Extracted from MTO on 24-Jan-2021 03:59,
last changed 04-Sep-2020.
# | Ver | Text | Start | End |
1 | 1 | All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program. | 03-Jul-2017 | |
2 | 1 | Unless the written approval of the Environmental Officer, DMP is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations. | 03-Jul-2017 | |
3 | 1 | All disturbances to the surface of the land made as a result of exploration, including costeans, drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Mines and Petroleum (DMP). Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, DMP. | 03-Jul-2017 | |
Cond # | Ver | Text | Start | End |
1 | 1 | All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program. | 03-Jul-2017 | |
2 | 1 | Unless the written approval of the Environmental Officer, DMP is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations. | 03-Jul-2017 | |
3 | 1 | All disturbances to the surface of the land made as a result of exploration, including costeans, drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Mines and Petroleum (DMP). Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, DMP. | 03-Jul-2017 | |
Type | Number | Details |
Amalgamation | 511055 | Lodged:15:05 21 July 2017Amalgamating:Whole of former P 15/5745Situated within:External boundaries of E 15/1566Granted 19/01/2018 in respect to P 15/5745 |
Referred to Native Title Date | Referral Type | Current Status | Procedure | Details | Objections | Water Comments | Determination Areas | Claims | Representative Area Bodies |
07-Aug-2017 | Tenement Amalgamation | Expedited Procedure : Native Title Cleared - Expedited Applies | Expedited Procedure | 2017-08-232017-12-23CLEARED - Expedited Applies2018-01-1980.77 HA311239S1214812E14km E'ly of Kambalda | | | | Ngadju(WC1999/002)WC1999/002WAD6020/1998truePartially Determined | 13GoldfieldsNative Title Services Goldfields |
09-Jan-2017 | Tenement Application | Expedited Procedure : Native Title Cleared - Expedited Applies | Expedited Procedure | 2017-01-252017-05-25CLEARED - Expedited Applies2017-06-194 BL311229S121490E14km E'ly of Kambalda | | | | Ngadju(WC1999/002)WC1999/002WAD6020/1998truePartially Determined | 13GoldfieldsNative Title Services Goldfields |