Cache entry for E 09/2298

Extracted from MTO on 22-Sep-2020 03:40, last changed 12-Sep-2020.

Tenement Summary

Identifier:E 09/2298Type:Exploration Licence
Status:LiveDistrict:GASCOYNE M.F.
Lodged:ONLINEArea:1 BL
Purposes:Term:5 Years
Markout:Received:19-Feb-2018 13:44
Commence:09-Aug-2019 Expiry:08-Aug-2024

Holders

Company NameSharesTotal Shares
GASCOYNE METALS PTY LTD70100
MOJITO RESOURCES LIMITED30100

Applicants on Receival

Company NameSharesTotal Shares
GASCOYNE METALS PTY LTD70100
MOJITO RESOURCES LIMITED30100

Shires

Shire NameShire NumberStartArea
UPPER GASCOYNE SHIRE847019-Feb-2018 1.00000 BL

Conditions

#VerTextStartEnd
11All disturbances to the surface of the land made as a result of exploration, including costeans, drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Mines, Industry Regulation and Safety. Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, Department of Mines, Industry Regulation and Safety.09-Aug-2019
21All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program.09-Aug-2019
31Unless the written approval of the Environmental Officer, Department of Mines, Industry Regulation and Safety is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations.09-Aug-2019
41The Licensee notifying the holder of any underlying pastoral or grazing lease by telephone or in person, or by registered post if contact cannot be made, prior to undertaking airborne geophysical surveys or any ground disturbing activities utilising equipment such as scrapers, graders, bulldozers, backhoes, drilling rigs; water carting equipment or other mechanised equipment.09-Aug-2019
51The Licensee or transferee, as the case may be, shall within thirty (30) days of receiving written notification of:-
  • the grant of the Licence; or
  • registration of a transfer introducing a new Licensee;
advise, by registered post, the holder of any underlying pastoral or grazing lease details of the grant or transfer.
09-Aug-2019

Endorsements

Cond #VerTextStartEnd
11All disturbances to the surface of the land made as a result of exploration, including costeans, drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Mines, Industry Regulation and Safety. Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, Department of Mines, Industry Regulation and Safety.09-Aug-2019
21All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program.09-Aug-2019
31Unless the written approval of the Environmental Officer, Department of Mines, Industry Regulation and Safety is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations.09-Aug-2019
41The Licensee notifying the holder of any underlying pastoral or grazing lease by telephone or in person, or by registered post if contact cannot be made, prior to undertaking airborne geophysical surveys or any ground disturbing activities utilising equipment such as scrapers, graders, bulldozers, backhoes, drilling rigs; water carting equipment or other mechanised equipment.09-Aug-2019
51The Licensee or transferee, as the case may be, shall within thirty (30) days of receiving written notification of:-
  • the grant of the Licence; or
  • registration of a transfer introducing a new Licensee;
advise, by registered post, the holder of any underlying pastoral or grazing lease details of the grant or transfer.
09-Aug-2019

Dealings

TypeNumberDetails
Extension of Time525907Lodged:14:59:28 19 March 2018Type:SecurityRECORDED:14:59:28 19 March 2018Extension granted to COB 4 April 2018APPROVED:09:45 23 March 2018

Payments

TypeYearReceipt DateReceipt No.MR LodgedAmountRental AreaEffective DateAmt DueDiscrepancy
Rental202128-Jul-2020 10155904$369.001 BL09-Aug-2019 $369.00$0.00
Rental202019-Feb-2018 81329459279$322.001 BL09-Aug-2019 $322.00$0.00

Expenditure

YearForm 5 TypeMin ExpdExp Lodged DateTotal ExpdExemp NoExemp LodgedExemp AmtExemp StatusOutcome DateExploration ActivitiesMining ActivitiesAboriginal SurveyRentAdministrationProspectingStrike Through
2021$10,000.00false
2020$10,000.00false

Native Title Referrals

Referred to Native Title DateReferral TypeCurrent StatusProcedureDetailsObjectionsWater CommentsDetermination AreasClaimsRepresentative Area Bodies
03-May-2018 Tenement ApplicationExpedited Procedure : Native Title Cleared - Expedited AppliesExpedited Procedure2018-05-302018-09-30CLEARED - Expedited Applies2019-08-061 BL234729S1161230E164km SW'ly of ParaburdooWO2018/06692018-09-11WC2016/003Objection Withdrawn2019-08-05Combined Thiin-Mah Warriyangka, Tharrkari, Jiwarli(WC2016/003)WC2016/003WAD464/2016trueDetermined14GeraldtonYamatji Marlpa Aboriginal Corporation