Cache entry for E 20/873

Extracted from MTO on 20-Sep-2020 03:41, last changed 21-Aug-2020.

Tenement Summary

Identifier:E 20/873Type:Exploration Licence
Status:LiveDistrict:CUE
Lodged:PERTHArea:1 BL
Purposes:Term:5 Years
Markout:Received:12-May-2015 12:40
Commence:01-Jun-2016 Expiry:31-May-2021

Holders

Company NameSharesTotal Shares
ZEEDAM ENTERPRISES PTY LTD100100

Applicants on Receival

Company NameSharesTotal Shares
ZEEDAM ENTERPRISES PTY LTD100100

Shires

Shire NameShire NumberStartArea
CUE SHIRE238012-May-2015 1.00000 BL

Conditions

#VerTextStartEnd
11All surface holes drilled for the purpose of exploration are to be capped, filled or otherwise made safe immediately after completion.01-Jun-2016
21All disturbances to the surface of the land made as a result of exploration, including costeans, drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Mines and Petroleum (DMP). Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, DMP.01-Jun-2016
31All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program.01-Jun-2016
41Unless the written approval of the Environmental Officer, DMP is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations.01-Jun-2016
51The Licensee notifying the holder of any underlying pastoral or grazing lease by telephone or in person, or by registered post if contact cannot be made, prior to undertaking airborne geophysical surveys or any ground disturbing activities utilising equipment such as scrapers, graders, bulldozers, backhoes, drilling rigs; water carting equipment or other mechanised equipment.01-Jun-2016
61The Licensee or transferee, as the case may be, shall within thirty (30) days of receiving written notification of:-
  • the grant of the Licence; or
  • registration of a transfer introducing a new Licensee;
advise, by registered post, the holder of any underlying pastoral or grazing lease details of the grant or transfer.
01-Jun-2016
71No activities being carried out within the proposed railway corridor (designated FNA 9031 ) that interfere with or restrict any rail route investigation activities being undertaken by the rail line proponent.01-Jun-2016

Endorsements

Cond #VerTextStartEnd
11All surface holes drilled for the purpose of exploration are to be capped, filled or otherwise made safe immediately after completion.01-Jun-2016
21All disturbances to the surface of the land made as a result of exploration, including costeans, drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Mines and Petroleum (DMP). Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, DMP.01-Jun-2016
31All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program.01-Jun-2016
41Unless the written approval of the Environmental Officer, DMP is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations.01-Jun-2016
51The Licensee notifying the holder of any underlying pastoral or grazing lease by telephone or in person, or by registered post if contact cannot be made, prior to undertaking airborne geophysical surveys or any ground disturbing activities utilising equipment such as scrapers, graders, bulldozers, backhoes, drilling rigs; water carting equipment or other mechanised equipment.01-Jun-2016
61The Licensee or transferee, as the case may be, shall within thirty (30) days of receiving written notification of:-
  • the grant of the Licence; or
  • registration of a transfer introducing a new Licensee;
advise, by registered post, the holder of any underlying pastoral or grazing lease details of the grant or transfer.
01-Jun-2016
71No activities being carried out within the proposed railway corridor (designated FNA 9031 ) that interfere with or restrict any rail route investigation activities being undertaken by the rail line proponent.01-Jun-2016

Dealings

TypeNumberDetails
Iron Ore Inclusion584572Lodged:13:30 20 August 2020RECORDED:13:30 20 August 2020

Payments

TypeYearReceipt DateReceipt No.MR LodgedAmountRental AreaEffective DateAmt DueDiscrepancy
Rental202103-Jun-2020 54160314038$361.001 BL01-Jun-2016 $361.00$0.00
Rental202012-Jun-2019 10100338$341.001 BL01-Jun-2016 $341.00$0.00
Rental201928-Jun-2018 84813863445$322.001 BL01-Jun-2016 $322.00$0.00
Rental201814-Jun-2017 06-160967PERTH$311.601 BL01-Jun-2016 $311.60$0.00
Rental201712-May-2015 06-145305PERTH$293.701 BL01-Jun-2016 $293.70$0.00

Expenditure

YearForm 5 TypeMin ExpdExp Lodged DateTotal ExpdExemp NoExemp LodgedExemp AmtExemp StatusOutcome DateExploration ActivitiesMining ActivitiesAboriginal SurveyRentAdministrationProspectingStrike Through
2021$10,000.00false
2020$10,000.0003-Jun-2020 $10,392.00$8,400.00$0.00$0.00$792.00$1,200.00$0.00false
2019$10,000.0002-Jul-2019 $10,252.00$0.00$0.00$0.00$0.00$0.00$10,252.00false
2018$10,000.0028-Jun-2018 $11,333.00$0.00$0.00$0.00$0.00$0.00$11,333.00false
2017$10,000.0007-Jul-2017 $10,944.00$0.00$0.00$0.00$734.00$1,500.00$8,710.00false

Native Title Referrals

Referred to Native Title DateReferral TypeCurrent StatusProcedureDetailsObjectionsWater CommentsDetermination AreasClaimsRepresentative Area Bodies
21-Jul-2015 Tenement ApplicationExpedited Procedure : Native Title Cleared - Expedited AppliesExpedited Procedure2015-08-122015-12-12CLEARED - Expedited Applies2016-05-301 BL27230S1172829E59km NW'ly of CueWO2015/09472015-11-30WC2004/010Objection Withdrawn Agreement2016-05-27Wajarri Yamatji #1(WC2004/010)WC2004/010WAD28/2019trueDetermined14GeraldtonYamatji Marlpa Aboriginal Corporation