Cache entry for E 20/634

Extracted from MTO on 28-Oct-2020 05:11, last changed 17-Oct-2020.

Tenement Summary

Identifier:E 20/634-IType:Exploration Licence
Status:LiveDistrict:CUE
Lodged:MT. MAGNETArea:2 BL
Purposes:Term:5 Years (Extended)
Markout:Received:24-Mar-2006 08:30
Commence:29-Sep-2010 Expiry:28-Sep-2020

Holders

Company NameSharesTotal Shares
SINOSTEEL MIDWEST CORPORATION LIMITED100100

Applicants on Receival

Company NameSharesTotal Shares
MIDWEST CORPORATION LIMITED100100

Relationships

Relationship TypeDealingDealing StatusTenementTenement Status
Section 120AAConversion 304811FinalisedM 20/493Dead

Shires

Shire NameShire NumberStartArea
MEEKATHARRA SHIRE525024-Mar-2006 2.00000 BL

Conditions

#VerTextStartEnd
11All surface holes drilled for the purpose of exploration are to be capped, filled or otherwise made safe immediately after completion.29-Sep-2010
21All disturbances to the surface of the land made as a result of exploration, including costeans, drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Mines and Petroleum (DMP). Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, DMP.29-Sep-2010
31All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program.29-Sep-2010
41Unless the written approval of the Environmental Officer, DMP is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations.29-Sep-2010
51The Licensee notifying the holder of any underlying pastoral or grazing lease by telephone or in person, or by registered post if contact cannot be made, prior to undertaking airborne geophysical surveys or any ground disturbing activities utilising equipment such as scrapers, graders, bulldozers, backhoes, drilling rigs; water carting equipment or other mechanised equipment.29-Sep-2010
61The Licensee or transferee, as the case may be, shall within thirty (30) days of receiving written notification of:-
  • the grant of the Licence; or
  • registration of a transfer introducing a new Licensee;
advise, by registered post, the holder of any underlying pastoral or grazing lease details of the grant or transfer.
29-Sep-2010
71No activities being carried out within the proposed railway corridor (designated FNA 9031) that interfere with or restrict any rail route investigation activities being undertaken by the rail line proponent.29-Sep-2010
82The construction and operation of the project and measures to protect the environment to be carried out in accordance with the document titled:
  • (PoW Reg ID 84792) “Sinosteel Midwest Corporation Limited – Environmental Management Plan (Exploration)” dated 11 April 2019 signed by P. Hogan, and retained on Department of Mines, Industry Regulation and Safety File No. EARS-POW-78084 as Doc ID 6517596;
  • (PoW Reg ID 84792) “Programme of Work on E 20/634-I and E 20/627-I for Sinosteel Midwest Corporation Limited” dated 19 February 2020 submitted by Matthew Neep, and retained on Department of Mines, Industry Regulation and Safety File No. EARS-POW-84792 as Doc ID 7193813
29-May-2020
81The construction and operation of the project and measures to protect the environment to be carried out in accordance with the document titled:
  • (POW Reg ID 71612) "Environmental Management Plan (Exploration)" dated October 2015 approved for issue by S. Griffths and retained on Department of Mines, Industry Regulation and Safety File No. EARS-POW-63869 as Doc ID 4758059
27-Mar-2018 28-May-2020

Endorsements

Cond #VerTextStartEnd
11All surface holes drilled for the purpose of exploration are to be capped, filled or otherwise made safe immediately after completion.29-Sep-2010
21All disturbances to the surface of the land made as a result of exploration, including costeans, drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Mines and Petroleum (DMP). Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, DMP.29-Sep-2010
31All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program.29-Sep-2010
41Unless the written approval of the Environmental Officer, DMP is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations.29-Sep-2010
51The Licensee notifying the holder of any underlying pastoral or grazing lease by telephone or in person, or by registered post if contact cannot be made, prior to undertaking airborne geophysical surveys or any ground disturbing activities utilising equipment such as scrapers, graders, bulldozers, backhoes, drilling rigs; water carting equipment or other mechanised equipment.29-Sep-2010
61The Licensee or transferee, as the case may be, shall within thirty (30) days of receiving written notification of:-
  • the grant of the Licence; or
  • registration of a transfer introducing a new Licensee;
advise, by registered post, the holder of any underlying pastoral or grazing lease details of the grant or transfer.
29-Sep-2010
71No activities being carried out within the proposed railway corridor (designated FNA 9031) that interfere with or restrict any rail route investigation activities being undertaken by the rail line proponent.29-Sep-2010
82The construction and operation of the project and measures to protect the environment to be carried out in accordance with the document titled:
  • (PoW Reg ID 84792) “Sinosteel Midwest Corporation Limited – Environmental Management Plan (Exploration)” dated 11 April 2019 signed by P. Hogan, and retained on Department of Mines, Industry Regulation and Safety File No. EARS-POW-78084 as Doc ID 6517596;
  • (PoW Reg ID 84792) “Programme of Work on E 20/634-I and E 20/627-I for Sinosteel Midwest Corporation Limited” dated 19 February 2020 submitted by Matthew Neep, and retained on Department of Mines, Industry Regulation and Safety File No. EARS-POW-84792 as Doc ID 7193813
29-May-2020
81The construction and operation of the project and measures to protect the environment to be carried out in accordance with the document titled:
  • (POW Reg ID 71612) "Environmental Management Plan (Exploration)" dated October 2015 approved for issue by S. Griffths and retained on Department of Mines, Industry Regulation and Safety File No. EARS-POW-63869 as Doc ID 4758059
27-Mar-2018 28-May-2020

Dealings

TypeNumberDetails
ObjectionMM71/056Lodged 10:12:00 AM on 04 Apr 2006 by MURCHISON METALS LTDRECORDED 10:12 AM 04 Apr 2006WITHDRAWN 11:30 AM 31 Aug 2006
ObjectionMM78/056Lodged 10:30:00 AM on 18 Apr 2006 by ST. BARBARA LTDRECORDED 10:30 AM 18 Apr 2006WITHDRAWN 10:00 AM 21 Sep 2007
Application to Amend316907Lodged:15:00 30 March 2009Amending:NameFrom:MIDWEST CORPORATION LTDTo:SINOSTEEL MIDWEST CORPORATION LIMITEDRECORDED:15:00 30 March 2009
Extension / Renewal of Term474561Lodged:08:30 18 September 2015Applied For Period:5 YearsRECORDED:08:30 18 September 2015GRANTED:20 November 2015Granted Period:5 YearsTerm Extended To:28/09/2020
Application to Amend490195Lodged:13:03:58 07 July 2016Amending:Address (Including DTC Details)From:SINOSTEEL MIDWEST CORPORATION LIMITED, C/- HETHERINGTON EXPLORATION & MINING TITLE SERVICES PTY LTD, PO BOX 8249, PERTH BUSINESS CENTRE, WA, 6849To:SINOSTEEL MIDWEST CORPORATION LIMITED, HETHERINGTON EXPLORATION & MINING TITLE SERVICES (WA) PTY LTD, PO BOX 8249, PERTH BUSINESS CENTRE, PERTH, WA, 6849, xxxxx@hemts.com.au, xxxxx977RECORDED:13:03:58 07 July 2016
Extension of Time519047Lodged:16:03:11 24 November 2017Type:Form 5RECORDED:16:03:11 24 November 2017APPROVED:17:02:59 01 December 2017Time to lodge extended to 15 Dec 2017
Excess Tonnage523325Lodged:15:24:04 09 February 2018RECORDED:15:24:04 09 February 2018GRANTED:09:32:51 09 March 2018For an additional 950 tonnes
Excess Tonnage570610Lodged:10:00:44 21 January 2020RECORDED:10:00:44 21 January 2020GRANTED:12:15:36 28 April 2020For an additional 686 tonnes
Extension / Renewal of Term586979Lodged:12:48:03 24 September 2020Applied For Period:2 YearsRECORDED:12:48:03 24 September 2020

Payments

TypeYearReceipt DateReceipt No.MR LodgedAmountRental AreaEffective DateAmt DueDiscrepancy
Rental202115-Oct-2020 10167940$1,230.002 BL29-Sep-2010 $1,230.00$0.00
Rental202030-Aug-2019 10112649$1,202.002 BL29-Sep-2010 $1,202.00$0.00
Rental201931-Aug-2018 7724899872$1,134.002 BL29-Sep-2010 $1,134.00$0.00
Rental201831-Aug-2017 9464908509$1,070.002 BL29-Sep-2010 $1,070.00$0.00
Rental201731-Aug-2016 MT-210010726420-EF$546.702 BL29-Sep-2010 $546.70$0.00
Rental201616-Sep-2015 MT-210010371450-EF$528.702 BL29-Sep-2010 $528.70$0.00
Rental201519-Sep-2014 MT-210010205075-EF$379.802 BL29-Sep-2010 $379.80$0.00
Rental201416-Sep-2013 MT-210010133241-EF$370.202 BL29-Sep-2010 $370.20$0.00
Rental201314-Sep-2012 MT-210010063893-EF$233.402 BL29-Sep-2010 $233.40$0.00
Rental201220-Sep-2011 100323PERTH$227.002 BL29-Sep-2010 $227.00$0.00
Rental201129-Sep-2010 (REFUND) 4097PERTH$184.402 BL29-Sep-2010 $202.84$0.00
Rental201128-Sep-2010 14769MT. MAGNET$18.44
Rental201124-Mar-2006 4097MT. MAGNET$368.80

Expenditure

YearForm 5 TypeMin ExpdExp Lodged DateTotal ExpdExemp NoExemp LodgedExemp AmtExemp StatusOutcome DateExploration ActivitiesMining ActivitiesAboriginal SurveyRentAdministrationProspectingStrike Through
2021$50,000.00false
2020$50,000.00false
2019$50,000.0019-Nov-2019 $78,074.88$63,578.40$0.00$0.00$1,484.00$13,012.48$0.00false
2018$50,000.0027-Nov-2018 $92,027.18$71,174.43$0.00$4,030.89$1,484.00$15,337.86$0.00false
2017$30,000.0029-Nov-2017 $38,489.00$23,994.00$0.00$7,184.00$897.00$6,414.00$0.00false
2016$30,000.0012-Oct-2016 $38,512.00$31,215.00$0.00$0.00$879.00$6,418.00$0.00false
2015$20,000.0020-Oct-2015 $36,702.00$31,972.00$0.00$0.00$730.00$4,000.00$0.00false
2014$20,000.0014-Nov-2014 $39,915.00$33,120.00$0.00$2,150.00$645.00$4,000.00$0.00false
2013$15,000.0023-Oct-2013 $41,412.97$37,904.57$0.00$0.00$508.40$3,000.00$0.00false
2012$15,000.0017-Oct-2012 $38,959.00$35,432.00$0.00$0.00$527.00$3,000.00$0.00false
2011$15,000.0015-Nov-2011 $33,630.00$29,969.00$0.00$0.00$661.00$3,000.00$0.00false

Native Title Referrals

Referred to Native Title DateReferral TypeCurrent StatusProcedureDetailsObjectionsWater CommentsDetermination AreasClaimsRepresentative Area Bodies
16-Mar-2010 Tenement ApplicationNT Cleared