Cache entry for E 09/2313

Extracted from MTO on 28-Oct-2020 04:28, last changed 30-Jul-2020.

Tenement Summary

Identifier:E 09/2313Type:Exploration Licence
Status:LiveDistrict:GASCOYNE M.F.
Lodged:PERTHArea:15 BL
Purposes:Term:5 Years
Markout:Received:04-May-2018 14:58
Commence:09-Jul-2019 Expiry:08-Jul-2024

Holders

Company NameSharesTotal Shares
ZOHAR, Julie99100
ZOHAR, Shoshanna1100

Applicants on Receival

Company NameSharesTotal Shares
ZOHAR, Julie99100
ZOHAR, Shoshanna1100

Shires

Shire NameShire NumberStartArea
CARNARVON SHIRE154004-May-2018 15.00000 BL

Conditions

#VerTextStartEnd
11All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program.09-Jul-2019
21All disturbances to the surface of the land made as a result of exploration, including costeans, drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Mines, Industry Regulation and Safety. Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, Department of Mines, Industry Regulation and Safety.09-Jul-2019
31Unless the written approval of the Environmental Officer, Department of Mines, Industry Regulation and Safety is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations.09-Jul-2019
41The Licensee notifying the holder of any underlying pastoral or grazing lease by telephone or in person, or by registered post if contact cannot be made, prior to undertaking airborne geophysical surveys or any ground disturbing activities utilising equipment such as scrapers, graders, bulldozers, backhoes, drilling rigs; water carting equipment or other mechanised equipment.09-Jul-2019
51The Licensee or transferee, as the case may be, shall within thirty (30) days of receiving written notification of:-
  • the grant of the Licence; or
  • registration of a transfer introducing a new Licensee;
advise, by registered post, the holder of any underlying pastoral or grazing lease details of the grant or transfer.
09-Jul-2019
1In respect to the area designated as CPL 13 in TENGRAPH the following conditions apply:09-Jul-2019
61Prior to any ground-disturbing activity, as defined by the Executive Director, Resource and Environmental Compliance, Department of Mines, Industry Regulation and Safety (DMIRS) the licensee preparing a detailed program for each phase of proposed exploration for approval of the Executive Director, Resource and Environmental Compliance, DMIRS. The program to include:
  • maps and/or aerial photographs showing all proposed routes, construction and upgrading of tracks, camps, drill sites and any other disturbances;
  • the purpose, specifications and life of all proposed disturbances;
  • proposals which may disturb any declared rare or geographically restricted flora and fauna; and
  • techniques, prescriptions and timetable for the rehabilitation of all proposed disturbances
09-Jul-2019
71The licensee, at his expense, rehabilitating all areas cleared, explored or otherwise disturbed during the term of the licence to the satisfaction of the Executive Director, Resource and Environmental Compliance, DMIRS. Such rehabilitation as is appropriate and may include:
  • stockpiling and return of topsoil;
  • backfilling all holes, trenches and costeans;
  • ripping;
  • contouring to the original landform;
  • revegetation with seed; and
  • capping and backfilling of all drill holes.
09-Jul-2019
81Prior to the cessation of exploration/prospecting activity the licensee notifying the Environmental Officer, DMIRS and arranging an inspection as required.09-Jul-2019
91No interference with Geodetic Survey Station WOORAMEL 41, 83, 84, 84T AND 85 and mining within 15 metres thereof being confined to below a depth of 15 metres from the natural surface.09-Jul-2019
101No excavation, excepting shafts, approaching closer to the North West Coastal Highway, Highway verge or the road reserve than a distance equal to twice the depth of the excavation and mining on the North West Coastal Highway or Highway verge being confined to below a depth of 30 metres from the natural surface, and on any other road or road verge, to below a depth of 15 metres from the natural surface.09-Jul-2019
111No construction of any building within a 500 metre strip from the coast line, without the prior written approval of the Minister responsible for the Mining Act 1978 being obtained.09-Jul-2019
121The prior written consent of the Minister responsible for the Mining Act 1978 being obtained, with the concurrence of the Minister for Environment, before entering or commencing any prospecting or exploration activity on Preservation of Sedimentary Deposits Reserve 3088509-Jul-2019
131The prior written consent of the Minister responsible for the Mining Act 1978 being obtained before commencing any exploration activities on Recreation Reserve 11076 and Foreshore, Seabed and navigable waters.09-Jul-2019
141The prior written consent of the Minister responsible for the Mining Act 1978 being obtained before commencing any exploration activities on Marine Reserve 6 World Heritage listed area WHA1.09-Jul-2019

Endorsements

Cond #VerTextStartEnd
11All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program.09-Jul-2019
21All disturbances to the surface of the land made as a result of exploration, including costeans, drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Mines, Industry Regulation and Safety. Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, Department of Mines, Industry Regulation and Safety.09-Jul-2019
31Unless the written approval of the Environmental Officer, Department of Mines, Industry Regulation and Safety is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations.09-Jul-2019
41The Licensee notifying the holder of any underlying pastoral or grazing lease by telephone or in person, or by registered post if contact cannot be made, prior to undertaking airborne geophysical surveys or any ground disturbing activities utilising equipment such as scrapers, graders, bulldozers, backhoes, drilling rigs; water carting equipment or other mechanised equipment.09-Jul-2019
51The Licensee or transferee, as the case may be, shall within thirty (30) days of receiving written notification of:-
  • the grant of the Licence; or
  • registration of a transfer introducing a new Licensee;
advise, by registered post, the holder of any underlying pastoral or grazing lease details of the grant or transfer.
09-Jul-2019
1In respect to the area designated as CPL 13 in TENGRAPH the following conditions apply:09-Jul-2019
61Prior to any ground-disturbing activity, as defined by the Executive Director, Resource and Environmental Compliance, Department of Mines, Industry Regulation and Safety (DMIRS) the licensee preparing a detailed program for each phase of proposed exploration for approval of the Executive Director, Resource and Environmental Compliance, DMIRS. The program to include:
  • maps and/or aerial photographs showing all proposed routes, construction and upgrading of tracks, camps, drill sites and any other disturbances;
  • the purpose, specifications and life of all proposed disturbances;
  • proposals which may disturb any declared rare or geographically restricted flora and fauna; and
  • techniques, prescriptions and timetable for the rehabilitation of all proposed disturbances
09-Jul-2019
71The licensee, at his expense, rehabilitating all areas cleared, explored or otherwise disturbed during the term of the licence to the satisfaction of the Executive Director, Resource and Environmental Compliance, DMIRS. Such rehabilitation as is appropriate and may include:
  • stockpiling and return of topsoil;
  • backfilling all holes, trenches and costeans;
  • ripping;
  • contouring to the original landform;
  • revegetation with seed; and
  • capping and backfilling of all drill holes.
09-Jul-2019
81Prior to the cessation of exploration/prospecting activity the licensee notifying the Environmental Officer, DMIRS and arranging an inspection as required.09-Jul-2019
91No interference with Geodetic Survey Station WOORAMEL 41, 83, 84, 84T AND 85 and mining within 15 metres thereof being confined to below a depth of 15 metres from the natural surface.09-Jul-2019
101No excavation, excepting shafts, approaching closer to the North West Coastal Highway, Highway verge or the road reserve than a distance equal to twice the depth of the excavation and mining on the North West Coastal Highway or Highway verge being confined to below a depth of 30 metres from the natural surface, and on any other road or road verge, to below a depth of 15 metres from the natural surface.09-Jul-2019
111No construction of any building within a 500 metre strip from the coast line, without the prior written approval of the Minister responsible for the Mining Act 1978 being obtained.09-Jul-2019
121The prior written consent of the Minister responsible for the Mining Act 1978 being obtained, with the concurrence of the Minister for Environment, before entering or commencing any prospecting or exploration activity on Preservation of Sedimentary Deposits Reserve 3088509-Jul-2019
131The prior written consent of the Minister responsible for the Mining Act 1978 being obtained before commencing any exploration activities on Recreation Reserve 11076 and Foreshore, Seabed and navigable waters.09-Jul-2019
141The prior written consent of the Minister responsible for the Mining Act 1978 being obtained before commencing any exploration activities on Marine Reserve 6 World Heritage listed area WHA1.09-Jul-2019

Dealings

TypeNumberDetails
Extension of Time535033Lodged:14:20 13 July 2018Type:SecurityRECORDED:14:20 13 July 2018APPROVED:14:59:53 13 July 2018
Surrender - Outright578035Provisionally Lodged:08:30 15 May 2020REJECTED:08:30 15 May 2020

Payments

TypeYearReceipt DateReceipt No.MR LodgedAmountRental AreaEffective DateAmt DueDiscrepancy
Rental202128-Jul-2020 10155934$2,115.0015 BL09-Jul-2019 $2,115.00$0.00
Rental202004-May-2018 06-165533PERTH$2,010.0015 BL09-Jul-2019 $2,010.00$0.00

Expenditure

YearForm 5 TypeMin ExpdExp Lodged DateTotal ExpdExemp NoExemp LodgedExemp AmtExemp StatusOutcome DateExploration ActivitiesMining ActivitiesAboriginal SurveyRentAdministrationProspectingStrike Through
2021$20,000.00false
2020$20,000.0003-Jul-2020 $25,200.00$18,000.00$0.00$500.00$3,200.00$3,500.00$0.00false

Native Title Referrals

Referred to Native Title DateReferral TypeCurrent StatusProcedureDetailsObjectionsWater CommentsDetermination AreasClaimsRepresentative Area Bodies
03-Aug-2018 Tenement ApplicationExpedited Procedure : Native Title Cleared - Expedited AppliesExpedited Procedure2018-08-222018-12-22CLEARED - Expedited Applies2019-07-0815 BL25560S1141730E76km E'ly of DenhamWO2018/08592018-10-31WC1998/017Objection Withdrawn2019-07-04Gnulli(WC1997/028)WC1997/028WAD6161/1998falseDeterminedThe Malgana Shark Bay People's Application(WC1998/017)WC1998/017WAD6236/1998falsePartially Determined14GeraldtonYamatji Marlpa Aboriginal Corporation