Cache entry for E 09/2210

Extracted from MTO on 27-Sep-2020 04:06, last changed 01-Aug-2020.

Tenement Summary

Identifier:E 09/2210Type:Exploration Licence
Status:LiveDistrict:GASCOYNE M.F.
Lodged:ONLINEArea:7 BL
Purposes:Term:5 Years
Markout:Received:24-Aug-2016 11:42
Commence:06-Oct-2017 Expiry:05-Oct-2022

Holders

Company NameSharesTotal Shares
HURRICANE PROSPECTING PTY LTD10481048

Applicants on Receival

Company NameSharesTotal Shares
HURRICANE PROSPECTING PTY LTD10481048

Shires

Shire NameShire NumberStartArea
UPPER GASCOYNE SHIRE847024-Aug-2016 7.00000 BL

Conditions

#VerTextStartEnd
11All disturbances to the surface of the land made as a result of exploration, including costeans, drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, DMIRS. Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, DMIRS.06-Oct-2017
21All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program.06-Oct-2017
31Unless the written approval of the Environmental Officer, DMIRS is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations.06-Oct-2017
1In respect to the area designated as CPL 28 in TENGRAPH the following conditions apply:06-Oct-2017
41Prior to any ground-disturbing activity, as defined by the Executive Director, Environment Division, Department of Mines, Industry Regulation and Safety (DMIRS) the licensee preparing a detailed program for each phase of proposed exploration for approval of the Executive Director, Environment Division, DMIRS. The program to include:
  • maps and/or aerial photographs showing all proposed routes, construction and upgrading of tracks, camps, drill sites and any other disturbances;
  • the purpose, specifications and life of all proposed disturbances;
  • proposals which may disturb any declared rare or geographically restricted flora and fauna; and
  • techniques, prescriptions and timetable for the rehabilitation of all proposed disturbances
06-Oct-2017
51The licensee, at his expense, rehabilitating all areas cleared, explored or otherwise disturbed during the term of the licence to the satisfaction of the Executive Director, Environment Division, DMIRS. Such rehabilitation as is appropriate and may include:
  • stockpiling and return of topsoil;
  • backfilling all holes, trenches and costeans;
  • ripping;
  • contouring to the original landform;
  • revegetation with seed; and
  • capping and backfilling of all drill holes.
06-Oct-2017
61Prior to the cessation of exploration/prospecting activity the licensee notifying the Environmental Officer, DMIRS and arranging an inspection as required.06-Oct-2017

Endorsements

Cond #VerTextStartEnd
11All disturbances to the surface of the land made as a result of exploration, including costeans, drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, DMIRS. Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, DMIRS.06-Oct-2017
21All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program.06-Oct-2017
31Unless the written approval of the Environmental Officer, DMIRS is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations.06-Oct-2017
1In respect to the area designated as CPL 28 in TENGRAPH the following conditions apply:06-Oct-2017
41Prior to any ground-disturbing activity, as defined by the Executive Director, Environment Division, Department of Mines, Industry Regulation and Safety (DMIRS) the licensee preparing a detailed program for each phase of proposed exploration for approval of the Executive Director, Environment Division, DMIRS. The program to include:
  • maps and/or aerial photographs showing all proposed routes, construction and upgrading of tracks, camps, drill sites and any other disturbances;
  • the purpose, specifications and life of all proposed disturbances;
  • proposals which may disturb any declared rare or geographically restricted flora and fauna; and
  • techniques, prescriptions and timetable for the rehabilitation of all proposed disturbances
06-Oct-2017
51The licensee, at his expense, rehabilitating all areas cleared, explored or otherwise disturbed during the term of the licence to the satisfaction of the Executive Director, Environment Division, DMIRS. Such rehabilitation as is appropriate and may include:
  • stockpiling and return of topsoil;
  • backfilling all holes, trenches and costeans;
  • ripping;
  • contouring to the original landform;
  • revegetation with seed; and
  • capping and backfilling of all drill holes.
06-Oct-2017
61Prior to the cessation of exploration/prospecting activity the licensee notifying the Environmental Officer, DMIRS and arranging an inspection as required.06-Oct-2017

Dealings

TypeNumberDetails
Extension of Time495589Lodged:10:57:41 17 October 2016Type:SecurityRECORDED:10:57:41 17 October 2016APPROVED:14:29 18 October 2016
Application to Amend534349Lodged:10:16:01 05 July 2018Amending:Address (Including DTC Details)From:Principal Place of Business : HURRICANE PROSPECTING PTY LTD, 61 THE STRAND, BAYSWATER, WA, 6053, xxxxxxxxxxxx@gmail.com, xxxxxxx404 and DTC :HURRICANE PROSPECTING PTY LTD, 61 THE STRAND, BAYSWATER, WA, 6053To:Principal Place of Business : HURRICANE PROSPECTING PTY LTD, DEBLIN TENEMENT MANAGEMENT SERVICES, PO BOX 456, MOUNT HAWTHORN, WA, 6915, xxxx@deblin.com.au, xxxxxxx190 and DTC :HURRICANE PROSPECTING PTY LTD, THE TENEMENT MANAGER, DEBLIN TENEMENT MANAGEMENT SERVICES, PO BOX 456, MOUNT HAWTHORN, WA, 6915, xxxx@deblin.com.au, xxxxxxx190RECORDED:10:16:01 05 July 2018
Extension of Time545623Lodged:08:30 08 January 2019Type:Form 5RECORDED:08:30 08 January 2019APPROVED:13:32:04 08 January 2019Time to lodged extended to 15/01/2019
Forfeiture549296Initiated:14/03/2019 for non-compliance with reporting requirementsRECORDED:10:30 14 March 2019Notice Issued:Regulation 50 Notice sent 14/03/2019 for non-compliance with reporting requirements pursuant to Sec 115A.Compliance Date:18/04/2019FINALISED:Order by Minister on 20 May 2019 that E 09/2210 be Penalty Imposed
Fine554542Fine in respect to:Forfeiture Process 549296Fine reason:Non-compliance with mineral exploration reporting provisionsPenalty amount:$450.00Notification date:27/05/2019Due date:01/07/2019Pursuant to:Section 96A(5)RECORDED:27 May 2019PAYMENT RECEIVED:26 June 2019FINALISED:26 June 2019Receipt Number:94761488460Amount:$450.00Remaining balance:$0.00
Extension of Time568569Lodged:14:31:32 11 December 2019Type:Form 5RECORDED:14:31:32 11 December 2019APPROVED:09:25:39 13 December 2019Extension to lodge Form 5 to 12 December 2019.

Payments

TypeYearReceipt DateReceipt No.MR LodgedAmountRental AreaEffective DateAmt DueDiscrepancy
Rental202017-Oct-2019 97804415108$966.007 BL06-Oct-2017 $966.00$0.00
Rental201912-Nov-2018 9249119117$952.007 BL06-Oct-2017 $952.00$0.00
Rental201824-Aug-2016 66376168566$906.507 BL06-Oct-2017 $906.50$0.00

Expenditure

YearForm 5 TypeMin ExpdExp Lodged DateTotal ExpdExemp NoExemp LodgedExemp AmtExemp StatusOutcome DateExploration ActivitiesMining ActivitiesAboriginal SurveyRentAdministrationProspectingStrike Through
2020$20,000.00false
2019$20,000.0011-Dec-2019 $20,066.00$17,100.00$0.00$0.00$966.00$2,000.00$0.00false
2018$20,000.0010-Jan-2019 $20,902.50$15,575.00$0.00$0.00$1,327.50$4,000.00$0.00false

Native Title Referrals

Referred to Native Title DateReferral TypeCurrent StatusProcedureDetailsObjectionsWater CommentsDetermination AreasClaimsRepresentative Area Bodies
26-Apr-2017 Tenement ApplicationExpedited Procedure : Native Title Cleared - Expedited AppliesExpedited Procedure2017-05-172017-09-17CLEARED - Expedited Applies2017-10-067 BL245230S116440E155km E'ly of Gascoyne JunctionWajarri Yamatji #1(WC2004/010)WC2004/010WAD28/2019trueDetermined14GeraldtonYamatji Marlpa Aboriginal Corporation