Cache entry for E 25/553

Extracted from MTO on 28-Oct-2020 03:59, last changed 27-Jun-2020.

Tenement Summary

Identifier:E 25/553Type:Exploration Licence
Status:LiveDistrict:BULONG
Lodged:ONLINEArea:26 BL
Purposes:Term:5 Years
Markout:Received:31-Aug-2016 15:35
Commence:03-Apr-2017 Expiry:02-Apr-2022

Holders

Company NameSharesTotal Shares
ARUMA EXPLORATION PTY LTD100100

Applicants on Receival

Company NameSharesTotal Shares
ARUMA EXPLORATION PTY LTD100100

Shires

Shire NameShire NumberStartArea
KALGOORLIE-BOULDER CITY428031-Aug-2016 26.00000 BL

Conditions

#VerTextStartEnd
11All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program.03-Apr-2017
21Unless the written approval of the Environmental Officer, DMP is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations.03-Apr-2017
31The Licensee notifying the holder of any underlying pastoral or grazing lease by telephone or in person, or by registered post if contact cannot be made, prior to undertaking airborne geophysical surveys or any ground disturbing activities utilising equipment such as scrapers, graders, bulldozers, backhoes, drilling rigs; water carting equipment or other mechanised equipment.03-Apr-2017
41The Licensee or transferee, as the case may be, shall within thirty (30) days of receiving written notification of:-
  • the grant of the Licence; or
  • registration of a transfer introducing a new Licensee;
advise, by registered post, the holder of any underlying pastoral or grazing lease details of the grant or transfer.
03-Apr-2017
51All disturbances to the surface of the land made as a result of exploration, including costeans, drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Mines and Petroleum (DMP). Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, DMP.03-Apr-2017

Endorsements

Cond #VerTextStartEnd
11All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program.03-Apr-2017
21Unless the written approval of the Environmental Officer, DMP is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations.03-Apr-2017
31The Licensee notifying the holder of any underlying pastoral or grazing lease by telephone or in person, or by registered post if contact cannot be made, prior to undertaking airborne geophysical surveys or any ground disturbing activities utilising equipment such as scrapers, graders, bulldozers, backhoes, drilling rigs; water carting equipment or other mechanised equipment.03-Apr-2017
41The Licensee or transferee, as the case may be, shall within thirty (30) days of receiving written notification of:-
  • the grant of the Licence; or
  • registration of a transfer introducing a new Licensee;
advise, by registered post, the holder of any underlying pastoral or grazing lease details of the grant or transfer.
03-Apr-2017
51All disturbances to the surface of the land made as a result of exploration, including costeans, drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Mines and Petroleum (DMP). Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, DMP.03-Apr-2017

Dealings

TypeNumberDetails
Excess Tonnage506869Lodged:10:00 19 May 2017RECORDED:10:00 19 May 2017GRANTED:09:43:35 24 May 2017

Payments

TypeYearReceipt DateReceipt No.MR LodgedAmountRental AreaEffective DateAmt DueDiscrepancy
Rental202120-Mar-2020 10138005$6,058.0026 BL03-Apr-2017 $6,058.00$0.00
Rental202004-Mar-2019 10087857$3,536.0026 BL03-Apr-2017 $3,536.00$0.00
Rental201905-Apr-2018 82549545086$3,484.0026 BL03-Apr-2017 $3,484.00$0.00
Rental201831-Aug-2016 66569546143$3,367.0026 BL03-Apr-2017 $3,367.00$0.00

Expenditure

YearForm 5 TypeMin ExpdExp Lodged DateTotal ExpdExemp NoExemp LodgedExemp AmtExemp StatusOutcome DateExploration ActivitiesMining ActivitiesAboriginal SurveyRentAdministrationProspectingStrike Through
2021$39,000.00false
2020$26,000.0026-May-2020 $52,451.00$41,780.00$0.00$0.00$7,681.00$2,990.00$0.00false
2019$26,000.0004-Jun-2019 $266,215.00$259,700.00$0.00$240.00$5,136.00$1,139.00$0.00false
2018$26,000.0021-May-2018 $594,892.00$516,148.00$0.00$68,900.00$5,254.00$4,590.00$0.00false

Native Title Referrals

Referred to Native Title DateReferral TypeCurrent StatusProcedureDetailsObjectionsWater CommentsDetermination AreasClaimsRepresentative Area Bodies
24-Oct-2016 Tenement ApplicationExpedited Procedure : Native Title Cleared - Expedited AppliesExpedited Procedure2016-11-162017-03-16CLEARED - Expedited Applies2017-03-3126 BL304129S1215529E44km E'ly of Kalgoorlie13GoldfieldsNative Title Services Goldfields