Cache entry for E 15/1354

Extracted from MTO on 23-Sep-2020 03:58, last changed 27-Jun-2020.

Tenement Summary

Identifier:E 15/1354Type:Exploration Licence
Status:LiveDistrict:COOLGARDIE
Lodged:PERTHArea:4 BL
Purposes:Term:5 Years (Extended)
Markout:Received:09-Nov-2012 13:30
Commence:04-Feb-2014 Expiry:03-Feb-2024

Holders

Company NameSharesTotal Shares
STRINDBERG, Maxwell Peter9696

Applicants on Receival

Company NameSharesTotal Shares
STRINDBERG, Maxwell Peter9696

Relationships

Relationship TypeDealingDealing StatusTenementTenement Status
Amalgamation (Different holder)Amalgamation 517555GrantedP 15/4970Dead

Shires

Shire NameShire NumberStartArea
COOLGARDIE SHIRE196009-Nov-2012 4.00000 BL

Conditions

#VerTextStartEnd
11All surface holes drilled for the purpose of exploration are to be capped, filled or otherwise made safe immediately after completion.04-Feb-2014
21All disturbances to the surface of the land made as a result of exploration, including costeans, drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Mines and Petroleum (DMP). Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, DMP.04-Feb-2014
31All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program.04-Feb-2014
41Unless the written approval of the Environmental Officer, DMP is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations.04-Feb-2014
51The prior written consent of the Minister responsible for the Mining Act 1978 being obtained before commencing any exploration activities on Conservation of Flora and Fauna Reserve 33300, and Water Supply Reserve 33752.04-Feb-2014
61Mining on a strip of land 20 metres wide with any pipeline as the centreline being confined to below a depth of 31 metres from the natural surface and no mining material being deposited upon such strip and the rights of ingress to and egress from the facility being at all times preserved to the owners thereof.04-Feb-2014
71No mining within 25 metres of either side of the Goldfields Pipeline Licence 59 as shown in TENGRAPH.
04-Feb-2014
81No surface excavation approaching closer to the boundary of the Safety Zone established by condition 9 hereof than a distance equal to three times the depth of the excavation without the prior written approval of the State Mining Engineer DMP04-Feb-2014
91No interference with the drainage pattern, and no parking, storage or movement of equipment or vehicles used in the course of mining within the Safety Zone established by Condition 9 hereof without the prior approval of the operators of the Pipeline Licence 59.04-Feb-2014
101The Licensee shall not excavate, drill, install, erect, deposit or permit to be excavated, drilled, installed, erected or deposited within the Safety Zone established in Condition 9 hereof, any pit, well, pavement, foundation, building, or other structure or installation, or material of any nature whatsoever without the prior written consent of the State Mining Engineer DMP04-Feb-2014
111No explosives being used or stored within one hundred and fifty (150) metres of the Pipeline Licence 59 without the prior written consent of the State Mining Engineer DMP.04-Feb-2014
121Mining on the Safety Zone established in Condition 9 hereof being confined to below a depth of 50 metres from the natural surface unless otherwise approved by the State Mining Engineer DMP .04-Feb-2014
131The rights of ingress to and egress from the pipeline easement established in Condition 9 hereof being at all times preserved for employees, contractors and agents of the operators of the Pipeline Licence 59.
04-Feb-2014
141Such further conditions as may from time to time be imposed by the Minister responsible for the Mining Act 1978 for the purpose of protecting the Pipeline Licence 59.04-Feb-2014
151The rights of ingress to and egress from Miscellaneous Licences 15/61, 15/214 and 15/276 being at all times preserved to the licensee and no interference with the purpose or installations connected to the licences.04-Feb-2014
161No excavation, excepting shafts, approaching closer to the Goldfields Highway Highway, verge or the road reserve than a distance equal to twice the depth of the excavation and mining on the Goldfields Highway or Highway verge being confined to below a depth of 30 metres from the natural surface, and on any other road or road verge, to below a depth of 15 metres from the natural surface.04-Feb-2014
171No interference with the use of the Aerial Landing Ground and mining thereon being confined to below a depth of 15 metres from the natural surface.04-Feb-2014

Endorsements

Cond #VerTextStartEnd
11All surface holes drilled for the purpose of exploration are to be capped, filled or otherwise made safe immediately after completion.04-Feb-2014
21All disturbances to the surface of the land made as a result of exploration, including costeans, drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Mines and Petroleum (DMP). Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, DMP.04-Feb-2014
31All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program.04-Feb-2014
41Unless the written approval of the Environmental Officer, DMP is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations.04-Feb-2014
51The prior written consent of the Minister responsible for the Mining Act 1978 being obtained before commencing any exploration activities on Conservation of Flora and Fauna Reserve 33300, and Water Supply Reserve 33752.04-Feb-2014
61Mining on a strip of land 20 metres wide with any pipeline as the centreline being confined to below a depth of 31 metres from the natural surface and no mining material being deposited upon such strip and the rights of ingress to and egress from the facility being at all times preserved to the owners thereof.04-Feb-2014
71No mining within 25 metres of either side of the Goldfields Pipeline Licence 59 as shown in TENGRAPH.
04-Feb-2014
81No surface excavation approaching closer to the boundary of the Safety Zone established by condition 9 hereof than a distance equal to three times the depth of the excavation without the prior written approval of the State Mining Engineer DMP04-Feb-2014
91No interference with the drainage pattern, and no parking, storage or movement of equipment or vehicles used in the course of mining within the Safety Zone established by Condition 9 hereof without the prior approval of the operators of the Pipeline Licence 59.04-Feb-2014
101The Licensee shall not excavate, drill, install, erect, deposit or permit to be excavated, drilled, installed, erected or deposited within the Safety Zone established in Condition 9 hereof, any pit, well, pavement, foundation, building, or other structure or installation, or material of any nature whatsoever without the prior written consent of the State Mining Engineer DMP04-Feb-2014
111No explosives being used or stored within one hundred and fifty (150) metres of the Pipeline Licence 59 without the prior written consent of the State Mining Engineer DMP.04-Feb-2014
121Mining on the Safety Zone established in Condition 9 hereof being confined to below a depth of 50 metres from the natural surface unless otherwise approved by the State Mining Engineer DMP .04-Feb-2014
131The rights of ingress to and egress from the pipeline easement established in Condition 9 hereof being at all times preserved for employees, contractors and agents of the operators of the Pipeline Licence 59.
04-Feb-2014
141Such further conditions as may from time to time be imposed by the Minister responsible for the Mining Act 1978 for the purpose of protecting the Pipeline Licence 59.04-Feb-2014
151The rights of ingress to and egress from Miscellaneous Licences 15/61, 15/214 and 15/276 being at all times preserved to the licensee and no interference with the purpose or installations connected to the licences.04-Feb-2014
161No excavation, excepting shafts, approaching closer to the Goldfields Highway Highway, verge or the road reserve than a distance equal to twice the depth of the excavation and mining on the Goldfields Highway or Highway verge being confined to below a depth of 30 metres from the natural surface, and on any other road or road verge, to below a depth of 15 metres from the natural surface.04-Feb-2014
171No interference with the use of the Aerial Landing Ground and mining thereon being confined to below a depth of 15 metres from the natural surface.04-Feb-2014

Dealings

TypeNumberDetails
Amalgamation517555Lodged:15:05 01 November 2017Amalgamating:Portion of former P 15/4970Situated within:External boundaries of E 15/1354Granted 30/04/2018 in respect to P 15/4970
Extension / Renewal of Term547010Lodged:16:00 01 February 2019Applied For Period:5 YearsRECORDED:16:00 01 February 2019GRANTED:17 April 2019Granted Period:5 YearsTerm Extended To:03/02/2024

Payments

TypeYearReceipt DateReceipt No.MR LodgedAmountRental AreaEffective DateAmt DueDiscrepancy
Rental202121-Jan-2020 10130298$1,272.004 BL04-Feb-2014 $1,272.00$0.00
Rental202001-Feb-2019 06-168999PERTH$1,200.004 BL04-Feb-2014 $1,200.00$0.00
Rental201925-Jan-2018 06-164223PERTH$832.004 BL04-Feb-2014 $832.00$0.00
Rental201803-Mar-2017 06-158986PERTH$805.804 BL04-Feb-2014 $805.80$0.00
Rental201701-Mar-2016 06-152195PERTH$501.004 BL04-Feb-2014 $501.00$0.00
Rental201605-Mar-2015 06-143423PERTH$488.404 BL04-Feb-2014 $488.40$0.00
Rental201509-Nov-2012 06-117235PERTH$466.804 BL04-Feb-2014 $466.80$0.00

Expenditure

YearForm 5 TypeMin ExpdExp Lodged DateTotal ExpdExemp NoExemp LodgedExemp AmtExemp StatusOutcome DateExploration ActivitiesMining ActivitiesAboriginal SurveyRentAdministrationProspectingStrike Through
2021$30,000.00false
2020$30,000.0003-Apr-2020 $33,836.00$0.00$0.00$0.00$0.00$0.00$33,836.00false
2019$20,000.0021-Feb-2019 $22,861.00$0.00$0.00$0.00$0.00$0.00$22,861.00false
2018$20,000.0004-Apr-2018 $22,649.00$0.00$0.00$0.00$0.00$0.00$22,649.00false
2017$15,000.0029-Mar-2017 $17,637.00$0.00$0.00$0.00$0.00$0.00$17,637.00false
2016$15,000.0031-Mar-2016 $17,578.00$0.00$0.00$0.00$0.00$0.00$17,578.00false
2015$15,000.0025-Mar-2015 $17,899.00$0.00$0.00$0.00$0.00$0.00$17,899.00false

Native Title Referrals

Referred to Native Title DateReferral TypeCurrent StatusProcedureDetailsObjectionsWater CommentsDetermination AreasClaimsRepresentative Area Bodies
20-Nov-2017 Tenement AmalgamationExpedited Procedure : Native Title Cleared - Expedited AppliesExpedited Procedure2017-12-132018-04-13CLEARED - Expedited Applies2018-04-30122.98 HA31130S1213530E7km W'ly of Kambalda13GoldfieldsNative Title Services Goldfields
22-Feb-2013 Tenement ApplicationExpedited Procedure : Native Title Cleared - Expedited AppliesExpedited Procedure2013-03-132013-07-13CLEARED - Expedited Applies2013-07-264 BL31130S1213530E7km W'ly of Kambalda13GoldfieldsNative Title Services Goldfields