Cache entry for E 16/480

Extracted from MTO on 26-Nov-2020 04:07, last changed 23-Sep-2020.

Tenement Summary

Identifier:E 16/480Type:Exploration Licence
Status:LiveDistrict:KUNANALLING
Lodged:ONLINEArea:11 BL
Purposes:Term:5 Years
Markout:Received:21-Jul-2015 08:30
Commence:02-May-2016 Expiry:01-May-2021

Holders

Company NameSharesTotal Shares
CARNEGIE GOLD PTY LTD100100

Applicants on Receival

Company NameSharesTotal Shares
GOLDSTAR RESOURCES (WA) PTY LTD100100

Shires

Shire NameShire NumberStartArea
COOLGARDIE SHIRE196021-Jul-2015 9.00000 BL
MENZIES SHIRE539021-Jul-2015 2.00000 BL

Conditions

#VerTextStartEnd
11All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program.02-May-2016
21Unless the written approval of the Environmental Officer, DMP is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations.02-May-2016
1In respect to the area designated as CPL 50 in TENGRAPH the following conditions apply:02-May-2016
31Prior to any ground-disturbing activity, as defined by the Executive Director, Environment Division, DMP the licensee preparing a detailed program for each phase of proposed exploration for approval of the Executive Director, Environment Division, DMP. The program to include:
  • maps and/or aerial photographs showing all proposed routes, construction and upgrading of tracks, camps, drill sites and any other disturbances;
  • the purpose, specifications and life of all proposed disturbances;
  • proposals which may disturb any declared rare or geographically restricted flora and fauna; and
  • techniques, prescriptions and timetable for the rehabilitation of all proposed disturbances
02-May-2016
41The licensee, at his expense, rehabilitating all areas cleared, explored or otherwise disturbed during the term of the licence to the satisfaction of the Executive Director, Environment Division, DMP. Such rehabilitation as is appropriate and may include:
  • stockpiling and return of topsoil;
  • backfilling all holes, trenches and costeans;
  • ripping;
  • contouring to the original landform;
  • revegetation with seed; and
  • capping and backfilling of all drill holes.
02-May-2016
51Prior to the cessation of exploration/prospecting activity the licensee notifying the Environmental Officer, DMP and arranging an inspection as required.02-May-2016
61The prior written consent of the Minister responsible for the Mining Act 1978 being obtained before commencing any exploration activities on Crown Reserve 9189 (Water Act 57 Vic No20).02-May-2016
71All disturbances to the surface of the land made as a result of exploration, including costeans, drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, DMIRS. Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, DMIRS.27-Jul-2018

Endorsements

Cond #VerTextStartEnd
11All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program.02-May-2016
21Unless the written approval of the Environmental Officer, DMP is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations.02-May-2016
1In respect to the area designated as CPL 50 in TENGRAPH the following conditions apply:02-May-2016
31Prior to any ground-disturbing activity, as defined by the Executive Director, Environment Division, DMP the licensee preparing a detailed program for each phase of proposed exploration for approval of the Executive Director, Environment Division, DMP. The program to include:
  • maps and/or aerial photographs showing all proposed routes, construction and upgrading of tracks, camps, drill sites and any other disturbances;
  • the purpose, specifications and life of all proposed disturbances;
  • proposals which may disturb any declared rare or geographically restricted flora and fauna; and
  • techniques, prescriptions and timetable for the rehabilitation of all proposed disturbances
02-May-2016
41The licensee, at his expense, rehabilitating all areas cleared, explored or otherwise disturbed during the term of the licence to the satisfaction of the Executive Director, Environment Division, DMP. Such rehabilitation as is appropriate and may include:
  • stockpiling and return of topsoil;
  • backfilling all holes, trenches and costeans;
  • ripping;
  • contouring to the original landform;
  • revegetation with seed; and
  • capping and backfilling of all drill holes.
02-May-2016
51Prior to the cessation of exploration/prospecting activity the licensee notifying the Environmental Officer, DMP and arranging an inspection as required.02-May-2016
61The prior written consent of the Minister responsible for the Mining Act 1978 being obtained before commencing any exploration activities on Crown Reserve 9189 (Water Act 57 Vic No20).02-May-2016
71All disturbances to the surface of the land made as a result of exploration, including costeans, drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, DMIRS. Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, DMIRS.27-Jul-2018

Dealings

TypeNumberDetails
Objection472619Lodged:15:55 07 August 2015Objectors:CARNEGIE GOLD PTY LTDObjection Type:Tenement ApplicationRECORDED:15:55 07 August 2015WITHDRAWN:00:00 27 November 2015Wardens Decision Made on:00:00 27 November 2015Wardens Decision Status:FinalisedWardens Decision Text:Objection Withdrawn.
Extension of Time472653Lodged:14:45 10 August 2015Type:Service on Tenement HolderRECORDED:14:45 10 August 2015APPROVED:17:00 17 August 2015
Application to Amend489472Lodged:11:02 28 June 2016Amending:Address (Including DTC Details)From:GOLDSTAR RESOURCES (WA) PTY LTD, SE 2 64 THOMAS ST, WEST PERTH, WA, 6005To:GOLDSTAR RESOURCES (WA) PTY LTD, C/- EASTERN GOLDFIELDS LTD, 24 MUMFORD PLACE, BALCATTA, WA, 6021RECORDED:11:02 28 June 2016
Forfeiture510545Initiated:18/07/2017 for non-compliance with rent requirementsRECORDED:15:56:41 14 July 2017Notice Issued:Regulation 50 Notice sent 18/07/2017 for non-compliance with rent requirements pursuant to Reg 109/Sec 63A- late payment of rent.Compliance Date:22/08/2017FINALISED:Order by Minister on 29 August 2017 that E 16/480 be Penalty Imposed
Fine513376Fine in respect to:Forfeiture Process 510545Fine reason:Non-compliance with rent obligationsPenalty amount:$283.00Notification date:31/08/2017Due date:05/10/2017Pursuant to:Section 96A(5)RECORDED:29 August 2017PAYMENT RECEIVED:05 October 2017FINALISED:05 October 2017Receipt Number:06-162888Amount:$283.00Remaining balance:$0.00
Forfeiture535129Initiated:17/07/2018 for non-compliance with rent requirementsRECORDED:08:35:13 17 July 2018Notice Issued:Regulation 50 Notice sent 17/07/2018 for non-compliance with rent requirements pursuant to Reg 109/Sec 63A- non payment of rent.Compliance Date:21/08/2018FINALISED:Order by Minister on 13 September 2018 that E 16/480 be Penalty Imposed
Fine539063Fine in respect to:Forfeiture Process 535129Fine reason:Non-compliance with rent obligationsPenalty amount:$462.00Notification date:14/09/2018Due date:19/10/2018Pursuant to:Section 96A(5)RECORDED:13 September 2018PAYMENT RECEIVED:18 October 2018FINALISED:18 October 2018Receipt Number:5260612527Amount:$462.00Remaining balance:$0.00
Application to Amend542384Lodged:14:40 08 November 2018Amending:Address (Including DTC Details)From:Principal Place of Business : GOLDSTAR RESOURCES (WA) PTY LTD, SAME AS CORRESPONDENCE and DTC :GOLDSTAR RESOURCES (WA) PTY LTD, C/- EASTERN GOLDFIELDS LTD, 24 MUMFORD PLACE, BALCATTA, WA, 6021To:Principal Place of Business : GOLDSTAR RESOURCES (WA) PTY LTD, C/- EASTERN GOLDFIELDS LTD, LEVEL 2, 220 ST GEORGES TERRACE, PERTH, WA, 6000 and DTC :GOLDSTAR RESOURCES (WA) PTY LTD, JACQUILINE LY, C/- EASTERN GOLDFIELDS LTD, PO BOX 7207, CLOISTERS SQUARE, PERTH, WA, 6850RECORDED:14:40 08 November 2018
Partial Surrender - Voluntary551109Lodged:15:45 05 April 2019Surrendered Blocks:KALGOORLIE 1881 b, c, d, j, o, t, ySurrendered Total:7 BL.REGISTERED:15:45 05 April 2019
Application to Amend569164Lodged:08:30 19 December 2019Amending:Address (Including DTC Details)From:Principal Place of Business : GOLDSTAR RESOURCES (WA) PTY LTD, C/- EASTERN GOLDFIELDS LTD, LEVEL 2, 220 ST GEORGES TERRACE, PERTH, WA, 6000 and DTC :GOLDSTAR RESOURCES (WA) PTY LTD, JACQUILINE LY, C/- EASTERN GOLDFIELDS LTD, PO BOX 7207, CLOISTERS SQUARE, PERTH, WA, 6850To:Principal Place of Business : GOLDSTAR RESOURCES (WA) PTY LTD, C/- ORA BANDA MINING LTD, LEVEL 1, 2 KINGS PARK ROAD, WEST PERTH, WA, 6005, xxxxxxxxx@orabandamining.com.au, xxxxx548 and DTC :GOLDSTAR RESOURCES (WA) PTY LTD, JACQUILINE LY, C/- ORA BANDA MINING LTD, PO BOX 464, WEST PERTH, WA, 6872, xxxxxxxxx@orabandamining.com.au, xxxxx548RECORDED:08:30 19 December 2019
Application to Amend569169Lodged:08:30 19 December 2019Amending:Address (Including DTC Details)From:Principal Place of Business : GOLDSTAR RESOURCES (WA) PTY LTD, C/- EASTERN GOLDFIELDS LTD, LEVEL 2, 220 ST GEORGES TERRACE, PERTH, WA, 6000 and DTC :GOLDSTAR RESOURCES (WA) PTY LTD, JACQUILINE LY, C/- EASTERN GOLDFIELDS LTD, PO BOX 7207, CLOISTERS SQUARE, PERTH, WA, 6850To:Principal Place of Business : GOLDSTAR RESOURCES (WA) PTY LTD, C/- ORA BANDA MINING LTD, LEVEL 1, 2 KINGS PARK ROAD, WEST PERTH, WA, 6005 and DTC :GOLDSTAR RESOURCES (WA) PTY LTD, JACQUILINE LY, PO BOX 464, WEST PERTH, WA, 6872, xxxxxxxxx@orabandamining.com.au, xxxxx548RECORDED:08:30 19 December 2019

Payments

TypeYearReceipt DateReceipt No.MR LodgedAmountRental AreaEffective DateAmt DueDiscrepancy
Rental202122-May-2020 10145958$2,563.0011 BL05-Apr-2019 $2,563.00$0.00
Rental202027-May-2019 10098036$2,420.0011 BL05-Apr-2019 $2,420.00$0.00
Rental201920-Aug-2018 86245102313$2,412.0018 BL02-May-2016 $2,412.00$0.00
Rental201823-Aug-2017 Ref$2,331.0018 BL02-May-2016 $2,331.00$0.00
Rental201702-May-2016 (REFUND) 520200378612KALGOORLIE$1,628.2518 BL02-May-2016 $2,254.50$0.00
Rental201721-Jul-2015 520200378612$3,882.75

Expenditure

YearForm 5 TypeMin ExpdExp Lodged DateTotal ExpdExemp NoExemp LodgedExemp AmtExemp StatusOutcome DateExploration ActivitiesMining ActivitiesAboriginal SurveyRentAdministrationProspectingStrike Through
2021$30,000.00false
2020Replacement$30,000.0027-Jul-2020 $30,553.00$21,458.00$0.00$0.00$3,095.00$6,000.00$0.00false
2020$30,000.0029-Jun-2020 $26,698.00$21,458.00$0.00$0.00$3,095.00$2,145.00$0.00true
2019$20,000.0025-Jun-2019 $23,480.00$15,828.00$0.00$0.00$3,652.00$4,000.00$0.00false
2018$20,000.0027-Jun-2018 $22,125.00$14,591.00$0.00$0.00$3,534.00$4,000.00$0.00false
2017$20,000.0023-Jun-2017 $24,329.00$17,804.00$0.00$0.00$2,525.00$4,000.00$0.00false

Native Title Referrals

Referred to Native Title DateReferral TypeCurrent StatusProcedureDetailsObjectionsWater CommentsDetermination AreasClaimsRepresentative Area Bodies
01-Dec-2015 Tenement ApplicationExpedited Procedure : Native Title Cleared - Expedited AppliesExpedited Procedure2015-12-162016-04-16CLEARED - Expedited Applies2016-05-0231 BL301029S1204030E64km SW'ly of Menzies13GoldfieldsNative Title Services Goldfields