Extracted from MTO on 17-Jan-2021 04:03,
last changed 04-Nov-2020.
# | Ver | Text | Start | End |
1 | 1 | All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program. | 08-Sep-2017 | |
2 | 1 | Unless the written approval of the Environmental Officer, DMP is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations. | 08-Sep-2017 | |
3 | 1 | The Licensee notifying the holder of any underlying pastoral or grazing lease by telephone or in person, or by registered post if contact cannot be made, prior to undertaking airborne geophysical surveys or any ground disturbing activities utilising equipment such as scrapers, graders, bulldozers, backhoes, drilling rigs; water carting equipment or other mechanised equipment. | 08-Sep-2017 | |
4 | 1 | The Licensee or transferee, as the case may be, shall within thirty (30) days of receiving written notification of:-- the grant of the Licence; or
- registration of a transfer introducing a new Licensee;
advise, by registered post, the holder of any underlying pastoral or grazing lease details of the grant or transfer. | 08-Sep-2017 | |
5 | 1 | The rights of ingress to and egress from Miscellaneous Licence 09/27 being at all times preserved to the licensee and no interference with the purpose or installations connected to the licence. | 08-Sep-2017 | |
6 | 1 | No interference with Geodetic Survey Station SSM-NMF 567 and mining within 15 metres thereof being confined to below a depth of 15 metres from the natural surface. | 08-Sep-2017 | |
7 | 1 | All disturbances to the surface of the land made as a result of exploration, including costeans, drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Mines, Industry Regulation and Safety. Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, Department of Mines, Industry Regulation and Safety. | 09-Jun-2020 | |
Cond # | Ver | Text | Start | End |
1 | 1 | All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program. | 08-Sep-2017 | |
2 | 1 | Unless the written approval of the Environmental Officer, DMP is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations. | 08-Sep-2017 | |
3 | 1 | The Licensee notifying the holder of any underlying pastoral or grazing lease by telephone or in person, or by registered post if contact cannot be made, prior to undertaking airborne geophysical surveys or any ground disturbing activities utilising equipment such as scrapers, graders, bulldozers, backhoes, drilling rigs; water carting equipment or other mechanised equipment. | 08-Sep-2017 | |
4 | 1 | The Licensee or transferee, as the case may be, shall within thirty (30) days of receiving written notification of:-- the grant of the Licence; or
- registration of a transfer introducing a new Licensee;
advise, by registered post, the holder of any underlying pastoral or grazing lease details of the grant or transfer. | 08-Sep-2017 | |
5 | 1 | The rights of ingress to and egress from Miscellaneous Licence 09/27 being at all times preserved to the licensee and no interference with the purpose or installations connected to the licence. | 08-Sep-2017 | |
6 | 1 | No interference with Geodetic Survey Station SSM-NMF 567 and mining within 15 metres thereof being confined to below a depth of 15 metres from the natural surface. | 08-Sep-2017 | |
7 | 1 | All disturbances to the surface of the land made as a result of exploration, including costeans, drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Mines, Industry Regulation and Safety. Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, Department of Mines, Industry Regulation and Safety. | 09-Jun-2020 | |
Type | Number | Details |
Extension of Time | 489742 | Lodged:09:30:27 01 July 2016Type:Service on PastoralistRECORDED:09:30:27 01 July 2016APPROVED:15:37 12 July 2016 |
Extension of Time | 492062 | Lodged:14:57:12 10 August 2016Type:Stat DecREJECTED - double up of same document lodged for Extension of Time 492064. |
Extension of Time | 492064 | Lodged:15:01:18 10 August 2016Type:SecurityRECORDED:15:01:18 10 August 2016APPROVED:10:50 12 August 2016 |
Extension of Time | 492355 | Lodged:14:31:49 16 August 2016Type:SecurityRECORDED:14:31:49 16 August 2016WITHDRAWN:15:12:57 16 August 2016 |
Extension of Time | 542592 | Lodged:10:40 09 November 2018Type:Form 5RECORDED:10:40 09 November 2018APPROVED:15:29:16 13 November 2018Time to lodge extended to 08/11/2018 |
Amalgamation | 548985 | Lodged:08:30 08 March 2019Amalgamating:Whole of M 09/81Situated within:External boundaries of E 09/2195Granted 12/08/2019 in respect to M 09/81 |
Amalgamation | 549429 | Lodged:11:07 15 March 2019Amalgamating:Whole of former M 09/81Situated within:External boundaries of E 09/2195Refused 12/08/2019 in respect to M 09/81 |
Excess Tonnage | 577815 | Lodged:09:41:05 13 May 2020RECORDED:09:41:05 13 May 2020GRANTED:15:20:25 29 May 2020Additional 500 tonnes |
Application to Amend | 584936 | Lodged:14:32:27 27 August 2020Amending:Address (Including DTC Details)From:Principal Residence : MILLAR, James Arthur, COBRA STATION, MAIL BAG 28 - CARNARVON POST OFFICE, CARNARVON, WA, 6701 and DTC :MILLAR, James Arthur, C/- EMERALD TENEMENT SERVICES, P O BOX 383, NORTH PERTH, WA, 6906To:Principal Residence : MILLAR, James Arthur, C/- AUSTWIDE MINING TITLE MANAGEMENT PTY LTD, PO BOX 1434, WANGARA, WA, 6947, xxxxxxxxx@austwidemining.com.au, xxxxxxx400 and DTC :MILLAR, James Arthur, AUSTWIDE MINING TITLE MANAGEMENT PTY LTD, C/- AUSTWIDE MINING TITLE MANAGEMENT PTY LTD, PO BOX 1434, WANGARA, WA, 6947, xxxxxxxxx@austwidemining.com.au, xxxxxxx400REJECTED:14:32:27 27 August 2020 |
Application to Amend | 585059 | Lodged:15:56:48 28 August 2020Amending:Address (Including DTC Details)From:Principal Residence : MILLAR, James Arthur, COBRA STATION, MAIL BAG 28 - CARNARVON POST OFFICE, CARNARVON, WA, 6701 and DTC :MILLAR, James Arthur, C/- EMERALD TENEMENT SERVICES, P O BOX 383, NORTH PERTH, WA, 6906To:Principal Residence : MILLAR, James Arthur, C/- AUSTWIDE MINING TITLE MANAGEMENT PTY LTD, PO BOX 1434, WANGARA, WA, 6947, xxxxxxxxx@austwidemining.com.au, xxxxxxx400 and DTC :MILLAR, James Arthur, AUSTWIDE MINING TITLE MANAGEMENT PTY LTD, C/- AUSTWIDE MINING TITLE MANAGEMENT PTY LTD, PO BOX 1434, WANGARA, WA, 6947, xxxxxxxxx@austwidemining.com.au, xxxxxxx400RECORDED:15:56:48 28 August 2020 |
Referred to Native Title Date | Referral Type | Current Status | Procedure | Details | Objections | Water Comments | Determination Areas | Claims | Representative Area Bodies |
13-Mar-2019 | Tenement Amalgamation | Expedited Procedure : Native Title Cleared - Expedited Applies | Expedited Procedure | 2019-03-272019-07-27CLEARED - Expedited Applies2019-08-0611.98 HA24722S1162248E156km NE'ly of Gascoyne Junction | WO2019/04182019-05-07WC2016/003Objection Withdrawn2019-06-26 | | Combined Thiin-Mah, Warriyangka, Tharrkari and Jiwarli People(WCD2019/003)WC2016/003WAD464/2016falseWCD2019/003EXISTYes | Combined Thiin-Mah Warriyangka, Tharrkari, Jiwarli(WC2016/003)WC2016/003WAD464/2016trueDetermined | 14GeraldtonYamatji Marlpa Aboriginal Corporation |
15-Sep-2016 | Tenement Application | Expedited Procedure : Native Title Cleared - Expedited Applies | Expedited Procedure | 2016-10-052017-02-05CLEARED - Expedited Applies2017-09-0710 BL2460S116210E156km NE'ly of Gascoyne Junction | WO2017/00122016-01-04WC2016/003Objection Withdrawn Agreement2017-09-07 | | | Combined Thiin-Mah Warriyangka, Tharrkari, Jiwarli(WC2016/003)WC2016/003WAD464/2016falseDetermined | 14GeraldtonYamatji Marlpa Aboriginal Corporation |