Extracted from MTO on 16-Jan-2021 03:47,
last changed 16-Jan-2021.
# | Ver | Text | Start | End |
1 | 1 | All surface holes drilled for the purpose of exploration are to be capped, filled or otherwise made safe immediately after completion. | 12-Aug-2008 | |
2 | 1 | All costeans and other disturbances to the surface of the land made as a result of exploration, including drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Industry and Resources (DoIR). Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, DoIR. | 12-Aug-2008 | |
3 | 1 | All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program. | 12-Aug-2008 | |
4 | 1 | Unless the written approval of the Environmental Officer, DoIR is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations. | 12-Aug-2008 | |
5 | 1 | The Licensee notifying the holder of any underlying pastoral or grazing lease by telephone or in person, or by registered post if contact cannot be made, prior to undertaking airborne geophysical surveys or any ground disturbing activities utilising equipment such as scrapers, graders, bulldozers, backhoes, drilling rigs; water carting equipment or other mechanised equipment. | 12-Aug-2008 | |
6 | 1 | The Licensee or transferee, as the case may be, shall within thirty (30) days of receiving written notification of:-- the grant of the Licence; or
- registration of a transfer introducing a new Licensee;
advise, by registered post, the holder of any underlying pastoral or grazing lease details of the grant or transfer. | 12-Aug-2008 | |
Cond # | Ver | Text | Start | End |
1 | 1 | All surface holes drilled for the purpose of exploration are to be capped, filled or otherwise made safe immediately after completion. | 12-Aug-2008 | |
2 | 1 | All costeans and other disturbances to the surface of the land made as a result of exploration, including drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Industry and Resources (DoIR). Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, DoIR. | 12-Aug-2008 | |
3 | 1 | All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program. | 12-Aug-2008 | |
4 | 1 | Unless the written approval of the Environmental Officer, DoIR is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations. | 12-Aug-2008 | |
5 | 1 | The Licensee notifying the holder of any underlying pastoral or grazing lease by telephone or in person, or by registered post if contact cannot be made, prior to undertaking airborne geophysical surveys or any ground disturbing activities utilising equipment such as scrapers, graders, bulldozers, backhoes, drilling rigs; water carting equipment or other mechanised equipment. | 12-Aug-2008 | |
6 | 1 | The Licensee or transferee, as the case may be, shall within thirty (30) days of receiving written notification of:-- the grant of the Licence; or
- registration of a transfer introducing a new Licensee;
advise, by registered post, the holder of any underlying pastoral or grazing lease details of the grant or transfer. | 12-Aug-2008 | |
Type | Number | Details |
Caveat | 479H/034 | Pursuant to Section 120AA, Caveat 479H/034 by AUSTRALIAN NICKEL MINES NL in respect to 100/100ths shares in the name of ST. IVES GOLD MINING CO. PTY LTD lodged against E 15/201 is now effective against this tenement.RECORDED 12 Aug 2008Pursuant To:S120AACaveat Type:CaveatCaveat Number:190969,Primary Tenements:Lodged against E 15/201 is now effective against this tenement.Caveator:AUSTRALIAN NICKEL MINES NLShares Caveated:100/100 shares ST. IVES GOLD MINING COMPANY PTY LTDRECORDED:00:00 12 August 2008WITHDRAWN:15:50 29 November 2013 |
Extension / Renewal of Term | 428822 | Lodged:15:35 09 August 2013Applied For Period:5 YearsRECORDED:15:35 09 August 2013GRANTED:08 October 2013Granted Period:5 YearsTerm Extended To:11/08/2018 |
Withdrawal of Dealing | 436422 | Lodged:15:50 29 November 2013In respect to:Caveat 479H/034 (190969)RECORDED:15:50 29 November 2013 |
Caveat | 482570 | Lodged:15:45 29 February 2016Caveat Type:Absolute CaveatCaveator:APOLLO PHOENIX RESOURCES PTY LTDShares Caveated:100/100 shares MINCOR RESOURCES NLRECORDED:15:45 29 February 2016 |
Extension / Renewal of Term | 536910 | Lodged:14:19:36 10 August 2018Applied For Period:2 YearsRECORDED:14:19:36 10 August 2018GRANTED:29 January 2019Granted Period:2 YearsTerm Extended To:11/08/2020 |
Application to Amend | 537065 | Lodged:12:03:20 14 August 2018Amending:Address (Including DTC Details)From:Principal Place of Business : MINCOR RESOURCES NL, SAME AS CORRESPONDENCE and DTC :MINCOR RESOURCES NL, 1/56 ORD STREET, WEST PERTH, WA, 6005To:Principal Place of Business : MINCOR RESOURCES NL, PO BOX 1810, WEST PERTH, WA, 6872, xxxxxxx@mincor.com.au, xxxxx200 and DTC :MINCOR RESOURCES NL, NOLEEN KEMP, PO BOX 1810, WEST PERTH, WA, 6872, xxxxxxx@mincor.com.au, xxxxx200RECORDED:12:03:20 14 August 2018 |
Caveat | 537361 | Lodged:15:20 17 August 2018Caveat Type:Absolute CaveatCaveator:NEOMETALS LTDShares Caveated:100/100 shares MINCOR RESOURCES NLRECORDED:15:20 17 August 2018 |
Extension / Renewal of Term | 583958 | Lodged:13:03:02 11 August 2020Applied For Period:2 YearsRECORDED:13:03:02 11 August 2020GRANTED:05 October 2020Granted Period:2 YearsTerm Extended To:11/08/2022 |
Withdrawal of Dealing | 593965 | Lodged:16:22:46 15 January 2021In respect to:Caveat 482570PENDING |