Extracted from MTO on 15-May-2024 00:41,
last changed 21-Apr-2024.
# | Ver | Text | Start | End |
1 | 1 | All surface holes drilled for the purpose of exploration are to be capped, filled or otherwise made safe immediately after completion. | 04-Sep-2012 | |
2 | 1 | All disturbances to the surface of the land made as a result of exploration, including costeans, drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Mines and Petroleum (DMP). Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, DMP. | 04-Sep-2012 | |
3 | 1 | All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program. | 04-Sep-2012 | |
4 | 1 | Unless the written approval of the Environmental Officer, DMP is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations. | 04-Sep-2012 | |
5 | 1 | No excavation, excepting shafts, approaching closer to the Esperance Coolgardie Highway, Highway verge or the road reserve than a distance equal to twice the depth of the excavation and mining on the Esperance Coolgardie Highway or Highway verge being confined to below a depth of 30 metres from the natural surface, and on any other road or road verge, to below a depth of 15 metres from the natural surface. | 04-Sep-2012 | |
6 | 1 | The prior written consent of the Minister responsible for the Mining Act 1978 being obtained before commencing any activities in respect to the licence purposes on Water Reserve 3044. | 04-Sep-2012 | |
7 | 1 | No interference with Geodetic Survey Stations 54, 55 and 56 and mining within 15 metres thereof being confined to below a depth of 15 metres from the natural surface. | 04-Sep-2012 | |
8 | 1 | No mining within 25 metres of either side of the Gas/Petroleum pipeline contained within Petroleum Pipeline Licence Number 59 (Kambalda to Esperance) as shown in TENGRAPH.
| 04-Sep-2012 | |
9 | 1 | No surface excavation approaching closer to the boundary of the Safety Zone established by condition 8 hereof than a distance equal to three times the depth of the excavation without the prior written approval of the Director Petroleum DMP. | 04-Sep-2012 | |
10 | 1 | No interference with the drainage pattern, and no parking, storage or movement of equipment or vehicles used in the course of mining within the Safety Zone established by condition 8 hereof without the prior approval of the operators of the Gas/Petroleum pipeline. | 04-Sep-2012 | |
11 | 1 | The licensee shall not excavate, drill, install, erect, deposit or permit to be excavated, drilled, installed, erected or deposited within the Safety Zone established in condition 8 hereof, any pit, well, pavement, foundation, building, or other structure or installation, or material of any nature whatsoever without the prior written consent of the Director Petroleum DMP. | 04-Sep-2012 | |
12 | 1 | No explosives being used or stored within one hundred and fifty (150) metres of the Gas/Petroleum pipeline without the prior written consent of the Director Petroleum DMP. | 04-Sep-2012 | |
13 | 1 | Mining on the Safety Zone established in condition 8 hereof being confined to below a depth of 50 metres from the natural surface unless otherwise approved by the Director Petroleum DMP. | 04-Sep-2012 | |
14 | 1 | The rights of ingress to and egress from the pipeline easement established in condition 8 hereof being at all times preserved for employees, contractors and agents of the operators of the Gas/Petroleum pipeline. | 04-Sep-2012 | |
15 | 1 | Such further conditions as may from time to time be imposed by the Minister responsible for the Mining Act 1978 for the purpose of protecting the Gas/Petroleum pipeline. | 04-Sep-2012 | |
16 | 1 | No mining within 30 metres of either side and to a depth of 15 metres of the Rail Corridor Land 5 as shown in TENGRAPH without the prior written approval of the Minister responsible for the Mining Act 1978. | 04-Sep-2012 | |
17 | 1 | No surface excavation approaching closer to the boundary of the Safety Zone established by condition 16 hereof than a distance equal to three times the depth of the excavation without the prior written approval of the State Mining Engineer, DMP. | 04-Sep-2012 | |
18 | 1 | Mining below 15 metres from the natural surface of the land in the Safety Zone established in condition 16 hereof being approved by the State Mining Engineer, DMP in consultation with the operator of the railway on corridor land. | 04-Sep-2012 | |
19 | 1 | No interference with the drainage pattern, and no parking, storage or movement of equipment or vehicles used in the course of mining within the Safety Zone established by condition 16 hereof without the prior approval of the operator of the railway on corridor land. | 04-Sep-2012 | |
20 | 1 | The licensee not excavating, drilling, installing, erecting, depositing or permitting to be excavated, drilled, installed, erected or deposited within the Safety Zone established in condition 16 hereof, any pit, well, pavement, foundation, building, or other structure or installation, or material of any nature whatsoever without the prior written consent of the State Mining Engineer, DMP. | 04-Sep-2012 | |
21 | 1 | No explosives being used or stored within one hundred and fifty (150) metres of the rail corridor land without the prior written consent of the Director, Dangerous Goods Safety Branch, DMP. | 04-Sep-2012 | |
22 | 1 | The rights of ingress to and egress from the rail corridor land being at all times preserved to the employees, contractors and agents of the operator of the railway on corridor land, and the Public Transport Authority of WA. | 04-Sep-2012 | |
23 | 1 | Such further conditions as may from time to time be imposed by the Minister responsible for the Mining Act 1978 for the purpose of protecting the rail corridor land. | 04-Sep-2012 | |
24 | 1 | The construction and operation of the project and measures to protect the environment being carried out generally in accordance with the documents titled:- "Programme of Work for Spitfire Oil Pty Ltd on Exploration Licences 63/934 and 63/935" (Exp 8046) dated 11 December 2007 signed by Suzanne Simmons and retained on Department of Industry and Resources File No. T0415/200401
- "Programme of Work for Spitfire Oil Pty Ltd on Exploration Licences 63/947 and 63/961" (Exp 8044) dated 11 December 2007 signed by Suzanne Simmons and retained on Department of Industry and Resources File No. T3989/200401
Where a difference exists between the above document(s) and the following conditions, then the following conditions shall prevail. | 04-Sep-2012 | |
25 | 1 | The development and operation of the project being carried out in such a manner so as to create the minimum practicable disturbance to the existing vegetation and natural landform. | 04-Sep-2012 | |
| 1 | In respect to DEC - Managed Lands PNP/36 the following conditions apply: | 04-Sep-2012 | |
26 | 1 | Prior to lodgement of a Programme of Work (PoW), the licensee preparing a Conservation Management Plan (CMP) to address the conservation impacts of the proposed activities and submitting the CMP to the relevant Regional Manager of the Department of Environment and Conservation (DEC). This CMP shall be prepared pursuant to DEC-prepared "Guidelines for Conservation Management Plans Relating to Mineral Exploration on Lands Managed by the Department of Environment and Conservation" to meet the requirements of the Minister for Environment for acceptable impacts to conservation estate. A copy of the CMP and of DEC's decision on its acceptability under the guidelines is to accompany the lodgement of the PoW application with the Department of Mines and Petroleum. | 04-Sep-2012 | |
27 | 1 | At least five working days prior to accessing the reserve or proposed reserve area, unless otherwise agreed with the relevant Regional Manager of the Department of the Environment and Conservation (DEC-R), the holder providing the DEC-R with an itinerary and programme of the locations of operations on the licence area and informed at least five days in advance of any changes to that itinerary. All activities and movements shall comply with reasonable access and travel requirements of the DEC-R regarding seasonal/ground conditions | 04-Sep-2012 | |
28 | 1 | The licensee submitting to the Director of Environment, Department of Mines and Petroleum (DMP), and to the relevant Regional Manager, Department of the Environment and Conservation (DEC-R) a project completion report outlining the project operations and rehabilitation work undertaken in the programme. This report is to be submitted within six months of completion of the exploration activities.
| 04-Sep-2012 | |
Cond # | Ver | Text | Start | End |
1 | 1 | All surface holes drilled for the purpose of exploration are to be capped, filled or otherwise made safe immediately after completion. | 04-Sep-2012 | |
2 | 1 | All disturbances to the surface of the land made as a result of exploration, including costeans, drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Mines and Petroleum (DMP). Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, DMP. | 04-Sep-2012 | |
3 | 1 | All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program. | 04-Sep-2012 | |
4 | 1 | Unless the written approval of the Environmental Officer, DMP is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations. | 04-Sep-2012 | |
5 | 1 | No excavation, excepting shafts, approaching closer to the Esperance Coolgardie Highway, Highway verge or the road reserve than a distance equal to twice the depth of the excavation and mining on the Esperance Coolgardie Highway or Highway verge being confined to below a depth of 30 metres from the natural surface, and on any other road or road verge, to below a depth of 15 metres from the natural surface. | 04-Sep-2012 | |
6 | 1 | The prior written consent of the Minister responsible for the Mining Act 1978 being obtained before commencing any activities in respect to the licence purposes on Water Reserve 3044. | 04-Sep-2012 | |
7 | 1 | No interference with Geodetic Survey Stations 54, 55 and 56 and mining within 15 metres thereof being confined to below a depth of 15 metres from the natural surface. | 04-Sep-2012 | |
8 | 1 | No mining within 25 metres of either side of the Gas/Petroleum pipeline contained within Petroleum Pipeline Licence Number 59 (Kambalda to Esperance) as shown in TENGRAPH.
| 04-Sep-2012 | |
9 | 1 | No surface excavation approaching closer to the boundary of the Safety Zone established by condition 8 hereof than a distance equal to three times the depth of the excavation without the prior written approval of the Director Petroleum DMP. | 04-Sep-2012 | |
10 | 1 | No interference with the drainage pattern, and no parking, storage or movement of equipment or vehicles used in the course of mining within the Safety Zone established by condition 8 hereof without the prior approval of the operators of the Gas/Petroleum pipeline. | 04-Sep-2012 | |
11 | 1 | The licensee shall not excavate, drill, install, erect, deposit or permit to be excavated, drilled, installed, erected or deposited within the Safety Zone established in condition 8 hereof, any pit, well, pavement, foundation, building, or other structure or installation, or material of any nature whatsoever without the prior written consent of the Director Petroleum DMP. | 04-Sep-2012 | |
12 | 1 | No explosives being used or stored within one hundred and fifty (150) metres of the Gas/Petroleum pipeline without the prior written consent of the Director Petroleum DMP. | 04-Sep-2012 | |
13 | 1 | Mining on the Safety Zone established in condition 8 hereof being confined to below a depth of 50 metres from the natural surface unless otherwise approved by the Director Petroleum DMP. | 04-Sep-2012 | |
14 | 1 | The rights of ingress to and egress from the pipeline easement established in condition 8 hereof being at all times preserved for employees, contractors and agents of the operators of the Gas/Petroleum pipeline. | 04-Sep-2012 | |
15 | 1 | Such further conditions as may from time to time be imposed by the Minister responsible for the Mining Act 1978 for the purpose of protecting the Gas/Petroleum pipeline. | 04-Sep-2012 | |
16 | 1 | No mining within 30 metres of either side and to a depth of 15 metres of the Rail Corridor Land 5 as shown in TENGRAPH without the prior written approval of the Minister responsible for the Mining Act 1978. | 04-Sep-2012 | |
17 | 1 | No surface excavation approaching closer to the boundary of the Safety Zone established by condition 16 hereof than a distance equal to three times the depth of the excavation without the prior written approval of the State Mining Engineer, DMP. | 04-Sep-2012 | |
18 | 1 | Mining below 15 metres from the natural surface of the land in the Safety Zone established in condition 16 hereof being approved by the State Mining Engineer, DMP in consultation with the operator of the railway on corridor land. | 04-Sep-2012 | |
19 | 1 | No interference with the drainage pattern, and no parking, storage or movement of equipment or vehicles used in the course of mining within the Safety Zone established by condition 16 hereof without the prior approval of the operator of the railway on corridor land. | 04-Sep-2012 | |
20 | 1 | The licensee not excavating, drilling, installing, erecting, depositing or permitting to be excavated, drilled, installed, erected or deposited within the Safety Zone established in condition 16 hereof, any pit, well, pavement, foundation, building, or other structure or installation, or material of any nature whatsoever without the prior written consent of the State Mining Engineer, DMP. | 04-Sep-2012 | |
21 | 1 | No explosives being used or stored within one hundred and fifty (150) metres of the rail corridor land without the prior written consent of the Director, Dangerous Goods Safety Branch, DMP. | 04-Sep-2012 | |
22 | 1 | The rights of ingress to and egress from the rail corridor land being at all times preserved to the employees, contractors and agents of the operator of the railway on corridor land, and the Public Transport Authority of WA. | 04-Sep-2012 | |
23 | 1 | Such further conditions as may from time to time be imposed by the Minister responsible for the Mining Act 1978 for the purpose of protecting the rail corridor land. | 04-Sep-2012 | |
24 | 1 | The construction and operation of the project and measures to protect the environment being carried out generally in accordance with the documents titled:- "Programme of Work for Spitfire Oil Pty Ltd on Exploration Licences 63/934 and 63/935" (Exp 8046) dated 11 December 2007 signed by Suzanne Simmons and retained on Department of Industry and Resources File No. T0415/200401
- "Programme of Work for Spitfire Oil Pty Ltd on Exploration Licences 63/947 and 63/961" (Exp 8044) dated 11 December 2007 signed by Suzanne Simmons and retained on Department of Industry and Resources File No. T3989/200401
Where a difference exists between the above document(s) and the following conditions, then the following conditions shall prevail. | 04-Sep-2012 | |
25 | 1 | The development and operation of the project being carried out in such a manner so as to create the minimum practicable disturbance to the existing vegetation and natural landform. | 04-Sep-2012 | |
| 1 | In respect to DEC - Managed Lands PNP/36 the following conditions apply: | 04-Sep-2012 | |
26 | 1 | Prior to lodgement of a Programme of Work (PoW), the licensee preparing a Conservation Management Plan (CMP) to address the conservation impacts of the proposed activities and submitting the CMP to the relevant Regional Manager of the Department of Environment and Conservation (DEC). This CMP shall be prepared pursuant to DEC-prepared "Guidelines for Conservation Management Plans Relating to Mineral Exploration on Lands Managed by the Department of Environment and Conservation" to meet the requirements of the Minister for Environment for acceptable impacts to conservation estate. A copy of the CMP and of DEC's decision on its acceptability under the guidelines is to accompany the lodgement of the PoW application with the Department of Mines and Petroleum. | 04-Sep-2012 | |
27 | 1 | At least five working days prior to accessing the reserve or proposed reserve area, unless otherwise agreed with the relevant Regional Manager of the Department of the Environment and Conservation (DEC-R), the holder providing the DEC-R with an itinerary and programme of the locations of operations on the licence area and informed at least five days in advance of any changes to that itinerary. All activities and movements shall comply with reasonable access and travel requirements of the DEC-R regarding seasonal/ground conditions | 04-Sep-2012 | |
28 | 1 | The licensee submitting to the Director of Environment, Department of Mines and Petroleum (DMP), and to the relevant Regional Manager, Department of the Environment and Conservation (DEC-R) a project completion report outlining the project operations and rehabilitation work undertaken in the programme. This report is to be submitted within six months of completion of the exploration activities.
| 04-Sep-2012 | |
Type | Number | Details |
Application to Amend | 392949 | Lodged:15:00 08 March 2012To:Corner_ID
MGA94_Z51_E MGA94_51_N
1,363486.68 6388425.53
2,356165.62 6388322.54
3,354602.03 6388299.84
4,354629.01 6386452.00
5,354670.70 6383680.17
6,351543.80 6383634.06
7,351605.87 6379476.35
8,351215.29 6379470.51
9,351270.67 6375774.77
10,349318.66 6375745.32
11,349349.07 6373743.37
12,347397.35 6373713.53
13,347425.81 6371865.58
14,347451.90 6370171.74
15,349793.04 6370207.53
16,349814.07 6368821.60
17,349855.84 6364648.52
18,349156.76 6364647.18
19,349684.26 6359810.52
20,348787.04 6359440.40
21,348827.65 6356792.17
22,350523.80 6356818.04
23,353503.57 6356862.78
24,353476.11 6358710.70
25,353426.65 6362040.79
26,354983.26 6362063.77
27,355007.88 6360581.65
28,358126.29 6360626.97
29,358083.79 6363584.44
30,357302.80 6363576.81
31,357266.36 6366159.43
32,356486.57 6366148.14
33,356478.51 6366704.04
34,355615.47 6366691.19
35,354891.66 6368472.71
36,354706.38 6368397.24
37,354698.79 6368415.86
38,354698.28 6368415.71
39,354264.23 6369481.03
40,354096.37 6369512.40
41,354051.15 6372581.53
42,355612.20 6Amending:BoundaryTo:372604.40
43,355558.38 6376300.11
44,355869.11 6376304.58
45,355838.75 6375443.54
46,356558.63 6375802.86
47,357730.55 6375697.26
48,357828.36 6376147.35
49,359172.34 6376100.10
50,359078.21 6376967.50
51,359453.88 6376972.96
52,359449.53 6377280.14
53,361011.35 6377302.13
54,360966.79 6380494.92
55,360958.14 6380993.75
56,362522.02 6381019.55
57,362496.46 6382867.39
58,363201.59 6382877.11
59,363474.75 6388317.00
60,363486.68 6388425.53RECORDED:15:00 08 March 2012 |
Bond Requirement | 405325 | Requirement Date:05/09/2012Amount:$45,000.00RECORDED:11:25:04 05 September 2012FINALISED:11:09:50 13 May 2014 |
Bond | 407311 | Lodged:13:00 03 October 2012Bond Type:Unconditional Performance BondBond Amount:$45,000.00RECORDED:03 October 2012RETIRED - MRF:13 May 2014 |
Extension / Renewal of Term | 513437 | Lodged:10:08:43 30 August 2017Applied For Period:5 YearsRECORDED:10:08:43 30 August 2017GRANTED:08 February 2018Granted Period:2 YearsTerm Renewed To:03/09/2019 |
Surrender - Outright | 562025 | Lodged:13:31:42 30 August 2019REGISTERED:13:31:42 30 August 2019 |