Cache entry for E 09/2309

Extracted from MTO on 24-Sep-2020 04:37, last changed 27-Jun-2020.

Tenement Summary

Identifier:E 09/2309Type:Exploration Licence
Status:LiveDistrict:GASCOYNE M.F.
Lodged:ONLINEArea:70 BL
Purposes:Term:5 Years
Markout:Received:24-Apr-2018 10:07
Commence:12-Feb-2020 Expiry:11-Feb-2025

Holders

Company NameSharesTotal Shares
MINING INVESTMENTS AUSTRALIA PTY LTD100100

Applicants on Receival

Company NameSharesTotal Shares
MINING INVESTMENTS AUSTRALIA PTY LTD100100

Shires

Shire NameShire NumberStartArea
CARNARVON SHIRE154024-Apr-2018 58.00000 BL
UPPER GASCOYNE SHIRE847024-Apr-2018 12.00000 BL

Conditions

#VerTextStartEnd
11All disturbances to the surface of the land made as a result of exploration, including costeans, drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Mines, Industry Regulation and Safety. Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, Department of Mines, Industry Regulation and Safety.12-Feb-2020
21All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program.12-Feb-2020
31Unless the written approval of the Environmental Officer, Department of Mines, Industry Regulation and Safety is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations.12-Feb-2020
41The Licensee notifying the holder of any underlying pastoral or grazing lease by telephone or in person, or by registered post if contact cannot be made, prior to undertaking airborne geophysical surveys or any ground disturbing activities utilising equipment such as scrapers, graders, bulldozers, backhoes, drilling rigs; water carting equipment or other mechanised equipment.12-Feb-2020
51The Licensee or transferee, as the case may be, shall within thirty (30) days of receiving written notification of:-
  • the grant of the Licence; or
  • registration of a transfer introducing a new Licensee;
advise, by registered post, the holder of any underlying pastoral or grazing lease details of the grant or transfer.
12-Feb-2020
61No interference with Geodetic Survey Station SSM Kennedy Range 17 and mining within 15 metres thereof being confined to below a depth of 15 metres from the natural surface.12-Feb-2020
71No interference with the use of the Aerial Landing Ground and mining thereon being confined to below a depth of 15 metres from the natural surface.12-Feb-2020
81The prior written consent of the Minister responsible for the Mining Act 1978 being obtained before commencing any exploration activities on Natural Gas Pipeline Purposes Reserve 41367.12-Feb-2020
91No mining within 25 metres of either side of the petroleum pipeline licence area of PL40 and to a depth of 50 metres being the Consultation Area as shown in TENGRAPH, without the mining tenement holder and the petroleum pipeline licensee consulting with each other and reaching agreement on access and mining activities to be undertaken within the Consultation Area.12-Feb-2020
101No surface excavation approaching closer to the boundary of the Consultation Area than a distance equal to three times the depth of the excavation without the mining tenement holder and the petroleum pipeline licensee reaching agreement as to a lesser distance.12-Feb-2020
111No explosives being used or stored within 150 metres of the petroleum licence area without the mining tenement holder and the petroleum pipeline licensee reaching agreement as to a lesser distance.12-Feb-2020
121The rights of ingress to and egress from the petroleum pipeline licence area being at all times preserved for the employees, contractors and agents of the owners and operators of the pipeline.12-Feb-2020
131Such further conditions as may from time to time be imposed by the Minister responsible for the Mining Act 1978 for the purposes of protecting the pipeline and any existing condition imposed for this purpose may be cancelled or varied.12-Feb-2020

Endorsements

Cond #VerTextStartEnd
11All disturbances to the surface of the land made as a result of exploration, including costeans, drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Mines, Industry Regulation and Safety. Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, Department of Mines, Industry Regulation and Safety.12-Feb-2020
21All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program.12-Feb-2020
31Unless the written approval of the Environmental Officer, Department of Mines, Industry Regulation and Safety is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations.12-Feb-2020
41The Licensee notifying the holder of any underlying pastoral or grazing lease by telephone or in person, or by registered post if contact cannot be made, prior to undertaking airborne geophysical surveys or any ground disturbing activities utilising equipment such as scrapers, graders, bulldozers, backhoes, drilling rigs; water carting equipment or other mechanised equipment.12-Feb-2020
51The Licensee or transferee, as the case may be, shall within thirty (30) days of receiving written notification of:-
  • the grant of the Licence; or
  • registration of a transfer introducing a new Licensee;
advise, by registered post, the holder of any underlying pastoral or grazing lease details of the grant or transfer.
12-Feb-2020
61No interference with Geodetic Survey Station SSM Kennedy Range 17 and mining within 15 metres thereof being confined to below a depth of 15 metres from the natural surface.12-Feb-2020
71No interference with the use of the Aerial Landing Ground and mining thereon being confined to below a depth of 15 metres from the natural surface.12-Feb-2020
81The prior written consent of the Minister responsible for the Mining Act 1978 being obtained before commencing any exploration activities on Natural Gas Pipeline Purposes Reserve 41367.12-Feb-2020
91No mining within 25 metres of either side of the petroleum pipeline licence area of PL40 and to a depth of 50 metres being the Consultation Area as shown in TENGRAPH, without the mining tenement holder and the petroleum pipeline licensee consulting with each other and reaching agreement on access and mining activities to be undertaken within the Consultation Area.12-Feb-2020
101No surface excavation approaching closer to the boundary of the Consultation Area than a distance equal to three times the depth of the excavation without the mining tenement holder and the petroleum pipeline licensee reaching agreement as to a lesser distance.12-Feb-2020
111No explosives being used or stored within 150 metres of the petroleum licence area without the mining tenement holder and the petroleum pipeline licensee reaching agreement as to a lesser distance.12-Feb-2020
121The rights of ingress to and egress from the petroleum pipeline licence area being at all times preserved for the employees, contractors and agents of the owners and operators of the pipeline.12-Feb-2020
131Such further conditions as may from time to time be imposed by the Minister responsible for the Mining Act 1978 for the purposes of protecting the pipeline and any existing condition imposed for this purpose may be cancelled or varied.12-Feb-2020

Payments

TypeYearReceipt DateReceipt No.MR LodgedAmountRental AreaEffective DateAmt DueDiscrepancy
Rental202124-Apr-2018 83053390100$9,380.0070 BL12-Feb-2020 $9,380.00$0.00

Expenditure

YearForm 5 TypeMin ExpdExp Lodged DateTotal ExpdExemp NoExemp LodgedExemp AmtExemp StatusOutcome DateExploration ActivitiesMining ActivitiesAboriginal SurveyRentAdministrationProspectingStrike Through
2021$70,000.00false

Native Title Referrals

Referred to Native Title DateReferral TypeCurrent StatusProcedureDetailsObjectionsWater CommentsDetermination AreasClaimsRepresentative Area Bodies
03-Jul-2018 Tenement ApplicationExpedited Procedure : Native Title Cleared - Expedited AppliesExpedited Procedure2018-07-252018-11-25CLEARED - Expedited Applies2020-02-0770 BL241021S1152346E99.3km N'ly of Gascoyne junctionWO2018/08902018-11-16WC1997/028Objection Withdrawn2019-12-02WO2018/08942018-11-16WC2016/003Objection Withdrawn2020-02-06Gnulli(WC1997/028)WC1997/028WAD6161/1998falseDeterminedCombined Thiin-Mah Warriyangka, Tharrkari, Jiwarli(WC2016/003)WC2016/003WAD464/2016falseDetermined14GeraldtonYamatji Marlpa Aboriginal Corporation