED:16:27:39 28 May 2018GRANTED:02 August 2018Granted Period:1 YearsTerm Extended To:28/05/2019 |
Extension / Renewal of Term | 554831 | Lodged:15:10:04 28 May 2019Applied For Period:1 YearsRECORDED:15:10:04 28 May 2019GRANTED:24 August 2020Granted Period:1 YearsTerm Extended To:28/05/2020 |
Extension / Renewal of Term | 577323 | Lodged:16:03:54 05 May 2020Applied For Period:1 YearsRECORDED:16:03:54 05 May 2020GRANTED:11 November 2020Granted Period:1 YearsTerm Extended To:28/05/2021 |
Forfeiture | 582143 | Initiated:17/07/2020 for non-compliance with rent requirementsRECORDED:09:41:55 16 July 2020Notice Issued:Regulation 50 Notice sent 17/07/2020 for non-compliance with rent requirements pursuant to Reg 109/Sec 63A- non payment of rent.Compliance Date:24/08/2020FINALISED:Order by Minister on 10 September 2020 that E 04/1131-I be Penalty Imposed |
Extension of Time | 582928 | Lodged:08:30 29 July 2020Type:Form 5RECORDED:08:30 29 July 2020APPROVED:14:02:57 29 July 2020Time to lodge extended to 6 August 2020 |
Fine | 585888 | Fine in respect to:Forfeiture Process 582143Fine reason:Non-compliance with rent obligationsPenalty amount:$211.00Notification date:11/09/2020Due date:19/10/2020Pursuant to:Section 96A(5)RECORDED:10 September 2020PAYMENT RECEIVED:19 October 2020FINALISED:19 October 2020Receipt Number:06-177889Amount:$211.00Remaining balance:$0.00 |
Withdrawal of Dealing | 589197 | Lodged:13:30 28 October 2020In respect to:Caveat 429123RECORDED:13:30 28 October 2020 |
Application to Amend | 589913 | Lodged:11:11:08 10 November 2020Amending:Address (Including DTC Details)From:Principal Place of Business : COCKATOO ISLAND MINING PTY LTD, C/- HETHERINGTON EXPLORATION & MINING TITLE SERVICES PTY LTD, PO BOX 8249, PERTH BUSINESS CENTRE, PERTH, WA, 6849 and DTC :COCKATOO ISLAND MINING PTY LTD, C/- HETHERINGTON EXPLORATION & MINING TITLE SERVICES PTY LTD, PO BOX 8249, PERTH BUSINESS CENTRE, PERTH, WA, 6849To:Principal Place of Business : COCKATOO ISLAND MINING PTY LTD, C/- HG TITLE SERVICES PTY LTD, PO BOX Z5312 ST GEORGES TERRACE, PERTH, WA, 6831 and DTC :COCKATOO ISLAND MINING PTY LTD, C/- HG TITLE SERVICES PTY LTD, PO BOX Z5312 ST GEORGES TERRACE, PERTH, WA, 6831RECORDED:11:11:08 10 November 2020 |
Application to Amend | 590209 | Lodged:14:30 11 November 2020REJECTED:14:30 11 November 2020 |
Caveat | 590530 | Lodged:11:48:31 17 November 2020Caveat Type:Consent CaveatCaveator:CHOI, Lai KuenShares Caveated:100/100 shares COCKATOO ISLAND MINING PTY LTDRECORDED:11:48:31 17 November 2020 |
Extension / Renewal of Term | 623385 | Lodged:11:01:29 26 May 2021Applied For Period:1 YearsRECORDED:11:01:29 26 May 2021GRANTED:16 August 2021Granted Period:1 YearsTerm Extended To:28/05/2022 |
Extension of Time | 629257 | Lodged:14:42:07 29 July 2021Type:Form 5RECORDED:14:42:07 29 July 2021APPROVED:16:04:05 29 July 2021Time to lodge extended to 10 August 2021 |
Extension of Time | 630128 | Lodged:10:27:46 12 August 2021Type:Form 5RECORDED:10:27:46 12 August 2021APPROVED:11:30:36 12 August 2021Time to lodge extended to 12 August 2021 |
Extension / Renewal of Term | 650324 | Lodged:08:30 27 May 2022Applied For Period:1 YearsRECORDED:08:30 27 May 2022GRANTED:18 August 2022Granted Period:1 YearsTerm Extended To:28/05/2023 |
Conversion | 650936 | New Tenement:G 04/52Application Date:16:28:51 03 Jun 2022Section:S67Converted 00:00 08 June 2023 being commencement of term of G 04/52 |
Extension / Renewal of Term | 677023 | Lodged:13:59:57 26 May 2023Applied For Period:1 YearsRECORDED:13:59:57 26 May 2023GRANTED:05 September 2023Granted Period:1 YearsTerm Extended To:28/05/2024 |
Extension / Renewal of Term | 705013 | Lodged:09:37:24 27 May 2024Applied For Period:1 YearsRECORDED:09:37:24 27 May 2024GRANTED:07 August 2024Granted Period:1 YearsTerm Extended To:28/05/2025 |
Extension / Renewal of Term | 734372 | Lodged:08:30 27 May 2025Applied For Period:1 YearsRECORDED:08:30 27 May 2025 |