Cache entry for E 15/1564

Extracted from MTO on 27-Sep-2020 04:06, last changed 27-Jun-2020.

Tenement Summary

Identifier:E 15/1564Type:Exploration Licence
Status:LiveDistrict:COOLGARDIE
Lodged:ONLINEArea:2 BL
Purposes:Term:5 Years
Markout:Received:28-Sep-2016 08:30
Commence:10-Oct-2017 Expiry:09-Oct-2022

Holders

Company NameSharesTotal Shares
JINDALEE RESOURCES LIMITED100100

Applicants on Receival

Company NameSharesTotal Shares
JINDALEE RESOURCES LIMITED100100

Shires

Shire NameShire NumberStartArea
COOLGARDIE SHIRE196028-Sep-2016 2.00000 BL

Conditions

#VerTextStartEnd
11All disturbances to the surface of the land made as a result of exploration, including costeans, drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, DMIRS. Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, DMIRS.10-Oct-2017
21All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program.10-Oct-2017
31Unless the written approval of the Environmental Officer, DMIRS is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations.10-Oct-2017
41The rights of ingress to and egress from Miscellaneous Licence 15/282 being at all times preserved to the licensee and no interference with the purpose or installations connected to the licence.10-Oct-2017
51No excavation, excepting shafts, approaching closer to the Coolgardie Esperance Highway Highway, Highway verge or the road reserve than a distance equal to twice the depth of the excavation and mining on the Coolgardie Esperane Highway Highway or Highway verge being confined to below a depth of 30 metres from the natural surface.10-Oct-2017
61The prior written consent of the Minister responsible for the Mining Act 1978 being obtained before commencing any exploration activities on Water Reserve 10654.10-Oct-2017
71No mining within 25 metres of either side of the Pipelpine Licence contained within Pipeline Licence No 59 as shown in TENGRAPH.10-Oct-2017
81No surface excavation approaching closer to the boundary of the Safety Zone established by condition 7 hereof than a distance equal to three times the depth of the excavation without the prior written approval of the Director Petroleum DMIRS10-Oct-2017
91No interference with the drainage pattern, and no parking, storage or movement of equipment or vehicles used in the course of mining within the Safety Zone established by Condition 7 hereof without the prior approval of the operators of the Pipeline Licence 59.10-Oct-2017
101The Licensee shall not excavate, drill, install, erect, deposit or permit to be excavated, drilled, installed, erected or deposited within the Safety Zone established in Condition 7 hereof, any pit, well, pavement, foundation, building, or other structure or installation, or material of any nature whatsoever without the prior written consent of the Director Petroleum DMIRS10-Oct-2017
111No explosives being used or stored within one hundred and fifty (150) metres of the Pipeline Licence 59 without the prior written consent of the Director Petroleum DMIRS.10-Oct-2017
121Mining on the Safety Zone established in Condition 7 hereof being confined to below a depth of 50 metres from the natural surface unless otherwise approved by the Director Petroleum DMIRS.10-Oct-2017
131The rights of ingress to and egress from the pipeline easement established in Condition 7 hereof being at all times preserved for employees, contractors and agents of the operators of the Pipeline Licence 59.10-Oct-2017
141Such further conditions as may from time to time be imposed by the Minister responsible for the Mining Act 1978 for the purpose of protecting the Pipeline Licence 59.10-Oct-2017
151No mining within 30 metres of either side and to a depth of 15 metres of the Rail Corridor Land RCL0000007 as shown in TENGRAPH without the prior written approval of the Minister responsible for the Mining Act 1978.10-Oct-2017
161No surface excavation approaching closer to the boundary of the Safety Zone established by Condition 15   hereof than a distance equal to three times the depth of the excavation without the prior written approval of the Resources Safety Division, DMIRS.10-Oct-2017
171Mining below 15 metres from the natural surface of the land in the Safety Zone established in Condition 15  hereof being approved by the Resources Safety Division, DMIRS in consultation with the operator of the railway on corridor land.10-Oct-2017
181No interference with the drainage pattern, and no parking, storage or movement of equipment or vehicles used in the course of mining within the Safety Zone established by Condition 15 hereof without the prior approval of the operator of the railway on corridor land.10-Oct-2017
191The Licensee not excavating, drilling, installing, erecting, depositing or permitting to be excavated, drilled, installed, erected or deposited within the Safety Zone established in Condition 15 hereof, any pit, well, pavement, foundation, building, or other structure or installation, or material of any nature whatsoever without the prior written consent of the Resources Safety Division, DMIRS.10-Oct-2017
201No explosives being used or stored within one hundred and fifty (150) metres of the rail corridor land without the prior written consent of the Director, Dangerous Goods and Petroleum Safety Branch, DMIRS.10-Oct-2017
211The rights of ingress to and egress from the rail corridor land being at all times preserved to the employees, contractors and agents of the operator of the railway on corridor land, and the Public Transport Authority of WA.10-Oct-2017
221Such further conditions as may from time to time be imposed by the Minister responsible for the Mining Act 1978 for the purpose of protecting the rail corridor land.10-Oct-2017

Endorsements

Cond #VerTextStartEnd
11All disturbances to the surface of the land made as a result of exploration, including costeans, drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, DMIRS. Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, DMIRS.10-Oct-2017
21All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program.10-Oct-2017
31Unless the written approval of the Environmental Officer, DMIRS is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations.10-Oct-2017
41The rights of ingress to and egress from Miscellaneous Licence 15/282 being at all times preserved to the licensee and no interference with the purpose or installations connected to the licence.10-Oct-2017
51No excavation, excepting shafts, approaching closer to the Coolgardie Esperance Highway Highway, Highway verge or the road reserve than a distance equal to twice the depth of the excavation and mining on the Coolgardie Esperane Highway Highway or Highway verge being confined to below a depth of 30 metres from the natural surface.10-Oct-2017
61The prior written consent of the Minister responsible for the Mining Act 1978 being obtained before commencing any exploration activities on Water Reserve 10654.10-Oct-2017
71No mining within 25 metres of either side of the Pipelpine Licence contained within Pipeline Licence No 59 as shown in TENGRAPH.10-Oct-2017
81No surface excavation approaching closer to the boundary of the Safety Zone established by condition 7 hereof than a distance equal to three times the depth of the excavation without the prior written approval of the Director Petroleum DMIRS10-Oct-2017
91No interference with the drainage pattern, and no parking, storage or movement of equipment or vehicles used in the course of mining within the Safety Zone established by Condition 7 hereof without the prior approval of the operators of the Pipeline Licence 59.10-Oct-2017
101The Licensee shall not excavate, drill, install, erect, deposit or permit to be excavated, drilled, installed, erected or deposited within the Safety Zone established in Condition 7 hereof, any pit, well, pavement, foundation, building, or other structure or installation, or material of any nature whatsoever without the prior written consent of the Director Petroleum DMIRS10-Oct-2017
111No explosives being used or stored within one hundred and fifty (150) metres of the Pipeline Licence 59 without the prior written consent of the Director Petroleum DMIRS.10-Oct-2017
121Mining on the Safety Zone established in Condition 7 hereof being confined to below a depth of 50 metres from the natural surface unless otherwise approved by the Director Petroleum DMIRS.10-Oct-2017
131The rights of ingress to and egress from the pipeline easement established in Condition 7 hereof being at all times preserved for employees, contractors and agents of the operators of the Pipeline Licence 59.10-Oct-2017
141Such further conditions as may from time to time be imposed by the Minister responsible for the Mining Act 1978 for the purpose of protecting the Pipeline Licence 59.10-Oct-2017
151No mining within 30 metres of either side and to a depth of 15 metres of the Rail Corridor Land RCL0000007 as shown in TENGRAPH without the prior written approval of the Minister responsible for the Mining Act 1978.10-Oct-2017
161No surface excavation approaching closer to the boundary of the Safety Zone established by Condition 15   hereof than a distance equal to three times the depth of the excavation without the prior written approval of the Resources Safety Division, DMIRS.10-Oct-2017
171Mining below 15 metres from the natural surface of the land in the Safety Zone established in Condition 15  hereof being approved by the Resources Safety Division, DMIRS in consultation with the operator of the railway on corridor land.10-Oct-2017
181No interference with the drainage pattern, and no parking, storage or movement of equipment or vehicles used in the course of mining within the Safety Zone established by Condition 15 hereof without the prior approval of the operator of the railway on corridor land.10-Oct-2017
191The Licensee not excavating, drilling, installing, erecting, depositing or permitting to be excavated, drilled, installed, erected or deposited within the Safety Zone established in Condition 15 hereof, any pit, well, pavement, foundation, building, or other structure or installation, or material of any nature whatsoever without the prior written consent of the Resources Safety Division, DMIRS.10-Oct-2017
201No explosives being used or stored within one hundred and fifty (150) metres of the rail corridor land without the prior written consent of the Director, Dangerous Goods and Petroleum Safety Branch, DMIRS.10-Oct-2017
211The rights of ingress to and egress from the rail corridor land being at all times preserved to the employees, contractors and agents of the operator of the railway on corridor land, and the Public Transport Authority of WA.10-Oct-2017
221Such further conditions as may from time to time be imposed by the Minister responsible for the Mining Act 1978 for the purpose of protecting the rail corridor land.10-Oct-2017

Dealings

TypeNumberDetails
Objection496530Lodged:09:57:35 07 November 2016Objectors:AVOCA MINING PTY LTDObjection Type:Tenement ApplicationLate objection and application for extension of time refused as tenement was recommended prior to lodgement of dealings.REJECTED:09:57:35 07 November 2016
Extension of Time496562Lodged:16:26:24 07 November 2016Type:ObjectionRECORDED:16:26:24 07 November 2016Late objection and application for extension of time refused as tenement was recommended prior to lodgement of dealings.REFUSED:16:59:48 07 November 2016
Application to Amend525712Lodged:16:11:13 15 March 2018Amending:Address (Including DTC Details)From:Principal Place of Business : JINDALEE RESOURCES LIMITED, C/- AUSTWIDE MINING TITLE MANAGEMENT PTY LTD, PO BOX 1434, WANGARA, WA, 6947 and DTC :JINDALEE RESOURCES LIMITED, AUSTWIDE MINING TITLE MANAGEMENT, C/- AUSTWIDE MINING TITLE MANAGEMENT PTY LTD, PO BOX 1434, WANGARA, WA, 6947, xxxxxxxxx@austwidemining.com.au, xxxxxxxxx400To:Principal Place of Business : JINDALEE RESOURCES LIMITED, C/- AUSTWIDE MINING TITLE MANAGEMENT PTY LTD, PO BOX 1434, WANGARA, WA, 6947, xxxxxxxxx@austwidemining.com.au, xxxxxxxxx400 and DTC :JINDALEE RESOURCES LIMITED, AUSTWIDE MINING TITLE MANAGEMENT PTY LTD, C/- AUSTWIDE MINING TITLE MANAGEMENT PTY LTD, PO BOX 1434, WANGARA, WA, 6947, xxxxxxxxx@austwidemining.com.au, xxxxxxxxx400RECORDED:16:11:13 15 March 2018

Payments

TypeYearReceipt DateReceipt No.MR LodgedAmountRental AreaEffective DateAmt DueDiscrepancy
Rental202006-Sep-2019 10113733$276.002 BL10-Oct-2017 $276.00$0.00
Rental201913-Sep-2018 DMIRS Rents JINDALEE$272.002 BL10-Oct-2017 $272.00$0.00
Rental201828-Sep-2016 67299749375$259.002 BL10-Oct-2017 $259.00$0.00

Expenditure

YearForm 5 TypeMin ExpdExp Lodged DateTotal ExpdExemp NoExemp LodgedExemp AmtExemp StatusOutcome DateExploration ActivitiesMining ActivitiesAboriginal SurveyRentAdministrationProspectingStrike Through
2020$15,000.00false
2019$15,000.0011-Nov-2019 $26,485.00$22,313.00$0.00$0.00$1,172.00$3,000.00$0.00false
2018$15,000.0004-Dec-2018 $16,164.00$11,880.00$0.00$0.00$1,284.00$3,000.00$0.00false

Native Title Referrals

Referred to Native Title DateReferral TypeCurrent StatusProcedureDetailsObjectionsWater CommentsDetermination AreasClaimsRepresentative Area Bodies
14-Dec-2016 Tenement ApplicationExpedited Procedure : Native Title Cleared - Expedited AppliesExpedited Procedure2017-01-112017-05-11CLEARED - Expedited Applies2017-10-102 BL31470S1214231E34km S'ly of WidgiemoolthaWO2017/03052017-05-03WC1999/002Objection Withdrawn2017-10-04Ngadju(WC1999/002)WC1999/002WAD6020/1998truePartially Determined13GoldfieldsNative Title Services Goldfields