# | Ver | Text | Start | End |
1 | 1 | All disturbances to the surface of the land made as a result of exploration, including costeans, drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Mines, Industry Regulations and Safety (DMIRS).Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, DMIRS. | 16-Oct-2017 | |
2 | 1 | All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program. | 16-Oct-2017 | |
3 | 1 | Unless the written approval of the Environmental Officer, DMIRS is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations. | 16-Oct-2017 | |
4 | 1 | The Licensee notifying the holder of any underlying pastoral or grazing lease by telephone or in person, or by registered post if contact cannot be made, prior to undertaking airborne geophysical surveys or any ground disturbing activities utilising equipment such as scrapers, graders, bulldozers, backhoes, drilling rigs; water carting equipment or other mechanised equipment. | 16-Oct-2017 | |
5 | 1 | The Licensee or transferee, as the case may be, shall within thirty (30) days of receiving written notification of:-- the grant of the Licence; or
- registration of a transfer introducing a new Licensee;
advise, by registered post, the holder of any underlying pastoral or grazing lease details of the grant or transfer. | 16-Oct-2017 | |
6 | 1 | The prior written consent of the Minister responsible for the Mining Act 1978 being obtained before commencing any exploration activities on Timber Reserve 5HR 19212 and Quarry Reserve 10137. | 16-Oct-2017 | |
7 | 1 | No excavation, excepting shafts, approaching closer to the Coolgardie-Esperance Highway, Highway verge or the road reserve than a distance equal to twice the depth of the excavation and mining on the Coolgardie-Esperance Highway or Highway verge being confined to below a depth of 30 metres from the natural surface. | 16-Oct-2017 | |
8 | 1 | The rights of ingress to and egress from Miscellaneous Licences 15/220, 15/315, 15/316 and 15/360 being at all times preserved to the licensees and no interference with the purpose or installations connected to the licences. | 16-Oct-2017 | |
9 | 1 | Mining on a strip of land 20 metres wide with any pipeline as the centreline being confined to below a depth of 31 metres from the natural surface and no mining material being deposited upon such strip and the rights of ingress to and egress from the facility being at all times preserved to the owners thereof. | 16-Oct-2017 | |
10 | 1 | No interference with Geodetic Survey Stations SSM-BBN 100, SSM-BBN 101, SSM-BBN 102 and SSM-BBN 103 and mining within 15 metres thereof being confined to below a depth of 15 metres from the natural surface. | 16-Oct-2017 | |
Cond # | Ver | Text | Start | End |
1 | 1 | All disturbances to the surface of the land made as a result of exploration, including costeans, drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Mines, Industry Regulations and Safety (DMIRS).Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, DMIRS. | 16-Oct-2017 | |
2 | 1 | All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program. | 16-Oct-2017 | |
3 | 1 | Unless the written approval of the Environmental Officer, DMIRS is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations. | 16-Oct-2017 | |
4 | 1 | The Licensee notifying the holder of any underlying pastoral or grazing lease by telephone or in person, or by registered post if contact cannot be made, prior to undertaking airborne geophysical surveys or any ground disturbing activities utilising equipment such as scrapers, graders, bulldozers, backhoes, drilling rigs; water carting equipment or other mechanised equipment. | 16-Oct-2017 | |
5 | 1 | The Licensee or transferee, as the case may be, shall within thirty (30) days of receiving written notification of:-- the grant of the Licence; or
- registration of a transfer introducing a new Licensee;
advise, by registered post, the holder of any underlying pastoral or grazing lease details of the grant or transfer. | 16-Oct-2017 | |
6 | 1 | The prior written consent of the Minister responsible for the Mining Act 1978 being obtained before commencing any exploration activities on Timber Reserve 5HR 19212 and Quarry Reserve 10137. | 16-Oct-2017 | |
7 | 1 | No excavation, excepting shafts, approaching closer to the Coolgardie-Esperance Highway, Highway verge or the road reserve than a distance equal to twice the depth of the excavation and mining on the Coolgardie-Esperance Highway or Highway verge being confined to below a depth of 30 metres from the natural surface. | 16-Oct-2017 | |
8 | 1 | The rights of ingress to and egress from Miscellaneous Licences 15/220, 15/315, 15/316 and 15/360 being at all times preserved to the licensees and no interference with the purpose or installations connected to the licences. | 16-Oct-2017 | |
9 | 1 | Mining on a strip of land 20 metres wide with any pipeline as the centreline being confined to below a depth of 31 metres from the natural surface and no mining material being deposited upon such strip and the rights of ingress to and egress from the facility being at all times preserved to the owners thereof. | 16-Oct-2017 | |
10 | 1 | No interference with Geodetic Survey Stations SSM-BBN 100, SSM-BBN 101, SSM-BBN 102 and SSM-BBN 103 and mining within 15 metres thereof being confined to below a depth of 15 metres from the natural surface. | 16-Oct-2017 | |
Type | Number | Details |
Application to Amend | 514836 | Lodged:10:34:57 19 September 2017Amending:Address (Including DTC Details)From:REED INDUSTRIAL MINERALS PTY LTD, MCMAHON MINING TITLE SERVICES PTY LTD, C/- MCMAHON MINING TITLE SERVICES PTY LTD, PO BOX 592, MAYLANDS, WA, 6931, xxxx@mmts.net.au, xxxxx997To:REED INDUSTRIAL MINERALS PTY LTD, MINERAL RESOURCES, C/- TENEMENT DEPARTMENT, PO BOX 1095, CANNING BRIDGE, APPLECROSS, WA, 6153, xxxxxxxxxxxx@mineralresources.com.au, xxxxxx600RECORDED:10:34:57 19 September 2017 |
Application to Amend | 572487 | Lodged:13:06:27 18 February 2020Amending:Address (Including DTC Details)From:Principal Place of Business : REED INDUSTRIAL MINERALS PTY LTD, C/- MCMAHON MINING TITLE SERVICES PTY LTD, PO BOX 592, MAYLANDS, WA, 6931, xxxx@mmts.net.au, xxxxx997 and DTC :REED INDUSTRIAL MINERALS PTY LTD, MINERAL RESOURCES, C/- TENEMENT DEPARTMENT, PO BOX 1095, CANNING BRIDGE, APPLECROSS, WA, 6153, xxxxxxxxxxxx@mineralresources.com.au, xxxxxx600To:Principal Place of Business : REED INDUSTRIAL MINERALS PTY LTD, C/- TENEMENT DEPARTMENT, PO BOX 1095 CANNING BRIDGE, APPLECROSS, WA, 6153, xxxxxxxxx@mrl.com.au, xxxxxxx600 and DTC :REED INDUSTRIAL MINERALS PTY LTD, MINERAL RESOURCES LIMITED, C/- TENEMENT DEPARTMENT, PO BOX 1095 CANNING BRIDGE, APPLECROSS, WA, 6153, xxxxxxxxx@mrl.com.au, xxxxxxx600RECORDED:13:06:27 18 February 2020 |