Cache entry for E 21/200

Extracted from MTO on 19-Sep-2020 03:34, last changed 11-Sep-2020.

Tenement Summary

Identifier:E 21/200Type:Exploration Licence
Status:LiveDistrict:DAY DAWN
Lodged:ONLINEArea:14 BL
Purposes:Term:5 Years
Markout:Received:27-Jul-2017 13:43
Commence:16-Jul-2018 Expiry:15-Jul-2023

Holders

Company NameSharesTotal Shares
MUSGRAVE MINERALS LIMITED100100

Applicants on Receival

Company NameSharesTotal Shares
MUSGRAVE MINERALS LIMITED100100

Shires

Shire NameShire NumberStartArea
CUE SHIRE238027-Jul-2017 14.00000 BL

Conditions

#VerTextStartEnd
11All disturbances to the surface of the land made as a result of exploration, including costeans, drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, DMIRS. Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, DMIRS.16-Jul-2018
21All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program.16-Jul-2018
31Unless the written approval of the Environmental Officer, DMIRS is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations.16-Jul-2018
41The Licensee notifying the holder of any underlying pastoral or grazing lease by telephone or in person, or by registered post if contact cannot be made, prior to undertaking airborne geophysical surveys or any ground disturbing activities utilising equipment such as scrapers, graders, bulldozers, backhoes, drilling rigs; water carting equipment or other mechanised equipment.16-Jul-2018
51The Licensee or transferee, as the case may be, shall within thirty (30) days of receiving written notification of:-
  • the grant of the Licence; or
  • registration of a transfer introducing a new Licensee;
advise, by registered post, the holder of any underlying pastoral or grazing lease details of the grant or transfer.
16-Jul-2018
61No excavation, excepting shafts, approaching closer to the Great Northern Highway, Highway verge or the road reserve than a distance equal to twice the depth of the excavation and mining on the Great Northern Highway or Highway verge being confined to below a depth of 30 metres from the natural surface.16-Jul-2018
71The prior written consent of the Minister responsible for the Mining Act 1978 being obtained before commencing any exploration activities on Historic Site (Cemetery) Reserve 5222 and Mainland Townsite .16-Jul-2018

Endorsements

Cond #VerTextStartEnd
11All disturbances to the surface of the land made as a result of exploration, including costeans, drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, DMIRS. Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, DMIRS.16-Jul-2018
21All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program.16-Jul-2018
31Unless the written approval of the Environmental Officer, DMIRS is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations.16-Jul-2018
41The Licensee notifying the holder of any underlying pastoral or grazing lease by telephone or in person, or by registered post if contact cannot be made, prior to undertaking airborne geophysical surveys or any ground disturbing activities utilising equipment such as scrapers, graders, bulldozers, backhoes, drilling rigs; water carting equipment or other mechanised equipment.16-Jul-2018
51The Licensee or transferee, as the case may be, shall within thirty (30) days of receiving written notification of:-
  • the grant of the Licence; or
  • registration of a transfer introducing a new Licensee;
advise, by registered post, the holder of any underlying pastoral or grazing lease details of the grant or transfer.
16-Jul-2018
61No excavation, excepting shafts, approaching closer to the Great Northern Highway, Highway verge or the road reserve than a distance equal to twice the depth of the excavation and mining on the Great Northern Highway or Highway verge being confined to below a depth of 30 metres from the natural surface.16-Jul-2018
71The prior written consent of the Minister responsible for the Mining Act 1978 being obtained before commencing any exploration activities on Historic Site (Cemetery) Reserve 5222 and Mainland Townsite .16-Jul-2018

Dealings

TypeNumberDetails
Objection512354Lodged:14:30 10 August 2017Objectors:RICHARDS, ChristopherObjection Type:Tenement ApplicationRECORDED:14:30 10 August 2017WITHDRAWN:10:30 19 October 2017Wardens Decision Made on:10:30 19 October 2017Wardens Decision Status:Dismissed

Payments

TypeYearReceipt DateReceipt No.MR LodgedAmountRental AreaEffective DateAmt DueDiscrepancy
Rental202103-Jul-2020 10151898$1,974.0014 BL16-Jul-2018 $1,974.00$0.00
Rental202002-Jul-2019 10103461$1,932.0014 BL16-Jul-2018 $1,932.00$0.00
Rental201927-Jul-2017 75595436088$1,876.0014 BL16-Jul-2018 $1,876.00$0.00

Expenditure

YearForm 5 TypeMin ExpdExp Lodged DateTotal ExpdExemp NoExemp LodgedExemp AmtExemp StatusOutcome DateExploration ActivitiesMining ActivitiesAboriginal SurveyRentAdministrationProspectingStrike Through
2021$20,000.00false
2020$20,000.0008-Sep-2020 $209,583.00$163,464.00$0.00$8,695.00$3,680.00$33,744.00$0.00false
2019$20,000.0006-Sep-2019 $139,721.00$135,016.00$0.00$0.00$3,304.00$1,401.00$0.00false

Native Title Referrals

Referred to Native Title DateReferral TypeCurrent StatusProcedureDetailsObjectionsWater CommentsDetermination AreasClaimsRepresentative Area Bodies
21-Nov-2017 Tenement ApplicationExpedited Procedure : Native Title Cleared - Expedited AppliesExpedited Procedure2017-12-132018-04-13CLEARED - Expedited Applies2018-06-1814 BL273529S1175629E19km S'ly of CueWO2017/08642017-12-21WC1999/010Objection Withdrawn Agreement2018-03-20WO2018/02112018-04-03WC1999/046Objection Withdrawn2018-06-18Wutha(WC1999/010)WC1999/010WAD6064/1998trueDismissedYugunga-Nya People (Unregistered)(WC1999/046)WC1999/046WAD29/2019trueNot Accepted14GeraldtonYamatji Marlpa Aboriginal Corporation