1 | 1 | All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program. | 08-Dec-2016 | |
2 | 1 | Unless the written approval of the Environmental Officer, DMP is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations. | 08-Dec-2016 | |
3 | 1 | The Licensee notifying the holder of any underlying pastoral or grazing lease by telephone or in person, or by registered post if contact cannot be made, prior to undertaking airborne geophysical surveys or any ground disturbing activities utilising equipment such as scrapers, graders, bulldozers, backhoes, drilling rigs; water carting equipment or other mechanised equipment. | 08-Dec-2016 | |
4 | 1 | The Licensee or transferee, as the case may be, shall within thirty (30) days of receiving written notification of:-- the grant of the Licence; or
- registration of a transfer introducing a new Licensee;
advise, by registered post, the holder of any underlying pastoral or grazing lease details of the grant or transfer. | 08-Dec-2016 | |
5 | 1 | The rights of ingress to and egress from Miscellaneous Licence 59/142 being at all times preserved to the licensee and no interference with the purpose or installations connected to the licence. | 08-Dec-2016 | |
6 | 1 | No interference with Geodetic Survey Station SSM-CUE 66 & SSM-K1 and mining within 15 metres thereof being confined to below a depth of 15 metres from the natural surface. | 08-Dec-2016 | |
| 1 | In respect to the area designated as CPL 0000063 in TENGRAPH the following conditions apply: | 08-Dec-2016 | |
7 | 1 | Prior to any ground-disturbing activity, as defined by the Executive Director, Environment Division, DMP the licensee preparing a detailed program for each phase of proposed exploration for approval of the Executive Director, Environment Division, DMP. The program to include:- maps and/or aerial photographs showing all proposed routes, construction and upgrading of tracks, camps, drill sites and any other disturbances;
- the purpose, specifications and life of all proposed disturbances;
- proposals which may disturb any declared rare or geographically restricted flora and fauna; and
- techniques, prescriptions and timetable for the rehabilitation of all proposed disturbances
| 08-Dec-2016 | |
8 | 1 | The licensee, at his expense, rehabilitating all areas cleared, explored or otherwise disturbed during the term of the licence to the satisfaction of the Executive Director, Environment Division, DMP. Such rehabilitation as is appropriate and may include:- stockpiling and return of topsoil;
- backfilling all holes, trenches and costeans;
- ripping;
- contouring to the original landform;
- revegetation with seed; and
- capping and backfilling of all drill holes.
| 08-Dec-2016 | |
9 | 1 | Prior to the cessation of exploration/prospecting activity the licensee notifying the Environmental Officer, DMP and arranging an inspection as required. | 08-Dec-2016 | |
Cond # | Ver | Text | Start | End |
1 | 1 | All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program. | 08-Dec-2016 | |
2 | 1 | Unless the written approval of the Environmental Officer, DMP is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations. | 08-Dec-2016 | |
3 | 1 | The Licensee notifying the holder of any underlying pastoral or grazing lease by telephone or in person, or by registered post if contact cannot be made, prior to undertaking airborne geophysical surveys or any ground disturbing activities utilising equipment such as scrapers, graders, bulldozers, backhoes, drilling rigs; water carting equipment or other mechanised equipment. | 08-Dec-2016 | |
4 | 1 | The Licensee or transferee, as the case may be, shall within thirty (30) days of receiving written notification of:-- the grant of the Licence; or
- registration of a transfer introducing a new Licensee;
advise, by registered post, the holder of any underlying pastoral or grazing lease details of the grant or transfer. | 08-Dec-2016 | |
5 | 1 | The rights of ingress to and egress from Miscellaneous Licence 59/142 being at all times preserved to the licensee and no interference with the purpose or installations connected to the licence. | 08-Dec-2016 | |
6 | 1 | No interference with Geodetic Survey Station SSM-CUE 66 & SSM-K1 and mining within 15 metres thereof being confined to below a depth of 15 metres from the natural surface. | 08-Dec-2016 | |
| 1 | In respect to the area designated as CPL 0000063 in TENGRAPH the following conditions apply: | 08-Dec-2016 | |
7 | 1 | Prior to any ground-disturbing activity, as defined by the Executive Director, Environment Division, DMP the licensee preparing a detailed program for each phase of proposed exploration for approval of the Executive Director, Environment Division, DMP. The program to include:- maps and/or aerial photographs showing all proposed routes, construction and upgrading of tracks, camps, drill sites and any other disturbances;
- the purpose, specifications and life of all proposed disturbances;
- proposals which may disturb any declared rare or geographically restricted flora and fauna; and
- techniques, prescriptions and timetable for the rehabilitation of all proposed disturbances
| 08-Dec-2016 | |
8 | 1 | The licensee, at his expense, rehabilitating all areas cleared, explored or otherwise disturbed during the term of the licence to the satisfaction of the Executive Director, Environment Division, DMP. Such rehabilitation as is appropriate and may include:- stockpiling and return of topsoil;
- backfilling all holes, trenches and costeans;
- ripping;
- contouring to the original landform;
- revegetation with seed; and
- capping and backfilling of all drill holes.
| 08-Dec-2016 | |
9 | 1 | Prior to the cessation of exploration/prospecting activity the licensee notifying the Environmental Officer, DMP and arranging an inspection as required. | 08-Dec-2016 | |
Type | Number | Details |
Application to Amend | 505946 | Lodged:15:53:38 08 May 2017Amending:Address (Including DTC Details)From:Principal Place of Business : GASCOYNE RESOURCES LIMITED, 2ND FLOOR , 33 ORD STREET, WEST PERTH, WA, 6005 and DTC :GASCOYNE RESOURCES LIMITED, C/- STS, PO BOX 1340, WEST PERTH, WA, 6872To:Principal Place of Business : GASCOYNE RESOURCES LIMITED, C/- STS, PO BOX 1340, WEST PERTH, WA, 6872, xxxx@strategictenements.com, xxxxxxx036 and DTC :GASCOYNE RESOURCES LIMITED, STS, C/- STS, PO BOX 1340, WEST PERTH, WA, 6872, xxxx@strategictenements.com, xxxxxxx036REJECTED:15:53:38 08 May 2017 |
Application to Amend | 506176 | Lodged:09:37:23 12 May 2017Amending:Address (Including DTC Details)From:Principal Place of Business : GASCOYNE RESOURCES LIMITED, 2ND FLOOR , 33 ORD STREET, WEST PERTH, WA, 6005 and DTC :GASCOYNE RESOURCES LIMITED, C/- STS, PO BOX 1340, WEST PERTH, WA, 6872To:Principal Place of Business : GASCOYNE RESOURCES LIMITED, C/- STS, PO BOX 1340, WEST PERTH, WA, 6872, xxxx@strategictenements.com, xxxxxxx036 and DTC :GASCOYNE RESOURCES LIMITED, STS, C/- STS, PO BOX 1340, WEST PERTH, WA, 6872, xxxx@strategictenements.com, xxxxxxx036RECORDED:09:37:23 12 May 2017 |
Extension / Renewal of Term | 637026 | Lodged:15:46:10 06 December 2021Applied For Period:5 YearsRECORDED:15:46:10 06 December 2021GRANTED:27 April 2022Granted Period:5 YearsTerm Extended To:07/12/2026 |