1 | 1 | All disturbances to the surface of the land made as a result of exploration, including costeans, drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Mines and Petroleum (DMP). Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, DMP. | 09-May-2017 | |
2 | 1 | All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program. | 09-May-2017 | |
3 | 1 | Unless the written approval of the Environmental Officer, DMP is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations. | 09-May-2017 | |
4 | 1 | The rights of ingress to and egress from Miscellaneous Licence 15/282 being at all times preserved to the licensee and no interference with the purpose or installations connected to the licence. | 09-May-2017 | |
Cond # | Ver | Text | Start | End |
1 | 1 | All disturbances to the surface of the land made as a result of exploration, including costeans, drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Mines and Petroleum (DMP). Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, DMP. | 09-May-2017 | |
2 | 1 | All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program. | 09-May-2017 | |
3 | 1 | Unless the written approval of the Environmental Officer, DMP is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations. | 09-May-2017 | |
4 | 1 | The rights of ingress to and egress from Miscellaneous Licence 15/282 being at all times preserved to the licensee and no interference with the purpose or installations connected to the licence. | 09-May-2017 | |
Type | Number | Details |
Objection | 486641 | Lodged:08:30 13 May 2016Objectors:AVOCA MINING PTY LTDObjection Type:Tenement ApplicationRECORDED:08:30 13 May 2016WITHDRAWN:00:00 26 October 2016Wardens Decision Made on:00:00 26 October 2016Wardens Decision Status:Finalised |
Amalgamation | 512967 | Lodged:12:10 22 August 2017Amalgamating:Portion of former P 15/5418Situated within:External boundaries of E 15/1515Granted 12/02/2018 in respect to P 15/5418 |
Application to Amend | 584564 | Lodged:12:35 20 August 2020Amending:NameFrom:PIONEER RESOURCES LIMITEDTo:ESSENTIAL METALS LIMITEDAmending:Address (Including DTC Details)From:PIONEER RESOURCES LIMITED, C/- PO BOX 1787, WEST PERTH, WA, 6872To:ESSENTIAL METALS LIMITED, PO BOX 1787, WEST PERTH, WA, 6872RECORDED:12:35 20 August 2020 |
Referred to Native Title Date | Referral Type | Current Status | Procedure | Details | Objections | Water Comments | Determination Areas | Claims | Representative Area Bodies |
04-Sep-2017 | Tenement Amalgamation | Expedited Procedure : Native Title Cleared - Expedited Applies | Expedited Procedure | 2017-10-042018-02-04CLEARED - Expedited Applies2018-02-05187.16 HA314540S1213229E31km S'ly of Widgiemooltha | | | | Ngadju(WC1999/002)WC1999/002WAD6020/1998truePartially Determined | 13GoldfieldsNative Title Services Goldfields |
04-Sep-2017 | Tenement Amalgamation | Expedited Procedure : Re-notify | Expedited Procedure | 2017-09-202018-01-20FINALISED - To Be Renotified2017-09-20187.16 HA314540S1213229E31km S'ly of Widgiemooltha | | | | Ngadju(WC1999/002)WC1999/002WAD6020/1998truePartially Determined | 13GoldfieldsNative Title Services Goldfields |
24-Nov-2016 | Tenement Application | Expedited Procedure : Native Title Cleared - Expedited Applies | Expedited Procedure | 2016-12-142017-04-14CLEARED - Expedited Applies2017-05-0317 BL314629S1213459E31km S'ly of Widgiemooltha | | | | Ngadju(WC1999/002)WC1999/002WAD6020/1998truePartially Determined | 13GoldfieldsNative Title Services Goldfields |